750-3

Built
2013
Last inspected
8 June 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.

Inspection record

Last inspected 8 June 2026
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 14 calendar years (2013–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

1001103
Flag
UNITED STATES
Tonnage
48041 - Dead Weight, Ton 25239 - Convention (Subpart B), Gross Ton 22515 - Regulatory (Subpart C or D), Gross Ton 16186 - Convention (Subpart B), Net Ton 22515 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-1001103
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 27

8 June 2026 Annual Inspection · MARPOL Annex II Examination · MARPOL Annex I Examination · MTSA/ISPS Verification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8394742
21 May 2026 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8397626
18 February 2026 Bulk Liquid Transfer Monitor
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8312125
28 April 2025 COI Inspection · MARPOL Annex II Examination · Examination of Repairs · MARPOL Annex VI Survey · MARPOL Annex I Examination · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8123278
6 November 2024 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8031207
27 August 2024 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7990175
17 June 2024 MTSA Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7936997
15 February 2024 Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7866302
21 April 2023 MARPOL Annex I Examination · MARPOL Annex VI Survey · MTSA Verification · MARPOL Annex II Examination · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7673212
12 April 2022 Internal Structural Exam · Administrative Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey · Annual Inspection · MARPOL Annex II Examination · Drydock Exam · MTSA Verification · Cargo Tank Internal
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7429844
23 June 2021 MTSA Verification · MARPOL Annex VI Survey · VRP Review · MARPOL Annex II Examination · MARPOL Annex I Examination · Periodic Inspection · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7232829
19 June 2020 Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6981150
20 September 2019 Deficiency Check · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6811300
6 May 2019 MARPOL Annex I Examination · MARPOL Annex VI Survey · MTSA Verification · MARPOL Annex II Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6674673
12 April 2018 COI Inspection · MARPOL Annex VI Survey · MTSA Verification · MARPOL Annex I Examination · MARPOL Annex II Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6385714
17 July 2017 MARPOL Annex II Examination · Annual Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6208631
24 May 2017 Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6142081
3 November 2016 In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6032601
12 October 2016 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6020960
2 August 2016 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5960836
29 July 2016 MARPOL Annex VI Survey · MARPOL Annex I Examination · MTSA/ISPS Verification · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5957121
17 March 2016 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5835066
5 May 2015 MTSA Verification · MARPOL Annex I Examination · MARPOL Annex VI Survey · Internal Structural Exam · Deficiency Check · Periodic Inspection · Administrative Inspection · MARPOL Annex II Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5118273
5 January 2015 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5048026
31 July 2014 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4939561
22 July 2014 MARPOL Annex I Examination · MTSA/ISPS Verification · MARPOL Annex VI Survey · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4926334
29 October 2013 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4743334

