MAURY USCG vessel records
← All vessels

EUPEN

EUPEN is a 1999 tank ship. The Coast Guard has recorded 5 inspections since 2019, most recently in February 2021, along with 9 deficiencies and 1 operational control.

Records from 2019 to 2021. Most recent: inspection, 4 February 2021.

Built
1999
Last inspected
4 February 2021
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.

This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 4 February 2021
Operational controls None recorded without a removal date
Years with a record 3 calendar years (2019–2021)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9177806
493471
Flag
BELGIUM
Maury page id
psix-493471

Documentation record

Tonnage as PSIX records it40772 - Displacement, Metric Ton
29121 - Dead Weight, Metric Ton
23952 - Convention (Subpart B), Gross Ton
7650 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page

5 inspections, each with its date, unit and type; 9 deficiencies with the resolution recorded against each; 1 operational control with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 5

4 February 2021 PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7135595
13 October 2020 Administrative Inspection · PSC B · Ballast Water Examination · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7074882
28 January 2020 PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6897601
18 December 2019 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6876424
28 September 2019 ISM Oversight · ISPS II Exam · Ballast Water Examination · Deficiency Check · COC-GAS Renew · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6819507

Deficiency record · 9

02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 October 2020 Resolved
Electrical installations should be such as to minimize the risk of fire and explosion from flammable products. Multiple electrical panels, light fixatures and other electrical components inside the cargo compressor room and cargo deck areas were found improperly sealed. Specifically, the cable glands were missing or inadequate. Vessel is to rectify prior to cargo operations to the satisfaction of the RO and Coast Guard. 74SOLAS(14)VII/13.1, IGC 10.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 October 2020
Resolution: Class report submitted attesting to satsifactory repairs
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 28 September 2019 Resolved
The company should ensure that the master is fully conversant with the company's safety management system [6.1.2]. The company should ensure that all personnel involved in the company's safety management system have an adequate understanding of relevant rules, regulations, codes and guidelines [6.4]. The company should establish procedures to ensure that the ship is maintained in conformity witht he provisions of the relevant rules and regulations and with any additional requirements which may be established by the company [10.1]. In meeting these requirements, the company should ensure that: inspections are held at appropriate intervals [10.2.1]; any non-conformity is reported, with it's possible cause, if known [10.2.2]; and appropriate corrective action is taken [10.2.3]. A set of pre-arrival tests and checks shall be performed not more than 1 day before arrival in port (or monthly if more than one calls per month) [Ship Operations-Cargo/CARG-030 page 1/6]. Pre-arrival checks are to be carried out as per ship specific checklist and, where necessary, as per terminal requirements. This includes, but is not limited to: readiness of the water spray system [Ship Operations-Cargo/CARG-001 page 2/4]. A set of pre-arrival tests and checks shall be performed not more than 1 day before arrival tests and checks shall be performed not more than 1 day before arrival in port (or monthly if more than one calls per month).At a minimum, the following equipment will be tested: emergency shutdown system and closing time of ESD valves (result to be recorded). [Ship Operations-Cargo/CARG-030 page 1/6]. As delineated in deficiencies 2-4, the company failed to ensure that the master was fully conversant with the SMS procedures. Additionally, the company failed to ensure that all personnel, involved in the company's SMS had an adequate understanding of the relevant rules regulations, codes, and guidelines. Lastly, the objective evidence provided in the proceeding deficiencies attests to the company failing to ensure that inspections of the relevant systems were tested at regular intervals, with any non-conformities being reported, and subsequent action taken. An additional external verification of the vessels SMS, focusing on company procedures regarding resources, personnel, and maintenance of the ship is required. 74SOLAS(14) IX/3.1 Ref ISM Code 6.1.2 ISM Code 6.4 ISM Code 10.1 ISM Code 10.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 28 October 2019
Resolved 4 October 2019
Resolution: Flag state (Belgium) revolked the CAPT and Cheif Engineer from working in their administration. New CAPT and Cheif Engineer demonstrated leadership, knowledge, and the confidence to carry out SMS. Satisfactory fire and abandon ship drills conducted.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 28 September 2019 Resolved
Electrical installations should be such as to minimize the risk of fire and explosion from flammable products. All of the electrical panels, light fixtures, and other electrical components inside the cargo compressor room, above and around all of the cargo tank domes were found improperly sealed. Specifically, the cable glands were missing or inadequate. As a result, the wires were loose enough to be pushed easily in and out of the fittings. Over 90% were found loose and sealed improperly with caulk. This is objective evidence that the electrical fixtures and/or enclosures are no longer in conformity with the standards of certified safe equipment. 74SOLAS(14) VII/13.1 Ref IGC(93) 10.1.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 1 October 2019
