MAURY USCG vessel records
← All vessels

GUNVOR MAERSK

GUNVOR MAERSK is a 2005 freight ship. The Coast Guard has recorded 29 inspections since 2016, most recently in October 2025, along with 22 deficiencies and 4 operational controls.

Records from 2016 to 2025. Most recent: inspection, 27 October 2025.

Built
2005
Last inspected
27 October 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 27 October 2025
…with no type recorded6
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9302891
1006410
Flag
HONG KONG
Maury page id
psix-1006410

Documentation record

Tonnage as PSIX records it126453 - Dead Weight, Metric Ton
168012 - Displacement, Metric Ton
98648 - Convention (Subpart B), Gross Ton
59086 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 29

27 October 2025 PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8259256
21 March 2025 PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8096856
27 March 2024 PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7885678
28 May 2023 In-Service Inspection · PSC A · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7698196
23 February 2023 PSC A
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7640640
8 December 2022 MARPOL Annex I Examination · PSC A · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7606059
26 May 2022 PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7459217
15 February 2022 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7397128
14 February 2022 In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7396542
10 November 2021 PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7348296
11 May 2021 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7194168
10 May 2021 PSC B · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7192892
12 February 2021 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7139866
29 November 2020 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7103080
23 November 2020 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7100259
22 November 2020 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7099868
28 October 2020 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7085909
8 September 2020 PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7052350
27 June 2020 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6988292
30 April 2019 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6673757
30 April 2019 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6676075
4 March 2019 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6635863
23 September 2018 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6546626
12 May 2018 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6417746
15 February 2018 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6355573
17 May 2017 Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6148410
21 January 2017 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6074489
20 June 2016 Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5913710
21 January 2016 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5801036

