Records from 2016 to 2026. Most recent: inspection, 26 May 2026.
Documentation record
Registered dimensions (L × B × D)34.0 ft × 11.0 ft × 4.5 ft
Registered tonnagegross 11 / net 11
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBENTZ BOATS LLC · LEWISTON, ID, UNITED STATES · built 2009
Hull materialAluminum
PropulsionGasoline Outboard
Hull shapeShip
Hull configurationMonohull
Hailing portMOOSE, WY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 12 May 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it11 - Simplified, Gross Ton
11 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 13
26 May 2026
Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8319426
27 May 2025
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 8106644
29 May 2024
Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7922786
9 May 2023
Administrative Inspection · COI Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7684288
1 June 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7412286
2 June 2021
Deficiency Check · DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7175782
8 October 2020
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 7073872
7 July 2020
Annual Inspection · Administrative Inspection
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6999914
4 June 2019
Administrative Inspection · DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6690445
8 June 2018
COI Inspection · Internal Structural Exam · Administrative Inspection · DAPI Audit · Deficiency Check · Hull Examination · MARPOL Annex VI Survey
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6429962
7 July 2017
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6206440
7 June 2017
Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 6142859
16 May 2016
DAPI Audit · Special · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Peoria · USCG Heartland District (CGD-H) · Activity 5878611
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 May 2024
Resolved
46CFR182.460(a)((1)ii)
An enclosed space containing fuel tanks for gasoline
must have a ventilation system consisting of a
mechanical exhaust system with at least two ventilation
exhaust ducts located at the end of the space opposite
from where the supply ducts are fitted, which extend to
the lowest part of the bilge of the space on each side
of the space, and which are led to one or more exhaust
blowers. Noted that vessel only had one exhaust duct
connected to the mechanical exhaust system. Rectify
within 30 days.
Action required: 705 - Other - as specified
Due 29 June 2024
Resolved 25 June 2024
Resolution: received evidence that supply ducts were properly installed.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 29 May 2024
Resolved
46CFR182.700
Materials used in piping systems must be acceptable to
the cognizant OCMI. Noted that elbow for stbd fuel
shutoff/piping was loose and needs tightened/shoring up.
Repair within 30 days.
Action required: 705 - Other - as specified
Due 29 June 2024
Resolved 25 June 2024
Resolution: operator tightened elbor for stbd fuel shutoff line
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 May 2024
Resolved
46CFR182.460(e)
Exhaust blower switches must be of the type interlocked
with starting switch and the ignition switch so that the
blowers are started before the starter motor circuit or
engine ignition is energized. Noted there was no
interlock between blower and ignition switch, vessel was
able to operate without blower being energized. Prove
proper operation within 30 days.
Action required: 705 - Other - as specified
Due 29 June 2024
Resolved 25 June 2024
Resolution: received evidence that interlock has been properly installed.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 1 June 2022
Resolved
The bilge high level alarms are wired to operate when the engine ignition is in the off position. Prove that all bilge high level alarms function while vessel engines are in the on position and running.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 July 2022
Resolved 7 June 2022
Resolution: The deficiency was cleared to the satisfaction of a USCG Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 2 June 2021
Resolved
Prove proper servicing of the fire extinguishing system.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2021
Resolved 9 June 2021
Resolution: The deficiency was cleared to the satisfaction of an attending USCG Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 2 June 2021
Resolved
Prove proper operation of the center compartment and aft compartment high bilge level alarms.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 June 2021
Resolved 9 June 2021
Resolution: The deficiency was cleared to the satisfaction of an attending USCG Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 4 June 2019
Resolved
Ring Buoy found with deteriorating grab line due to UV degradation. Provide proof of serviceable approved ring buoy.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2019
Resolved 2 July 2019
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 7 June 2017
Resolved
Ensure a fire retardant foam is installed on the vent closures. Currently there is a flammable foam (sponge) used on the vent closures.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 July 2017
Resolved 12 July 2017
Fire Fighting › Remote Fuel Shutoff › General
Issued 7 June 2017
Resolved
Lubricate the stbd fuel shut off valve pull cable. The cable pull operated but it was stiff.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 July 2017
Resolved 7 July 2017
Engineering › Bilge Water Management System › Pump
Issued 7 June 2017
Resolved
Ensure that the activation of the aft fuel compartment high level bilge alarm does not also energize the forward bilge pump.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 July 2017
Resolved 7 July 2017
Communications › Audible Communications › Horn/Whistle
Issued 31 May 2016
Resolved
Repair or replace the vessel horn.
Condition: Damaged By Earlier Event
Due 15 June 2016
Resolved 14 June 2016
Resolution: Replaced
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 31 May 2016
Resolved
Re-secure the Velcro on the #1 natural air vent for the fuel compartment
Condition: Improper/Lack of Maintenance
Due 15 June 2016
Resolved 14 June 2016