← All vessels
GEORGE III
GEORGE III is a 2022 freight ship. The Coast Guard has recorded 36 inspections since 2018, most recently in March 2026, along with 34 deficiencies — 1 with no resolution recorded —, 3 operational controls and 2 casualty investigations between 2021 and 2024.
Records from 2018 to 2026. Most recent: inspection, 14 March 2026.
- Built
- 2022
- Last inspected
- 14 March 2026
- Documentation
- Valid · documentation file of 10 August 2026
- Deficiencies
- 34 recorded · 1 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 2 investigations · 2021–2024
Identity
1289010
9837092
WDK4356
1486054
Flag
UNITED STATES
Maury page id
psix-1486054
Inspections, by type
…with no type recorded3
Years with a record
8 calendar years (2018–2026)
The 36 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.
Documentation record
Registered dimensions (L × B × D)725.8 ft × 114.8 ft × 57.0 ft
Registered tonnagegross 45,397 / net 34,725
ITC dimensions (L × B × D)725.8 ft × 114.8 ft × 57.0 ft
ITC tonnagegross 45,645 / net 16,599
BuilderKEPPEL AMFELS INC · BROWNSVILLE, TX, UNITED STATES · built 2022
Hull materialSteel
PropulsionDual Fuel (Diesel & Liquefied
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHONOLULU, HI
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 4 February 2026 · expires 28 February 2027
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it45645 - Convention (Subpart B), Gross Ton
45397 - Regulatory (Subpart C or D), Gross Ton
16599 - Convention (Subpart B), Net Ton
34725 - Regulatory (Subpart C or D), Net Ton
45397 - Regulatory (Subpart C or D), Gross Ton
16599 - Convention (Subpart B), Net Ton
34725 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.
Inspection history · 36
14 March 2026
Explosive Handling Operation-Commercial
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8327533
12 March 2026
Bulk Liquid Transfer Monitor
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8325476
5 March 2026
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8320482
29 October 2025
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8261258
14 October 2025
Bulk Liquid Transfer Monitor
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8251967
23 September 2025
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8239744
8 May 2025
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8131278
22 January 2025
ISM Oversight · Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8072490
6 December 2024
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8044003
4 December 2024
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8044377
23 November 2024
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8038926
8 November 2024
Deficiency Check · In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8026072
27 October 2024
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8025171
25 October 2024
ACP Annual Oversight · Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8025834
24 October 2024
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8025836
23 October 2024
Administrative Inspection · Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8024032
20 September 2024
Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8006583
3 August 2024
Explosive Handling Operation-Commercial
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7973316
1 August 2024
Explosive Handling Operation-Commercial
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7975717
25 June 2024
Explosive Handling Operation-Commercial
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7944126
22 June 2024
Explosive Handling Operation-Commercial
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7939894
28 January 2024
Administrative Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7898419
26 October 2023
Bulk Liquid Transfer Monitor
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7815111
18 August 2023
Annual Inspection · ACP Annual Oversight · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7751124
15 February 2023
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7637149
17 August 2022
In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7535706
27 July 2022
COI Inspection · ACP Handover Survey · Initial Certification
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 7518213
19 July 2022
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 7511219
1 October 2021
Type not recorded
No type recorded · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 7343182
23 October 2019
Construction Oversight · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6840582
19 December 2018
Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6600654
30 November 2018
Construction Oversight
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6596518
5 October 2018
Construction Oversight · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6564677
27 September 2018
Construction Oversight
Physical examination · Activities Europe · Activity 6549696
25 September 2018
Construction Oversight
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6547905
9 February 2018
Inclining Experiment · Construction Oversight
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 6352749
Deficiency record · 34
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 22 January 2025
Resolved
The company should periodically evaluate the effectiveness of the safety management system in accordance with procedures established by the company. The audits and corrective actions should be carried out in accordance with documented procedures. On 24OCT2024 the vessel was issued a requirement to conduct an internal audit focused on the maintenance of the steering system. The provided audit did not follow established company procedures and did not contain objective evidence of an appropriately conducted or focused audit. Company shall arrange for an external vessel audit with a minimum scope to include this deficiency, the deficiency issued on 24OCT2024, and relevant aspects of the ISM Code.
74 SOLAS (20) IX/3.1 ISM Code 12.4
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 November 2024
Resolved
Hazardous areas on open decks and other spaces not addressed in this chapter shall be decided based on a recognized standard. The electrical equipment fitted within hazardous areas shall be according to the same standard. MI identified 06 deck lighting fixtures in the vicinity of the fuel storage tanks that appear to have been shorted out and are not operational. Repair and replace the lighting fixtures.