Deficiency record · 20

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 June 2025 Resolved
46 CFR 111.105-31 (m) Locations in the weather are Class I, Division 1 (Zone 1) locations may have only approved intrinsically safe, explosion proof, or purged and pressurized electrical equipment, and through runs of marine shipboard cable. MI observed multiple cable glands on electrical equipment in the hazardous zone that had failed which compromises intrinsically safe, explosion proof capabilities. Identified locations are small gland on vacuum tank, temps sensors on P/S slop tanks, 7 P/S ballast sensors, 7 P/S cargo gauge point and temp indicators, 6 P/S cargo level indicators, and 5 Port cargo temp. Cable gland shall be repaired to the satisfaction of USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2025
Resolution: All cable glands were replaced. All sat.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 June 2025 Resolved
46 CFR 162.017-4 Pressure-vacuum relief valves may be inspected and tested at the plant of the manufacturer. An inspector may conduct such tests and examinations as may be necessary to determine compliance with this specification. Vessel was unable to provide proof of testing during last dry dock. Vessel shall provide proof of P/V valve testing.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2025
Resolution: Received proof of testing during 2022 drydock.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 June 2025 Resolved
46 CFR 35.35-70 (c) Cargo pump pressure gage shall be tested at least once a year for accuracy. MI observed that it has been over a year since gages have been tested. Vessel shall test gages and provide proof to USCG Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2025
Resolution: Crew tested all gages and provided results.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 June 2025 Resolved
46 CFR 35.35-70 (b) Cargo pump relief valves shall be tested at least once each year to determine that they function satisfactorily at the pressure at which they are set to open. MI observed that it has been over a year since cargo pump relief valves have been tested. Vessel shall test relief valves and provide proof to USCG Marine Inspector. CODE 705: Vessel provided an approved procedure, and risk assessment for testing cargo pump relief valves with cargo. Vessel requested to be allowed to load cargo and complete testing before discharge. Request is approved. Vessel shall provide proof of testing before discharge.
Action required: 705 - Other - as specified
Resolved 13 June 2025
Resolution: Received proof of cargo pump relief valve test. Vessel is cleared to discharge cargo.
14 - Pollution Prevention › 142 - MARPOL Annex II › Other (MARPOL Annex II)
Issued 4 June 2025 Resolved
33 CFR 155.310 (b) (3) A mechanical means of closing each drain and scupper within the coaming. Identified that all scupper plugs were missing within the spill containment both port and stbd side. Install plugs before cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 June 2025
Resolution: Scupper plugs were installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 4 June 2025 Resolved
46 CFR 31.10-15(b) The inspection shall be such as to insure that the vessel, as regards the structure, and other equipment is in satisfactory condition and fit for the service for which it is intended. MI observed that PCO room, both thermal oil room, #1 port ballast, and #2 port ballast watertight doors were not sealing, and daylight was observed between knife edge and gasket when doors were dogged shut. Enact repairs to the satisfaction of USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 6 June 2025
Resolution: All doors were adjusted and tested. All sat.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 4 June 2025 Resolved
46 CFR 31.10-15(b) The inspection shall be such as to insure that the vessel, as regards the structure, and other equipment is in satisfactory condition and fit for the service for which it is intended. MI observed that grating by #1 port forward ballast tank hatch was not properly secured. Vessel shall secure grating.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 6 June 2025
Resolution: Grating was secured.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 4 June 2025 Resolved
46 CFR 111.01(a)(2) Electrical installations on vessels must ensure protection of vessel from electrical hazards. MI observed three areas where wiring conduit corroded which will start chaffing wires. Located stbd side bow main deck behind life raft, and the three light fixtures port and stbd side above manifolds. Repair to the satisfaction of USCG Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 6 June 2025
Resolution: Conduit was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 June 2025 Resolved
46 CFR 58.10-5 (a) Engine design. All installations must be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. MI was informed that stbd generator fuel pump failed and that metal shaving were sent through oil lubrication system. Vessel submitted risk mitigation plan attesting to being able to safely conducted cargo operations at 40% capacity on one generator. CODE 705: Vessel approved to conduct cargo operations at 40% capacity until stbd generator is repaired.
Action required: 705 - Other - as specified
Resolved 9 September 2025
Resolution: Received class report attesting to satisfactory installation, operational test, and testing of alarms. All sat. Uploaded report to deficiency documents.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 23 May 2025 Resolved
