Records from 2018 to 2025. Most recent: inspection, 4 November 2025.
Inspection history · 4
4 November 2025
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8264022
6 October 2025
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8247031
16 September 2025
PSC B · COC-TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8229394
3 October 2018
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6548423
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 16 September 2025
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed starboard side lifboat was not capable of starting.
74SOLAS(cons.) III/20.2 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 September 2025
Resolution: Received class report attesting to operation of life boat engine.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 16 September 2025
Resolved
The following tests and inspections shall be carried out weekly and report of the inspection shall be entered in the logbook: all engines in lifeboats and rescue boats shall be run for a total period of not less than 3 minutes. It was reported to the PSCO that engines were not started on the last weekly check.
74SOLAS(cons.)III/20.6 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 October 2025
Resolution: Received internal audit stating training on lifeboats inspections and recording was completed.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 16 September 2025
Resolved
The company and the ship shall comply with the requirements of the International Safety Management Code. The Company should establish procedures, plans and instructions, including checklists as appropriate for key shipboard operations concerning the safety of the personnel, ship and protection of the environment. When reviewing records it was observed that the company provided from for documenting LSA weekly inspections (MTN02813) has not been used since August 2025.
Additionally, it was recorded in ORB pt II that a simulation test was conducted on 16AUG2025 for the ODME; it was later observed that no test was actually completed IAW company procedures. Request that an internal audit be conducted within 90 days.
74SOLAS(cons.)IX/3.1 ISM Code 7 abc
Action required: 705 - Other - as specified
Due 15 December 2025
Resolved 6 October 2025
Resolution: Received internal audit report accepted by flag and class.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 16 September 2025
Resolved
Each cargo tank of a tankship must be equipped with an intrinsically safe high-level alarm and a tank overfill alarm. The tank overfill alarm must activate a visible and audible alarm so that it can be seen and heard on the vessel where cargo transfer is controlled. PSCO observed overfill alarm on COT(6 port) is inoperable. Prior to loading COT 6 port, vessel must submit risk assessment satisfactory to COTP. 46CFR39.2007(d)(3) 40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 October 2025
Resolution: The spare sensor for No.6 C.O.T.(P) overfill alarm was received, installed, tested, and found
to be fully functioning.