Records from 2008 to 2025. Most recent: inspection, 5 September 2025.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 36
5 September 2025
ACP Annual Oversight · Annual Inspection · ACP Drydock Oversight
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8228003
6 May 2025
Damage Survey · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8129884
15 April 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8112254
14 February 2025
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8079703
31 January 2025
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8072997
3 September 2024
ACP Annual Oversight · Administrative Inspection · Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7995453
27 June 2024
Administrative Inspection
Administrative · Activities Europe · Activity 7948157
20 March 2024
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7882514
14 September 2023
ACP COI Oversight · Administrative Inspection · ACP Drydock Oversight · Re-Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7786367
17 April 2023
ACP Drydock Oversight · Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7799109
18 March 2023
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7652931
17 March 2023
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7660549
28 July 2022
Annual Inspection · ACP Additional Oversight – Risk Assessment · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7546878
23 July 2021
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7268422
20 April 2021
ACP Drydock Oversight
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7178947
3 February 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7135174
17 November 2020
ACP Annual Oversight · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7095976
10 July 2019
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6744515
9 July 2019
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6743184
13 June 2019
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6711073
6 February 2019
Damage Survey · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6621178
30 May 2018
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6430233
23 May 2018
Administrative Inspection · ACP Drydock Oversight · COI Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6421213
21 July 2017
ACP Annual Oversight · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6215231
23 April 2017
Type not recorded
No type recorded · Activities Europe · Activity 6131184
5 July 2016
ACP Annual Oversight
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 5930328
27 June 2014
ACP Annual Oversight
Administrative · Activities Europe · Activity 4909305
22 May 2014
Administrative Inspection
Administrative · Activities Europe · Activity 4864914
23 May 2012
ACP Annual Oversight
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 4307585
30 August 2011
Type not recorded
No type recorded · Activities Europe · Activity 4132618
20 July 2011
Type not recorded
No type recorded · Activities Europe · Activity 4127359
22 February 2011
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3950002
29 March 2010
Annual Inspection · ACP Annual Oversight
Physical examination · Activities Europe · Activity 3706001
15 December 2008
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3504453
5 June 2008
MARPOL Annex V Examination · Initial Certification · MARPOL Annex I Examination · ACP COI Oversight · Ballast Water Examination · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 3201125
5 April 2008
Damage Survey
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 3214961
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 6 May 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel Captain reported a leak (approx. 5 gal./min.) on the high sea chest.
74 SOLAS (20 Con. Ed.)
I/11(a)
Action required: 17 - Rectify deficiencies prior to departure
Due 6 May 2025
Resolved 7 May 2025
Resolution: Accepted by RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 October 2024
Resolved
Automated vital systems must be tested in accordance with subpart 61.40 of this subchapter.
Tests must be conducted at periodic intervals specified by the Coast Guard to confirm that vital systems and safety features continue to operate in a safe, reliable manner. Normally, these tests are conducted annually.
All the listed tests were not conducted in 2023, Test were conducted during 2024 dock side.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 30 October 2024
Resolution: Conducted testing during 2024 dockside.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 23 July 2021
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. Port and starboard embarkation ladders at rope ends and deck attachments are wasted. 74 SOLAS (20) I/11(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Evaluation, testing and approval
Issued 23 July 2021
Resolved
Life-saving appliances and arrangements required by SOLAS Chapter III shall be approved by the Administration. Port and starboard self-activating smoke signals did not have a Coast Guard approval number. 74 SOLAS (20) III/4.1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 23 July 2021
Resolved
In addition to the equipment approved and carried as part of the appliance, each line throwing appliance must also have an auxiliary line readily accessible for use. The vessel was not able provide auxiliary line for inspection. 74 SOLAS (20) III/18, U.S. Supplement II-12
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Evaluation, testing and approval
Issued 23 July 2021
Resolved
Life-saving appliances and arrangements required by SOLAS Chapter III shall be approved by the Administration. Lifeboat No. 4 inventory does not have a flashlight that was constructed and marked in accordance with ASTM F1014. 74 SOLAS (20) III/4.1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 July 2021
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 23 July 2021
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. Observed multiple soft patches and pitting on the MSD ventilation piping in the MSD space. 74 SOLAS (20) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 July 2021
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 23 July 2021
Resolved