46 CFR 31.10-15 The inspection shall be such as to insure that the vessel, as regards the piping, main and auxiliary machinery, and other equipment is in satisfactory condition and fit for the service for which it is intended. MI identified a fuel leak on port generator fuel supply line.
Action required: 10 - Deficiency Rectified
Resolved 23 May 2025
Resolution: Union was tightened.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 28 April 2025 Resolved
46 CFR 34.15-10 (h) Complete but simple instructions for the operation of the systems must be located in a conspicuous place at or near all pull boxes. MI observed missing label on one of the therm oil heater CO2 activation handles outside the space. Replaced label.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2025
Resolved 6 June 2025
Resolution: Label was replaced.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 28 April 2025 Resolved
46 CFR 34.10-5 (e) Fire pumps shall be fitted with a pressure gage on the discharge side of the pumps. MI observed that stbd fire pump didn't have a gage. Gage was installed.
Action required: 10 - Deficiency Rectified
Resolved 4 June 2025
Resolution: Gage was installed and tested.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 17 June 2024 Resolved
The support for all cables should be such to prevent undue sag, but in no case should exceed the distance between frames or 610mm (24in), whichever is less. The cable supports over the cargo deck are wasted. Make temporary repairs to areas of the cable run over the cargo deck that are wasted greater than 24" within 14 days. 46 CFR 31.35 46 CFR 110.10-1(j)(5) IEEE Std. 45-1998 10.5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2024
Resolved 1 July 2024
Resolution: Received satisfactory objective evidence of repair.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 February 2024 Resolved
No extensive repairs or alterations, except in emergency, shall be made to any fire-extinguishing apparatus, or other appliance subject to inspection, without advance notice to the Officer in Charge, Marine Inspection. Such repairs or alterations shall so far as is practicable be made with materials and tested in the manner specified within the regulations in this subchapter and subchapter Q (Specifications) of this chapter for new construction. Section of CO2 system piping was unintentionally charged, vessel shall have technician make sufficient repairs and provide report to OCMI. 46 CFR 35.01-35(a)
Action required: 17 - Rectify deficiencies prior to departure
Due 15 February 2024
Resolved 17 February 2024
Resolution: System was repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 April 2023 Resolved
Boilers, main and auxiliary machinery, and piping systems shall conform to the requirements of subchapter F (Marine Engineering). Port generator room was missing the battery disconnect switch. 46CFR32.35-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 26 April 2023
Resolution: Added switch
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 April 2023 Resolved
Boilers, main and auxiliary machinery, and piping systems shall conform to the requirements of subchapter F (Marine Engineering). The control for the room heater in the thermal heater room was broken. 46CFR32.35-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 26 April 2023
Resolution: Made new bracket and mounted disconnect switch box.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 April 2023 Resolved
The installation of all electrical engineering or interior communications systems, together with the details of design, construction, and installation, must meet the requirements of subchapter J (Electrical Engineering Regulations). Room heater cables located in inert gas room were out of the junction box. 46CFR32.45-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 26 April 2023
Resolution: Tightened wire grip.
Engineering › Pressure Vessel › Relief Valve
Issued 17 July 2017 Resolved
Provide proof of testing for air receiver relief valves (02).
Due 17 August 2017
Resolved 1 August 2017
Resolution: Received documentation attesting to new install of relief valves.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 15 May 2015 Resolved
Each transfer pipe system must not leak under static liquid pressure at least 1 1/2 times the maximum allowable working pressure. The last test of the vessel's cargo piping system was over a year ago. The vessel must conduct an annual hydro-static test of its cargo piping.
Action required: 705 - Other - as specified
Due 15 June 2015
Resolved 22 May 2015
Resolution: Vessel provided documentation, via e-mail, that it conducted annual hydro-static testing of it cargo piping on 22MAY2015.
Fire Fighting › Fixed Deck Foam System › Foam Applicators
Issued 15 May 2015 Resolved
Deck foam systems shall have a sample of the foam liquid submitted for analysis. Vessel did submit a sample, but did not have a report to provide. Vessel is to provide an analysis report when made available.
Action required: 705 - Other - as specified
Due 15 June 2015
Resolved 22 May 2015
Resolution: Vessel provided foam analysis documentation, via e-mail, of satisfactory testing/analysis conducted by FPS New Orleans.

Source. US Coast Guard records through 23 August 2026, retrieved 5 September 2026. Vessels the Coast Guard classes as Barge or Towing Vessel. Coverage and known gaps.

Maury does not score, rate, or grade vessels. What Maury does not do · Glossary · Correct a record.