IGF Code 12.3.1
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 8 November 2024
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: fire detection and fire alarm systems. Vessel does not have on board testing equipment for heat detectors located in hazardous locations.
74 SOLAS (20) II-2/14.2.1.1.2
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 8 November 2024
Resolved
The machinery, associated piping systems and fittings shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to hot surfaces and other hazards. Replace section of insulation for fuel supply piping to main engine.
74SOLAS(20) II-1/26.1
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 8 November 2024
Resolved
The machinery, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. Vessel's LT cooling water three-way valves for all 03 generators are leaking.
74 SOLAS (20) II-1/26.1
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 October 2024
Resolved
A vessel must be provided with a main steering gear that is of adequate strength and capable of steering the vessel at all service speeds. Pilot reported the rudder jammed hard over to port during berthing process. 74 SOLAS(20) I/11
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 25 October 2024
Resolved
Scuppers and discharge pipes originating at any level and penetrating the shell either more than 450 mm below the freeboard deck or less than 600 mm above the Summer Load Line shall be provided with a non-return valve at the shell. MI observed leaking aft scupper (MSD overboard) valve with soft patch and clamps. ICLL (88) Annex 1 22
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 October 2024
Resolved
Additional aids for escape shall be provided as necessary to ensure accessibility, clear marking, and adequate design for emergency situations. MI observed escape signage blocked in port tunnel at frame 41 outside of machine shop. 74 SOLAS (20) II-2/13.1.3
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 25 October 2024
Resolved
General arrangement plans shall be permanently exhibited for the guidance of the ship's officers, showing clearly for each deck the control stations, the various fire sections enclosed by "A" class division. MI observed self closing door to escape trunk in ECR, as identified on Fire Control Plan, unable to automatically close. 74 SOLAS (20) II-2/15.2.4.1
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 25 October 2024
Resolved
Each survival craft shall be stowed: in a state of continuous readiness so that two crew members can carry out preparations for embarkation and launching in less than 5 min. MI observed removable chain outboard of part and starboard life rafts seized preventing crew from ability to quickly deploy. 74 SOLAS (20) III/13.1.3
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 25 October 2024
Resolved
Maintenance... and inspections shall be carried out based on the guidelines developed by the Organization. Multi-cable transit at AC room found improperly sealed. 74 SOLAS (20) II-1/14.2.2.1
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 25 October 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. MI observed 4'' fracture inboard aft foot of natural vent pipe on mooring deck. 74 SOLAS (20) I/11
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 25 October 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Containment in aft most corner of purifier room IVO fuel tank kick valve found leaking diesel. 74 SOLAS (20) I/11
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 25 October 2024
Resolved
Your vessel must undergo an annual inspection within the 3 months before or after each anniversary date, except as required in paragraph (b) of this section. Vessels annual inspection was conducted without the oversight of a properly qualified machinery inspector holding the low flashpoint fuel qualification. Vessel shall make the vessel available to complete the required inspection. 46 CFR 91.27-1(a)
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 24 October 2024
Resolved
All the steering gear components and the rudder stock shall be of sound and reliable construction to the satisfaction of the Administration. No. 1 hydraulic reservoir tank is fractured and leaking at the return line. 74 SOLAS (20) II-1/29.2.1
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 24 October 2024
Resolved
All the steering gear components and the rudder stock shall be of sound and reliable construction to the satisfaction of the Administration. No. 2 steering gear pump oil cooler inlet line soft patched and leaking. 74 SOLAS (20) II-1/29.2.1
10 - Safety of Navigation › N/A - No Subsystem › Record of drills and steering gear tests
Issued 24 October 2024
Resolved
...No person may cause a vessel to enter into or get underway on the navigable waters of the United States unless no more than 12 hours before entering or getting underway, the following equipment has been tested: Each rudder angle indicator in relation to the actual position of the rudder. Provide photographs of pre departure test logs for departure from Port of Oakland on 23OCT2024. 33 CFR 164.25(a)(1)(iv)
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 24 October 2024
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. In meeting these requirements, the company should ensure that: any non-conformity is reported, with its possible cause, if known; appropriate corrective action is taken; and records of these activities are maintained. Vessels steering system and rudder angle indicators were found to be malfunctioning. Review of ships documentation indicate that the equipment had not been operating properly in the five months preceding the inspection and had yet to be rectified or had the root cause accurately identified. Inspections of the equipment further identified two additional deficiencies including a fracture on the hydraulic reservoir of the #1 steering pump. Company shall conduct an internal audit focused on the maintenance of the steering system and all of its associated components. 74 SOLAS (20) IX/3.1 ISM CODE 10.2
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 23 October 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea and without danger to the ship or persons onboard. Vessel reported 15 degree discrepancies between the command given at the help and the rudder angle indicator. Provide report attesting to the repair and proper operation of the steering and rudder angle indicator. 74 SOLAS (20) I/11
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2023
Resolved
Smoke detectors alone shall not be considered sufficient for rapid detection of a fire. Flame detectors for bunker stations and rooms of fuel gas system inoperable.