Structural fire protection, including fire-resisting divisions, and protection of openings and penetrations shall be kept in good order so as to ensure their required performance if a fire occurs. Port and starboard navigation equipment enclosures on bridge have multiple cable transits with disturbed and mixed fire stop material. 74 SOLAS (20) II-2/14.2.1.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 July 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The port and starboard bridge wing self-activating smoke signal RLB lanyards were too short. 74 SOLAS (20) III/20.2
Action required: 10 - Deficiency Rectified
Resolved 23 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 July 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The port bridge wing and starboard flight deck RLB waterlights did not function when tested. 74 SOLAS (20) III/20.2
Action required: 10 - Deficiency Rectified
Resolved 23 July 2021
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 23 July 2021
Resolved
Structural fire protection, including fire-resisting divisions, and protection of openings and penetrations shall be kept in good order so as to ensure their required performance if a fire occurs. Stairtower door 07-62-2 and JP-5 pump room fire door would not close and latch. 74 SOLAS (20) II-2/14.2.1.1.1
Action required: 10 - Deficiency Rectified
Resolved 23 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 July 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Lifeboat No. 2 had two food provisions that were bad. 74 SOLAS (20) III/20.2
Action required: 10 - Deficiency Rectified
Resolved 23 July 2021
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 23 July 2021
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. A portable PKP extinguisher iwo SSDG No.1 was missing. 74 SOLAS (20) II-2/14.2.1.2
Action required: 10 - Deficiency Rectified
Resolved 23 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 17 November 2020
Resolved
Before the ship leaves and at all times during the voyage, all lifesaving appliances shall be in working order and ready for immediate use. Vessel's number 1 lifeboat's remote control wire was bound which prevented the crew from being able to deploy the lifeboat. 74 SOLAS (14) III/20.2
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 November 2020
Resolution: Accepted by ABS as a condition of Class. 4530844
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 17 November 2020
Resolved
Every ship of 400 gross tons and above shall be subject to an annual survey of the equipment and arrangements to ensure they have been maintained and that they remain satisfactory for the service intended. Vessel's crew was not able to operate the OWS for the annual survey. MARPOL Annex I/6.1.4
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 November 2020
Resolution: Examined the oily water separator (OWS) and 15 ppm oil content monitor (OCM) and witnessed satisfactory testing.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 17 November 2020
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. The EDG's uninterrupted power supply for the control panel is inoperative. 74 SOLAS (14) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 November 2020
Resolution: Accepted by ABS as a condition of Class. 4530844
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 17 November 2020
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. The salt water cooling line for the stern tube has a temporary patch. 74 SOLAS (14) I/11 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 November 2020
Resolution: Accepted by ABS as a condition of Class. 4530844
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 17 November 2020
Resolved
maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. Four MSD vacuum lines outside of the engineering office have temporary patches. 74 SOLAS (14) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 November 2020
Resolution: Accepted by ABS as a condition of Class. 4530844
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 17 November 2020
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. Air fitting for quick close valve for number 4 main generator fuel supply failed. 74 SOLAS (14) I/11(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 November 2020
Resolution: Deficiency accepted as a condition of Class. 4530844
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 13 June 2019
Resolved
Oil Record Book had multiple incorrect and incomplete action codes used through out. Show proper entries for the next 30 days to the satisfaction of Class
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 July 2019
Resolved 10 July 2019
Resolution: ABS Surveyor reviewed ORB & confirmed proper entries were being made.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 June 2019
Resolved
Cargo and lube oil piping and associated hangers in STBD engine room ventilation space show signs of wastage. Prove wastage is within acceptable tolerances to the satisfaction of Class.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 July 2019
Resolved 10 July 2019
Resolution: Piping was descaled and found to be acceptable to ABS, but will be rechecked at next dry dock.
Documentation › Certificates/Documents › Cargo Ship Safety Equipment Certificate
Issued 30 March 2010
Resolved
Vessel's SOVC for the Cargo Ship Safety Equipment Certificate found not endorsed for the last annual survey. Further, the Certificate does not properly attest to sections 2.7 and 2.8. Certificate issuing authority requested to attest to last annual endorsement and to annotate sections 2.7 and 2.8 as appropriate prior to departure from port.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 April 2010
Resolution: Received class report attesting to the reissuance of SOVC for Safety Equipment Certificate.
Engineering › Steering Gear System › Power Unit
Issued 30 March 2010
Resolved
Vessel unable to demonstrate proper operation of steering gear electrical power supply failure audible and visual alarms on the navigational bridge. Prove proper operation in accordance with 74SOLAS(2004Cons.) II-1/29.8.4 within 7 days. 6 April 2010.
Action required: 705 - Other - as specified
Due 6 April 2010
Resolved 20 April 2010
Resolution: Received class report attesting to proper operation of audible and visiual alarms.