Deficiency record · 22

07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 27 March 2024 Resolved
THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF COMBUSTIBLE MATERIALS OR FLAMMABLE LIQUIDS. FOR THIS PRUPOSE THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET: IGNITION SOURCES SHALL BE RESTRICTED; PSCO OBSERVED POOLED OIL THROUGHOUT THE ENGINE ROOM DUE TO A PREVIOUSLY RUPTURED GASKET ON THE FUEL HEATER SLUDGE TANK
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 27 April 2024
Resolved 15 May 2024
Resolution: Vessel provided documentation attesting to pooled oil being cleaned.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 28 May 2023 Resolved
The fire resistance of doors shall be equivalent to that of the division in which they are fitted... PSCO observed multiple doors in the engine room missing its locking mechanism creating openings. Additionally, multiple doors failed to properly closed. 74 SOLAS 20 11-2/9.4.1.1.5.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2023
Resolved 5 June 2023
Resolution: The affected doors were adjusted and the missing locking mechanisms were replaced. The operation and closure of the doors was witnessed by the attending surveyor and found satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 23 February 2023 Resolved
Rescue boats shall be stowed in a state of continuous readiness for launching in not more than 5 min. Crew was unable to start rescue boat upon request.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 February 2023
Resolution: Inspection team observed rescue boat start 03 times and propeller engage before leaving vessel.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 23 February 2023 Resolved
The master... must maintain a ballast water management plan that has been developed specifically for the vessel. The BWM plan has not been updated to reflect recent changes to BWM certificate. Additionally, BWM plan does not address system limitations when conducting tank stripping operations for inspection. According to C/O treatment system cannot be operated while discharging for stripping operation.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 March 2023
Resolved 28 May 2023
12 - Dangerous Goods › N/A - No Subsystem › Dangerous goods / harmful substances in pack. form
Issued 23 February 2023 Resolved
Cylinders must always be secured and, when not in use, they must be stowed in a rack in an upright position, with the valve protection cap in place. PSCO observed 02 oxygen cylinders not secured and 01 cylinder not in use with no valve protection cap in place.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 23 February 2023
Resolved 23 February 2023
Resolution: Deficiency rectified on the spot.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 9 December 2022 Resolved
Every steam pipe and every fitting connected thereto through which steam may pass shall be so designed, constructed, and installed as to withstand the maximum working stresses to which it may be subjected. PSCO observed leaks from steam piping in the vicinity of the vessel's fuel pumps, bunker heating line for main engine, electrical store room, above the main engine, boiler, generator purifier room. 74 SOLAS (2004) II-1/33.1
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 9 December 2022
Resolved 10 December 2022
Resolution: Received class(ABS) report attesting to the rectification of all steam leaks.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 December 2022 Resolved
After survey of the ship under regulations 7,8,9, or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the administration. An epoxy repair was found on the port side of the M/E crank case and missing dog on port side crankcase hatch. 74 SOLAS (2020) I/11(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2023
Resolved 10 December 2022
Resolution: Received class(ABS) report attesting to the replacement of the missing dog for the crankcase door and that the epoxy patch was removed.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 8 December 2022 Resolved
15109- The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. The vessel's SMS states that releaving person shall inspect the engine room and fill in the checklist "Change of Duty Person." However there was no discrepancies noted on any of the checklists or the engine logbook addressing the material conditions of the engine room. As stated in deficiencies # 2 and # 3 the PSCO observed significant discrepancies throughout the machinery spaces, none of which were documented in the running worklist as indicated in the guidelines for engineers. These also provide evidence of a serious lack of effectiveness and implementation of the vessel's planned maintenance system and required routine inspections/rounds by the ship's crew. Due to objective evidence in the above deficiencies the vessel is not in substantial compliance with relevant conventions. The Captain of the Port questions the adequacy and overall implementation of the vessel's SMS under the ISM Code. An external audit is required to determine whether the ship is operating in accordance with the ISM Code. Provide a copy of the Audit report to the USCG when completed. 74 SOLAS (2020) IX/3.1 ISM Code 10.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 8 December 2022
Resolved 10 December 2022
Resolution: Received class (ABS) report with audit findings. ABS issued a non conformity due to no evidence found that the company is ensuring that update of controlled documents are being utilized and living documents, such as CE standing orders are updated.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 December 2022 Resolved
07126-Means shall be provided to control leaks of flammable liquids. PSCO observed excessive oil leaks and fuel accumulations found around the following: fuel pumps, base of the main engine, crank case oil mist detector, main engine fuel injectors, # 1 & # 2 diesel generator fuel injectors, under the steam turbo, and throughout the engine room. This in conjunction with the increased risk of fire associated with exposed electrical wires noted in def #3 poses a serious risk of fire. 74 SOLAS II-2/4.1.2
Condition: Improper Installation
Action required: 30 - Ship detained
Due 8 December 2022
Resolved 10 December 2022
Resolution: Received class(ABS) report attesting to the rectification of oil leaks.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 December 2022 Resolved
