Records from 2016 to 2026. Most recent: inspection, 15 January 2026.
Inspection history · 11
15 January 2026
PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8292296
25 September 2024
PSC B
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8005759
6 March 2024
PSC B
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7874690
25 July 2022
PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7515820
15 October 2020
Administrative Inspection · PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7077676
5 April 2019
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6656703
14 March 2019
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6642689
13 March 2019
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6641757
6 October 2017
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6281470
26 August 2016
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 5984086
18 July 2016
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5934417
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 October 2020
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards will be ensured. PSCO observed unapproved electrical installations of 440v AC outlet to emergency fire pump electrical panel. Multiple installations of unapproved lighting installed in engine room, CO2 room, and Bosun Stores due to poor original lighting conditions in those spaces. 74 SOLAS (04) II-1/40.1.3 50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 November 2020
Resolution: Unapproved electrical installations were removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 15 October 2020
Resolved
Means shall be provided to control leaks to control leaks of flammable liquids. PSCO observed fuel supply line to main engine to be soaked with fuel to include high pressure relief valves. 74 SOLAS (09) II-2/4.1.1 50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 November 2020
Resolution: items were overhauled, cleaned and new lagging was installed.
01 - Certificates & Documentation › 012 - Crew Certificates › Manning specified by the minimum safe manning doc
Issued 13 March 2019
Resolved
Administration may allow a seafarer to serve for a period not exceeding 3 months on board a ship entitled to fly its flag, while holding an appropriate and valid certificate issued and endorsed as required by another Party for use on board that Party's ships but which has not yet been endorsed so as to render it appropriate for service on board ships entitled to fly the flag of the Administration. Chief Engineer does not have a flag state endorsement for his certificate of competency or any documentary proof of an application for an endorsement.
STCW I/10.5
Action required: 15 - Rectify deficiencies by next port
Resolved 14 March 2019
Resolution: Received e-mail with scanned Chief Engineer credentials from vessel master for deficiency issued from Activity #6641757, deficiency has been rectified.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 13 March 2019
Resolved
Each incinerator subject to this paragraph shall be approved by the Administration taking into account the standard specification for shipboard incinerators developed by the Organization. PSCO observed top corners of frame cracked and door did not close properly.
MARPOL VI/16.6.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 5 April 2019
Resolution: Recieved Class NKK report from vessel's agent attesting to the repair of the incinerator, including gouging and welding of cracks by a certified welder and confirmation of a proper door closing condition. Deficiency issued under MISLE Activity #6641757.