Communications › Alarms/Indicators › Steering Failure Alarm System
Issued 30 March 2010
Resolved
Compass deviation card found dated 20 December 2008. Provide an up-to-date compass deviation card within 7 days. 6 April 2010.
Action required: 705 - Other - as specified
Due 6 April 2010
Resolved 20 April 2010
Resolution: Received class report attesting to updated compass deviation card on board.
Construction/Loadline › Structures › Door
Issued 30 March 2010
Resolved
Self closing watertight door WTD 3-79-4, FR 79 Port, indicating as inoperative at the bridge control station. Demonstrate proper operation within 7 days. 6 April 2010.
Action required: 705 - Other - as specified
Due 6 April 2010
Resolved 20 April 2010
Resolution: Received class report attesting to proper operation of self closing watertight door (3-79-4).
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 30 March 2010
Resolved
Vessel unable to demonstrate proper operation of slop tank overfill alarm at the control station. Prove proper operation of slop tank overfill alarm as required by 46CFR39.20-7 within 7 days. 6 April 2010.
Action required: 705 - Other - as specified
Due 6 April 2010
Resolved 20 April 2010
Resolution: Received class report attesting to proper operation of slop tank overfill alarm.
Fire Fighting › Structural - A Class Divisions › Cargo Pump Rooms
Issued 30 March 2010
Resolved
Insulation forming part of the A-60 fire boundary between the cargo pump room and the forward emergency fire pump space found removed. Provide approved insulation in order to reinstate A-60 boundary within 7 days. 6 April 2010.**Extended to 1 May 2010**
Action required: 705 - Other - as specified
Due 1 May 2010
Resolved 20 April 2010
Resolution: Received class report attesting to proper A-60 insulation being replaced.
Lifesaving › Launching Appliances › Padeye
Issued 30 March 2010
Resolved
The sheave for the #3 lifeboat (stbd. aft) remote lowering wire found frozen. Make proper repairs and prove proper operation within 7 days. 6 April 2010.
Action required: 705 - Other - as specified
Due 6 April 2010
Resolved 20 April 2010
Resolution: Received class report attesting to prover operation of sheave.
Deck/Cargo › Holds/Tanks › Portable Gas Measuring Equipment
Issued 30 March 2010
Resolved
The onboard portable instruments for measuring flammable vapor concentrations, as required by 74SOLAS(2004Cons.) II-2/4.5.7.1, found overdue for calibration. The manufacturer recommends calibration at 6 month intervals. Provide updated calibration for these instruments within 7 days. 6 April 2010.**Extended to 1 May 2010**
Action required: 705 - Other - as specified
Due 1 May 2010
Resolved 20 April 2010
Resolution: Received class report attesting to proper calibration of portable instruments.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 30 March 2010
Resolved
*Item reported cleared via E-mail dated 29APR10 & shall remain open until verified by CG MI* Provide the port/stbd. vapor connection flanges w/ perm. attached 0.5 in. diam studs at least 1.0 in. long projecting outward from the flange face. The studs must be located at the top of the flange, midway between bolt holes, & in line w/ the bolt hole pattern iaw 46CFR39.20-1(3) within 30days.29April2010
Action required: 705 - Other - as specified
Due 4 September 2011
Resolved 27 August 2010
Resolution: Received ABS class report noting item as clear.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 30 March 2010
Resolved
*Item reported cleared via E-mail dated 29APR10 and shall remain open until verified to be corrected by attending USCG Marine Inspector*Provide launching instructions in the vicinity of the #2 life boat (port side) which can be easily seen under emergency lighting conditions as required by 74SOLAS(2004Cons.) III/9.2.2 within 30 days. 29 April 2010.
Action required: 705 - Other - as specified
Due 4 September 2011
Resolved 27 August 2010
Resolution: Received ABS class report noting item as clear.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 30 March 2010
Resolved
Emergency (overboard) lighting required by 74SOLAS(2004Cons.) III/11.4 between lifeboats #2 and #4 (in way of the embarkation ladder) found inoperative. Make proper repairs to restore operational readiness within 30 days. 29 April 2010.