09209-Terminations and joints in all conductors shall be made as to retain the original electrical mechanical, flame retarding and, where necessary, fire-resisting properties of the cable. PSCO observed dead-end wires & broken electrical sheathing near fuel leaks by the vessel fuel pumps, oil soaked junction boxes on the M/E crank case, near the steam turbo and throughout the engine room. 74 SOLAS (2004)II-1/45.5.6
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 December 2022
Resolved 10 December 2022
Resolution: Received class(ABS) report stating that the wires were found segregated and taped to conceal any conductor. The breaker was also found locked out along with proper entry into the vessel's LOTO log.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 December 2022 Resolved
07113-All pipes to which this regulation refers shall be of steel or other equivalent materials to the satisfaction of the Administration. PSCO observed temporary repairs to the discharge end of the #1 Fire Pump and temporary repairs to the sewage pipes. ICLL (88 Proto) 22.6
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 8 December 2022
Resolved 10 December 2022
Resolution: Received class(ABS) report stating that the hole was repaired by welding by the ships crew and was tested to the satisfaction of the attending Surveyor.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 23 November 2020 Resolved
All lifesavings appliances shall be in good working order and ready for immediate use. Vessel reported an inoperable rescue boat crane. 74SOLAS(14) CH.3 Reg. 20.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 November 2020
Resolution: Received class report. Rescue boat crane repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 September 2020 Resolved
Ships shall be designed, constructed and maintained in compliance with the structural, mechanical and electrical requirements of a classification society. Service air pipe was found to have temporary repairs made due to a leak. 74 SOLAS (04) II-1/3-1
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2020
Resolved 27 October 2020
Resolution: class report attesting to proper repair
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 September 2020 Resolved
Means shall be provided to control the leaks of flammable liquids. Fuel oil bunker overflow line is leaking. 74 SOLAS (14) II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 October 2020
Resolved 27 October 2020
Resolution: class report attached.
Fire Fighting › Combustible Materials › Insulation
Issued 15 February 2018 Resolved
74SOLAS(2014) II-2/5.1.2 40ac Purpose of this regulation is to limit the fire growth potential in every space. For this purpose the following requirements shall be met: Means of control for flammable liquids in the space shall be provided. PSCO observed oil soaked lagging on generator #3 and M/E.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 23 March 2018
Resolution: Recieved class report attesting to the replacement of oil soaked lagging.
Engineering › Bilge Water Management System › Piping
Issued 21 January 2017 Resolved
<2050> 74SOLAS(04)II-1/26.1 (40ac): The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they were intended. Overboard discharge piping is excessively corroded due to lack of maintenance causing leakage during operation.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 May 2017
Resolution: Recieved class report attesting to the repair.
Engineering › Lubricating Oil Storage/Transfer System › Flange
Issued 21 January 2017 Resolved
<0750> 74SOLAS(04)II-2/4.3 (40ac) In spaces where penetration of oil products is possible, the surface of installation shall be impervious to oil or oil vapors. There were multiple leaking flanges resulting in oil-soaked lagging throughout the engine room.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 May 2017
Resolution: Recieved class report attesting to the repair.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 21 January 2017 Resolved
<0950> 74SOLAS(04)II-1/40.1.3 (40ac). Electrical installations shall be such that the safety of the passengers, crew, and ship from electrical hazards will be ensured. Drainage piping above fuel oil purifier motors is excessively corroded due to lack of maintenance, and presents potential electrical hazards.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 May 2017
Resolution: Class report attesting to the repair.
Engineering › Diesel Engine (propulsion-direct drive) › Blower, Centrifugal
Issued 21 January 2017 Resolved
<0710> 74SOLAS(04)II-2/5.1.2 (40ac). The purpose of this regulation is to limit the fire growth potential in every space of the ship. For this purpose, the following functional requirements shall be met: means of control for flammable liquids in the space shall be provided. Aft-main engine blower was leaking oil excessively and dripping onto the deck.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 May 2017
Resolution: Class report attesting to the repair.
Electrical › Electric Supply System (service) › Cable
Issued 21 January 2017 Resolved
<0830> 74SOLAS(04)II-1/45.5.5 (40ac). Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. Electrical conduit did not support cable in the overhead causing chafing of electrical cables.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 May 2017
Resolution: Class report attesting to the repair.
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 21 January 2016 Resolved
74 SOLAS (09) V/7.1.4 40a.c. EVERY SHIP SHALL BE PROVIDED WITH: A RECEIVER CAPABLE OF RECEIVING INTERNATIONAL NAVTEX SERVICE BROADCASTS IF THE SHIP IS ENGAGED ON VOYAGES IN ANY AREA WHICH AN INTERNATIONAL NAVTEX IS PROVIDED. NAVTEX IS CURRENTLY UNABLE TO RECEIVE MESSAGES.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 June 2016
Resolution: See attached Class Report.
Engineering › Lubricating Oil Service System › Purifier
Issued 21 January 2016 Resolved
74 SOLAS (09) II-2/4.1.1 10c. THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF COMBUSTIBLE MATERIALS OR FLAMMABLE LIQUIDS. FOR THIS PURPOSE, THE FOLLOWING FUNTIONAL REQUIRMENTS SHALL BE MET: MEANS SHALL BE PROVIDED TO PREVENT LEAKS OR FLAMMABLE LIQUIDS. LUBE OIL PURIFIER HAD EXCESSIVE OIL IN THE OIL PAN.
Due 21 January 2016
Resolved 21 January 2016
Resolution: CORRECTED ON THE SPOT.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.