Vessel to submit a risk assessment for continued operations and repair plan. IGF 2016 / 11.7.2
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Construction (including exempt.)
Issued 18 August 2023
Resolved
The certificates and records of equipment shall be drawn up in the form corresponding to the models given. Cargo Ship Safety Construction Certificate does not properly endorse the vessel to operate with LNG as a fuel and does not document associated Alternative Designs approved by administration IAW SOLAS 20 II-1 / 55. 74 SOLAS (Consl 20) I / 15
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2023
Resolved
Prior to conducting bunkering operations, pre-bunkering verification shall be carried out and documented in the bunker safety checklist to include: Operation of fire detection equipment. Vessel does not currently have a means to test flame detectors and it is not included in pre-bunker safety checklist. IGF 2016 / 18.4.3
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2023
Resolved
Tank High and Overfill alarms shall be tested prior to fuel operation in accordance with 18.4.3 (Pre-bunker procedures). Vessel did not test high/overfill alarms prior to bunkering and it is not included in the Pre-bunker safety checklist.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2023
Resolved
A risk assessment shall be conducted to ensure that risks arising from the use of low-flashpoint fuels affecting persons on board, the environment, the structural. Approved risk assessment requires the opposite bunker station to be monitored. Vessel did not have CCTV monitored during bunkering ops and it is not included in bunkering procedures.
IGF 2016/4.2 Risk Assessment #35
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 August 2023
Resolved
A fuel system schematic/piping and instrumentation diagram (P&ID) shall be reproduced and permanently mounted in the ship's bunker control station and at the bunker station. Ship does not have a P&ID located at the bunkering station.
IGF 2016 / 18.4.2.2
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 18 August 2023
Resolved
The bunkering manifold shall be designed to withstand external loads during bunkering. Saddle to support Bunker line is too low and requires crew to utilize wood blocks and strap downs to secure it.
IGF 2016 / 8.4.1
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2023
Resolved
Equipment installed in hazardous areas shall be minimized to that required for operational purposes and shall be suitably and appropriately certified. Vessel is utilizing a chain fall for bunkering that is not certified for hazardous spaces.
IGF 2016 / 3.2.5
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2023
Resolved
All pipelines or components which may be isolated in a liquid full condition shall be provided with relief valves. Identified areas on HP return and LNG fuel supply lines from tanks with two valves in series and no relief valve.
IGF 2016 / 7.3.1.3
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2023
Resolved
The setting of the PRV's shall not be set higher than the vapor pressure that has been used in the design of the tank. Vessel unable to provide calibration/manfacturer certification for Tank PRV setting (MARVS).
IGF 2016 / 6.7.2.4
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2023
Resolved
The arrangement and installation of fuel piping shall provide the necessary flexibility to maintain the integrity of the piping system. Support bracket for PRV on high pressure skid found broken on a system that has had a previous failure.
IGF 2016 / 7.3.5
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2023
No resolution recorded
Each liquefied gas fuel tank shall be fitted with a high level alarm. STBD tank high level alarm is mislabeled when activated as a 98% overfill alarm.
IGF 2016 / 15.4.2.1
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2023
Resolved
An audible and visual alarm system to give warning on both sides of the airlock shall be provided to indicate if more than one door is moved from the closed position.
MI's found alarms for airlocks disabled.
IGF 2016 / 5.12.5
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 25 May 2021
Resolved
Multiple atex items have been and multiple items have been identified by ADMINISTRATION that have not been taken for action
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 29 April 2021
Resolved
IGF CODE 5.10 REGULATIONS FOR DRIP TREYS. DRIP TREY DO NOT MEET 5.10.1/5.10.4. multiple drip trey utilaze a cascade system to capture LNG and run to piping wit ha valve and flange arangement with n otrey under to protect carbon steel.
Casualty record · 2
1 October 2021Routine · role: Involved in a Marine Casualty · activity 7343182
24 October 2024Routine · role: Involved in a Marine Casualty · activity 8025836
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.