Action required: 705 - Other - as specified
Due 29 April 2010
Resolved 20 April 2010
Resolution: Received class report attesting to proper operation of emergency lighting between lifeboats #2 and #4.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 30 March 2010
Resolved
The port side (aft) life-raft muster and embarkation station (rafts #10, 12, 14, and 16) is inadequately illuminated. Provide adequate emergency lighting as required by 74SOLAS(2004Cons.) III/11.4 within 30 days. 29 April 2010.**Extended to 15FEB2011**
Action required: 705 - Other - as specified
Due 15 February 2011
Resolved 22 February 2011
Resolution: Verified adequate emergency lighting for muster and embarkation stations for PS #10,#12,#14, & #16.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 30 March 2010
Resolved
Multiple locations for the stowage of liferafts have been altered from their original locations. Specifically; port side #6 - #8 and stbd. side #5 - #7. Provide adequate e-lighting as required by 74SOLAS(2004Cons.) III/11.4 and operating instructions easily seen under e-lighting conditions as required by III/9.2 for the new stowage locations within 30 days. 29 April 2010.**Extended to 15FEB2011**
Action required: 705 - Other - as specified
Due 15 February 2011
Resolved 22 February 2011
Resolution: Verified adequate emergency lighting for stowage locations & operating instructions for PS #6,#8, & SBD #5, #7.
Lifesaving › Embarkation Appliances/Stations › Designated Location
Issued 30 March 2010
Resolved
The storage locations for life-rafts port side #2, #4 and stbd. side #1, #3 found without adequate emergency lighting as required by 74SOLAS(2004Cons.) III/11.4. Provide adequate emergency lighting for embarkation station as well as for operating instructions as required by III/9.2 within 30 days. 29 April 2010.**Extended to 15FEB2011**
Action required: 705 - Other - as specified
Due 15 February 2011
Resolved 22 February 2011
Resolution: Verified adequate emergency lighting for embarkation station and operating instructions for life rafts PS #2,#4, & SBD #1,#3.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 30 March 2010
Resolved
*Item reported cleared via E-mail dated 30MAY10 & shall remain open until verified by CG MI*Update ABS approved fire control plan and lifesaving plan to reflect the new stowage locations of life-rafts port side #6, #8 and stbd. side #5, #7 within 30 days. 29 April 2010.**Extended to May 29, 2010**
Action required: 705 - Other - as specified
Due 31 August 2010
Resolved 27 August 2010
Resolution: Received ABS class report noting item as clear.
Fire Fighting › Fire Pumps › Arrangement
Issued 30 March 2010
Resolved
Indicating lights ('Running') for the bridge emergency fire pump control panel found inoperative. Demonstrate proper operation within 30 days. 29 April 2010.
Action required: 705 - Other - as specified
Due 29 April 2010
Resolved 20 April 2010
Resolution: Received class report attesting to proper operation of emergency fire pump bridge control panel indication lighting.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom
Issued 30 March 2010
Resolved
*Item reported cleared via E-mail dated 30MAY10 & shall remain open until verified by CG MI*Provide adequate emergency escape breathing devices (EEBDs) for the cargo pump room (electrical machinery) and update the fire control plan to indicate the number and location of these devices in accordance with 74SOLAS(2004Cons.) II-2/13.4.3 within 30 days. 29 April 2010.**Extended to May 29, 2010**
Action required: 705 - Other - as specified
Due 31 August 2010
Resolved 27 August 2010
Resolution: Received ABS class report noting item as clear.
Electrical › Electric Supply System (service) › Cable
Issued 30 March 2010
Resolved
Install appropriate wire holding bands in the place of wire ties in the Pump Room and Engineering Work Shop according to ABS rules and IEC within 30 days 29 April 2010.
Action required: 705 - Other - as specified
Due 29 April 2010
Resolved 20 April 2010
Resolution: Received class report attesting to appropriate wire holding bands in place of wire ties in the pump room and engineering work shop.
Electrical › Electric Supply System (service) › Cable
Issued 30 March 2010
Resolved
Remove temporary cable to the local (red lion) automation panel at the aft fire pump 30 days 29 April 2010.
Action required: 705 - Other - as specified
Due 29 April 2010
Resolved 20 April 2010
Resolution: Received class report attesting to the removal of temporary cable to the (red lion) automation panel and replacement with permanent cable.
Electrical › Electric Supply System (service) › Cable
Issued 30 March 2010
Resolved
Remove all temporary cords for permanently mounted equipment in engineering spaces and install permanent cables IAW ABS rules and IEC requirements 30 days 29 April 2010.
Action required: 705 - Other - as specified
Due 29 April 2010
Resolved 20 April 2010
Resolution: Received class report attesting to the removal of all temporary cables and cords for permanently mounted equipment in engineering spaces.and replacement with permanent cables.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 30 March 2010
Resolved
Prove operation of cargo system OWS within 30 days 29 April 2010. Until such time as system is proven, offload cargo bilge water to approved collection facilities ashore.**Extended to June 29, 2010**Extended to July 31, 2010**Extended to August 31, 2010**
Action required: 705 - Other - as specified
Due 31 August 2010
Resolved 27 August 2010
Resolution: Received ABS class report noting item as clear.
