Records from 2019 to 2025. Most recent: inspection, 18 November 2025.
Inspection history · 5
18 November 2025
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8267967
19 October 2022
In-Service Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7580238
27 August 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7544594
22 August 2022
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7540389
24 April 2019
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6669089
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 October 2022
Resolved
The condition of the ship and its equipment shall be maintained to confirm with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. While anchored, on 19 October 2022, the vessel was allided with on the starboard side causing visible damage to the hull near the unloaded water line.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 October 2022
Resolution: USCG Team on scene confirmed no structural damage.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 22 August 2022
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company; in meeting these requirements, the company should ensure that: inspections are held at appropriate intervals; any non-conformity is reported, with its possible cause, if known; appropriate corrective action is taken.
VOP-S-05 states in section 1.2, "Inspection and maintenance of life saving and fire-fighting equipment planning and performance of maintenance of the fire-fighting equipment is done as per 'planned maintenance schedule of life-saving and fire-fighting equipment (attachment 1)'." VOP and referenced Attachment 1 does not specify proper testing procedures for testing fixed fire detection systems. As dilineated in deficiency 02, crew does not have quipment to test fire detection. In addition, PSCE observed crew attempting to test heat detection with torch. When PSCE asked about SMS procedures, crew stated they did not have the correct part to test, but only ordered needed equipment today.
VOP-E-04/A "Critical Equipment Testing Schedule" states and shows oily water separator: recirculation valve/pump stop shall be checked by C/E monthly. PSCE observed monthly checks did not include recirculation valves. As dilineated in deficiency 04, recirculation valve is inoperable with records of parts ordered in November 2021. Crew found ordered part onboard, though no plans for replacing were discussed or actions for replacement initiated. Crew has been testing system without flow.
Recommend internal audit with a focus on testing procedures for fixed fire detection, and for testing Oily Water separator. Internal audit to be completed within 30 days.
74SOLAS(20) IX/3.1
ISM Code 10.1, 10.2.1, 10.2.2, 10.2.3
Action Taken: 705ac
Condition: Invalid
Action required: 705 - Other - as specified
Due 21 September 2022
Resolved 23 September 2022
Resolution: Received documentation from company of internal audit with root cause analysis, corrective, and preventative actions to be taken.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 22 August 2022
Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use; and fire-protection systems and fire-fighting systems and appliances shall be properly tested and inspected.
PSCO observed crew unable to test fire detection systems. Crew stated there is no proper testing equipment onboard.
74SOLAS(14) II-2/14.1
Action Taken: 17ac
26AUG22:
Vessel provided substantial evidence of their inability to obtain IR testing equipment. The requested part is already delivered in Port Everglades. Amended deficiency to next US port.
Condition: Invalid
Action required: 15 - Rectify deficiencies by next port
Resolved 1 September 2022
Resolution: Sec Miami PSC recieved class report stating that the appropriate testing requirements were received by the ship in Port Everglades and that appropriate testing was immediately conducted.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 22 August 2022
Resolved
Doors required to be self-closing shall not be fitted with hold-back hooks. Howeer, hold back arrangements fitted with remote release devices of the fail-safe type may be utilized.
PSCE observed hold back line on self-closing door in steering gear room, leading to Emergency Fire-pump.
Cite: 74SOLAS(14) II-2/9.4.2.2
Action Taken: 10c
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 22 August 2022
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 22 August 2022
Resolved
Oil filtering equipment referred to in paragraph 2 of this regulation shall comply with paragraph 6 of this regulation. In addition, it shall be provided with alarm arragements to indicate when this level cannot be maintained. The system shall also be provided with arrangements to ensure that any discharge of oily mixtures is automatically stopped when the oil content of the effluent exceeds 15ppm. In considering the design of such equipment and approvals, the Administration shall have regard to the specification recommended by the Organization.
PSCO unable to verify operation of OWS due to inoperable recirculation valves. Crew tested alarm without flow, and when asked by PSCOs to test with flow, received high temperature alarm on OCM. Crew could not produce successful test with observable flow, and automatic stop.
Cite: MARPOL I/14.7
Action Taken 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 August 2022
Resolution: Class documentation provided to attest to the proper testing of OWS.