Resolved 4 October 2019
Resolution: Recieved class report that electrical panels, light fixtures, and other electrical components were sealed. Cleared 06 definciencies and 02 deficiencies remain outstanding. Cleared XX deficiencies from (Name of Unit) Activity #XXXXXX.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 28 September 2019 Resolved
On ships carrying flammable or toxic products or both, a water-spray system for cooling, fire prevention and crew protection should be installed to cover: exposed cargo tank domes and any exposed parts of cargo tanks; exposed on-deck storage vessels for flammable or toxic products; [and,] cargo liquid and vapour discharge and loading manifolds and the area of their control valves and any other areas where essential control valves are situated and which should be at least equal to the area of the drip trays provided. During a test of the Deck Water Spray, less than 50% coverage was observed on the No. 1 and No. 2 tank tops and less than 10% was observed on the port side manifold. Five nozzles were missing from different locations of the deck water spray. Also, the flange at the termination of the port side manifolds water spray was loose and water was observed spraying out from the gasket of the flange. As a result, the deck water spray was not providing the required coverage area. 74SOLAS(14) VII/13.1 Ref IGC(93) 11.3.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 29 October 2019
Resolved 4 October 2019
Resolution: Satisfactory test of deck water spray completed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 September 2019 Resolved
Emergency shutdown valves in liquid piping should fully close under all service conditions within 30 s of actuation. Information about the closing time of the valves and their operating characteristics should be available on board and the closing time should be verifiable and reproducible. The emergency shutdown did not work the first time it was tested on the starboard manifold. On a subsequent test of the emergency shutdown on the starboard manifold, one valve did not shut and the other took more than two minutes to close. During the test of the port manifold ESD, one valve took over a minute to close. 74SOLAS(14) VII/13.1 Ref IGC(93) 5.6.4
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 29 October 2019
Resolved 4 October 2019
Resolution: Witnessed satisfactory test of the ESD on the starboard side manifold.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 September 2019 Resolved
The control system for emergency shutdown valves should also be provided with fusible elements between 98degC and 104degC. All fusible plugs on the cargo deck were covered in rust, which could compromise the systems ability and to activate as required by the Code. 74SOLAS(14) VII/13.1 Ref IGC 5.6.4 17bc
Action required: 17 - Rectify deficiencies prior to departure
Due 30 October 2019
Resolved 4 October 2019
Resolution: Fusible plugs were found to be satisfactory and clear of rust.
09 - Working and Living Conditions › 092 - Working Conditions › Entry dangerous spaces
Issued 28 September 2019 Resolved
Means shall be provided to close all openings which may admit air or allow gas to escape from a protected space. The door that connects the cargo control room to the cargo motor room does not properly seal. Two of the three latch bolts are not making contact with the strike plate of the door. The top latch bolt is permanently stuck in the recessed position. The cargo motor room is protected by high pressure carbon dioxide, a fixed gas extinguishing system. 74SOLAS(97)II-2/5.1.4 17bc
Action required: 17 - Rectify deficiencies prior to departure
Due 30 October 2019
Resolved 4 October 2019
Resolution: Recieved class report that door connecting the cargo control room to the cargo motor room properly seals and is found satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 September 2019 Resolved
Pressure relief valves should be set and sealed by a competent authority acceptable to the Administration [and a record of this action should be retained aboard the ship]. Relief valves on the port and starboard deck tanks were missing seals. 74SOLAS(14)VII/13.1 Ref IGC 8.2.5 17bc
Action required: 17 - Rectify deficiencies prior to departure
Due 30 October 2019
Resolved 4 October 2019
Resolution: Relief valves on the port and starboard deck tanks contained seals.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 September 2019 Resolved
The system should be capable of covering all areas mentioned in 11.3.1 with a uniformly distributed water-spray of at least 101/m2 per minute for horizontal projected surfaces and 41/m2 per minute for vertical surfaces. For structures having no clearly defined horizontal or vertical surfaces, the capacity of the water-spray system should be the greater of the following: projected horizontal surface multiplied by 101/m2 per minute; or actual surface multiplied by 41/m2 per minute. The deck water spray is configured in a spray rail around the equator of the deck tank. Review of the calculations in drawing numberFZ1-UH0001F found that the spray nozzles were designed to spray a 120degree conical spray perpendicular to the tank at the hemisphere. The actual nozzles were found redirected pointing at approximately 30 degrees off of the perpendicular upwards. At this angle some of the 60l/min flow rate of the valve sprays directly up, reducing the coverage volume. The calculations shown in drawing number FZ1-ZA0001F, and the design are in misalignment and do not appear to clearly result in uniformly covering the very top of the tank with 10l/min/m2 of projected area or 4l/min/m2 per the entire surface calculation. 74SOLAS(14)VII/13.1 Ref IGC 11.3.2 40bc
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 October 2019
Resolved 28 January 2020
Resolution: Verified installation of new nozzles. Ran deck spray system and verified adequate coverage of deck tank.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.