Documentation › Logs/Records › Record Book of Engine Parameters
Issued 30 March 2010
Resolved
*Item reported cleared via E-mail dated 30MAY10 & shall remain open until verified by CG MI*Provide a Record Book of Engine Parameters to record the engine adjustments, parameter changes, as well as component changes & settings which could influence NOx emissions. The Record Book can be placed within the NOx TechnicaTechnical File IAW the NOx Technical Code and MARPOL Annex VI Reg 13.
Action required: 705 - Other - as specified
Due 31 August 2010
Resolved 27 August 2010
Resolution: Received ABS class report noting item as clear.
Engineering › Pressure Vessel › Relief Valve
Issued 30 March 2010
Resolved
*Item reported cleared via E-mail dated 31JUL10 & shall remain open until verified by CG MI*Service pressure relief valves of the start air system receivers and prove operation of same due to failure during spot check within 60 days 29 May 2010.**Extended to July 31, 2010**
Action required: 705 - Other - as specified
Due 31 August 2010
Resolved 27 August 2010
Resolution: Received ABS class report noting item as clear.
Lifesaving › Rescue Boat Equipment › Searchlight
Issued 30 March 2010
Resolved
*Item reported cleared via E-mail dated 31JUL10 & shall remain open until verified by CG MI*The search light for rescue boat #1, stbd., was found inoperative. Make repairs or replace in order to prove proper operation within 60 days. 29 May 2010.**Extended to July 31, 2010**
Action required: 705 - Other - as specified
Due 31 August 2010
Resolved 27 August 2010
Resolution: Received ABS class report noting item as clear.
Lifesaving › Rescue Boat Equipment › First Aid Kit
Issued 30 March 2010
Resolved
Provide a USCG Approved first aid kit for the stbd. side, #1, rescue boat within 60 days. 29 May 2010.
Action required: 705 - Other - as specified
Due 29 May 2010
Resolved 20 April 2010
Resolution: Received class report attesting to USCG Approved first aid kit for #1 rescue boat.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 30 March 2010
Resolved
*Item reported cleared via E-mail dated 30MAY10 & shall remain open until verified by CG MI*Provide updated ABS classification document which reflects the deletion of the notation for the carriage of dangerous chemical cargoes in bulk within 60 days. 29 May 2010.
Action required: 705 - Other - as specified
Due 31 August 2011
Resolved 22 February 2011
Resolution: Verified updated class document - no carriage of dangerous chemical cargoes in bulk.
Documentation › Certificates/Documents › Cargo Ship Safety Construction Certificate
Issued 30 March 2010
Resolved
SOVCs for Cargo Safety Equipment and Cargo Safety Construction Certificates to be endorsed by the ACP ACS for annual credit by the end of the survey window. 4 Sept. 2010.
Action required: 705 - Other - as specified
Due 4 September 2010
Resolved 27 August 2010
Resolution: Received ABS class report noting item as clear. Construction endorsed on 8-26-2010. Equipment endorsed on 8-27-2010.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 30 March 2010
Resolved
Prove, during class attendance for completion of the Annual, the full automation test procedure for the vessel as no shutdowns were conducted during class attendance in Dubai. Computer inputs are necessary for testing actual parameters. To be completed prior to closure of class annual attendance. **Extended to 30OCT2010**
Action required: 705 - Other - as specified
Due 30 October 2010
Resolved 16 October 2010
Resolution: Received ABS report showing that the annual automation verification has been completed and credited.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 30 March 2010
Resolved
Conduct review of SOPEP within one (1) month of the anniversary date of approval, 13 August as required by the approval letter. The 2008 review took place in April and the 2009 review took place in April. To be completed between 13 July and 13 August 2010.
Action required: 705 - Other - as specified
Due 13 August 2010
Resolved 4 June 2010
Resolution: Received copy of MSC submittal for VRP/SOPEP annual review to USCG.
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 5 June 2008
Resolved
Provide original licenses, STCW, MMD, and proficiency certificates for a minimum of the crew specified on Certificate of Inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2008
Resolution: Verified minimum safe manning iaw crew list and COI.
Operations/Management › Drills/Instruction › Not Conducted
Issued 5 June 2008
Resolved
Conduct fire, boat, and familiarization drills with full crew compliment
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 July 2008
Resolution: SAT
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 5 June 2008
Resolved
Complete ISM/SMS Audit to finalize ACP Enrollement.
Action required: 705 - Other - as specified
Resolved 25 July 2008
Resolution: Audit complete 24JUL08