Records from 2018 to 2023. Most recent: inspection, 6 May 2023.
Inspection history · 5
6 May 2023
Administrative Inspection · COC-GAS Annual
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7682178
26 April 2022
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7435263
19 April 2022
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7427346
2 September 2020
PSC B · COC-GAS Renew
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7045206
21 June 2018
Deficiency Check · Ballast Water Examination · ISPS II Exam · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6446598
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 19 April 2022
Resolved
Two Oxygen sensors shall be positioned at appropriate locations in the space or spaces containing the inert gas system. If the oxygen level falls below 19%, these sensors shall trigger both visible and audible alarms inside and outside the space. PSCO observed no audible alarm in the inert gas space.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 May 2022
Resolved 26 April 2022
Resolution: PSCO verified that the vessel had installed 2 audible & visual alarms for the Nitrogen Plant room. One on the inside of the space and the other outside in the passageway at the door leading to the space. Tested the operation of the alarms satisfatorily.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 2 September 2020
Resolved
Relief valve on deck tank and #4 stbd connection and tamper seal is broken. No liquified gas can be loaded in the above tank until set and sealed by a competent authority to the acceptance of nadministration.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2020
Resolved 13 September 2020
Resolution: Vessel emailed documentation stating on the 12th September 2020, the safety valves of CT4S and Deck tank were tested and installed new seals by service technicians from Puffer Sweiven. Reports added to Misle activity.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 21 June 2018
Resolved
SOLAS VII/13.1 IGC93/3.6.2 A gas carrier shall comply with the requirements of the IGC code. Airlock doors should be self-closing and without any hold back arrangement. During PSC examination, team found that outside airlock door did not have self closing arrangements. 17AC.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2018
Resolution: Received, reviewed and accepted class report from DNVGL stating the deficiency was rectified. Airlock was repaired by crew.
Communications › Visual Communication › Red Warning Signal
Issued 21 June 2018
Resolved
SOLAS VII/13.1 IGC 93.3.6.3 An audible and visual alarm system to give a warning on both sides of the airlock should be provided to indicate if more than one door is moved from the closed position. During inspection the visual alarm outside of the airlock was not working when both doors were open. 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 June 2018
Resolution: Received, reviewed and accepted class report from DNVGL stating the deficiency was rectified. Defective parts were replaced.
Documentation › Safety Management System › Key Shipboard Operations Plans/Instructions
Issued 21 June 2018
Resolved
SOLAS IX/3.1 ISM10.1 The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. Manufacturer of the vessel's fixed gas detection system requires monthly calibration. Currently vessel only calibrates annually by a third party. 50a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 July 2018
Resolved 22 June 2018
Resolution: Received, reviewed and accepted class report from DNVGL stating the deficiency was rectified. SMS had been fully implimented on board and crew was able to produce requested documents.