Records from 2016 to 2025. Most recent: inspection, 5 September 2025.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 26
5 September 2025
ACP Annual Oversight · Annual Inspection · ACP Drydock Oversight
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8228003
6 May 2025
Damage Survey · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8129884
15 April 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8112254
14 February 2025
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8079703
31 January 2025
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8072997
3 September 2024
ACP Annual Oversight · Administrative Inspection · Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7995453
27 June 2024
Administrative Inspection
Administrative · Activities Europe · Activity 7948157
20 March 2024
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7882514
14 September 2023
ACP COI Oversight · Administrative Inspection · ACP Drydock Oversight · Re-Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7786367
17 April 2023
ACP Drydock Oversight · Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7799109
18 March 2023
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7652931
17 March 2023
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7660549
28 July 2022
Annual Inspection · ACP Additional Oversight – Risk Assessment · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7546878
23 July 2021
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7268422
20 April 2021
ACP Drydock Oversight
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7178947
3 February 2021
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7135174
17 November 2020
ACP Annual Oversight · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7095976
10 July 2019
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6744515
9 July 2019
Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6743184
13 June 2019
Annual Inspection · ACP Annual Oversight
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6711073
6 February 2019
Damage Survey · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6621178
30 May 2018
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6430233
23 May 2018
Administrative Inspection · ACP Drydock Oversight · COI Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6421213
21 July 2017
ACP Annual Oversight · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6215231
23 April 2017
Type not recorded
No type recorded · Activities Europe · Activity 6131184
5 July 2016
ACP Annual Oversight
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 5930328
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 6 May 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel Captain reported a leak (approx. 5 gal./min.) on the high sea chest.
74 SOLAS (20 Con. Ed.)
I/11(a)
Action required: 17 - Rectify deficiencies prior to departure
Due 6 May 2025
Resolved 7 May 2025
Resolution: Accepted by RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 October 2024
Resolved
Automated vital systems must be tested in accordance with subpart 61.40 of this subchapter.
Tests must be conducted at periodic intervals specified by the Coast Guard to confirm that vital systems and safety features continue to operate in a safe, reliable manner. Normally, these tests are conducted annually.
All the listed tests were not conducted in 2023, Test were conducted during 2024 dock side.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 30 October 2024
Resolution: Conducted testing during 2024 dockside.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 23 July 2021
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. Port and starboard embarkation ladders at rope ends and deck attachments are wasted. 74 SOLAS (20) I/11(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Evaluation, testing and approval
Issued 23 July 2021
Resolved
Life-saving appliances and arrangements required by SOLAS Chapter III shall be approved by the Administration. Port and starboard self-activating smoke signals did not have a Coast Guard approval number. 74 SOLAS (20) III/4.1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 23 July 2021
Resolved
In addition to the equipment approved and carried as part of the appliance, each line throwing appliance must also have an auxiliary line readily accessible for use. The vessel was not able provide auxiliary line for inspection. 74 SOLAS (20) III/18, U.S. Supplement II-12
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Evaluation, testing and approval
Issued 23 July 2021
Resolved
Life-saving appliances and arrangements required by SOLAS Chapter III shall be approved by the Administration. Lifeboat No. 4 inventory does not have a flashlight that was constructed and marked in accordance with ASTM F1014. 74 SOLAS (20) III/4.1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 July 2021
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 23 July 2021
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. Observed multiple soft patches and pitting on the MSD ventilation piping in the MSD space. 74 SOLAS (20) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 July 2021
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 23 July 2021
Resolved
Structural fire protection, including fire-resisting divisions, and protection of openings and penetrations shall be kept in good order so as to ensure their required performance if a fire occurs. Port and starboard navigation equipment enclosures on bridge have multiple cable transits with disturbed and mixed fire stop material. 74 SOLAS (20) II-2/14.2.1.1.1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 July 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The port and starboard bridge wing self-activating smoke signal RLB lanyards were too short. 74 SOLAS (20) III/20.2
Action required: 10 - Deficiency Rectified
Resolved 23 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 July 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The port bridge wing and starboard flight deck RLB waterlights did not function when tested. 74 SOLAS (20) III/20.2
Action required: 10 - Deficiency Rectified
Resolved 23 July 2021
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 23 July 2021
Resolved
Structural fire protection, including fire-resisting divisions, and protection of openings and penetrations shall be kept in good order so as to ensure their required performance if a fire occurs. Stairtower door 07-62-2 and JP-5 pump room fire door would not close and latch. 74 SOLAS (20) II-2/14.2.1.1.1
Action required: 10 - Deficiency Rectified
Resolved 23 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 23 July 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Lifeboat No. 2 had two food provisions that were bad. 74 SOLAS (20) III/20.2
Action required: 10 - Deficiency Rectified
Resolved 23 July 2021
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 23 July 2021
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. A portable PKP extinguisher iwo SSDG No.1 was missing. 74 SOLAS (20) II-2/14.2.1.2
Action required: 10 - Deficiency Rectified
Resolved 23 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 17 November 2020
Resolved
Before the ship leaves and at all times during the voyage, all lifesaving appliances shall be in working order and ready for immediate use. Vessel's number 1 lifeboat's remote control wire was bound which prevented the crew from being able to deploy the lifeboat. 74 SOLAS (14) III/20.2
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 November 2020
Resolution: Accepted by ABS as a condition of Class. 4530844
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 17 November 2020
Resolved
Every ship of 400 gross tons and above shall be subject to an annual survey of the equipment and arrangements to ensure they have been maintained and that they remain satisfactory for the service intended. Vessel's crew was not able to operate the OWS for the annual survey. MARPOL Annex I/6.1.4
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 November 2020
Resolution: Examined the oily water separator (OWS) and 15 ppm oil content monitor (OCM) and witnessed satisfactory testing.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 17 November 2020
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. The EDG's uninterrupted power supply for the control panel is inoperative. 74 SOLAS (14) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 November 2020
Resolution: Accepted by ABS as a condition of Class. 4530844
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 17 November 2020
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. The salt water cooling line for the stern tube has a temporary patch. 74 SOLAS (14) I/11 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 November 2020
Resolution: Accepted by ABS as a condition of Class. 4530844
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 17 November 2020
Resolved
maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. Four MSD vacuum lines outside of the engineering office have temporary patches. 74 SOLAS (14) I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 November 2020
Resolution: Accepted by ABS as a condition of Class. 4530844
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 17 November 2020
Resolved
The condition of the ship and its equipment shall be maintained to ensure the ship will remain fit to proceed to sea without danger to the ship or persons aboard. Air fitting for quick close valve for number 4 main generator fuel supply failed. 74 SOLAS (14) I/11(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 November 2020
Resolution: Deficiency accepted as a condition of Class. 4530844
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 13 June 2019
Resolved
Oil Record Book had multiple incorrect and incomplete action codes used through out. Show proper entries for the next 30 days to the satisfaction of Class
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 July 2019
Resolved 10 July 2019
Resolution: ABS Surveyor reviewed ORB & confirmed proper entries were being made.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 June 2019
Resolved
Cargo and lube oil piping and associated hangers in STBD engine room ventilation space show signs of wastage. Prove wastage is within acceptable tolerances to the satisfaction of Class.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 July 2019
Resolved 10 July 2019
Resolution: Piping was descaled and found to be acceptable to ABS, but will be rechecked at next dry dock.