MAURY USCG vessel records Sign in
← All vessels

CAPTAINYANNIS L

CAPTAINYANNIS L is a 2008 freight ship. The Coast Guard has recorded 10 inspections since 2011, most recently in April 2024, along with 11 deficiencies and 4 operational controls.

Records from 2011 to 2024. Most recent: inspection, 29 April 2024.

Built
2008
Last inspected
29 April 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9343546 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
1011128
Flag
MARSHALL ISLANDS
—
Maury page id
psix-1011128

Inspections, by type

…with no type recorded3
Years with a record 6 calendar years (2011–2024)
The 10 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it18540 - Convention (Subpart B), Net Ton
63833 - Displacement, Metric Ton
55688 - Dead Weight, Metric Ton
30657 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 10

29 April 2024 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7901443
29 April 2024 COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7903168
6 August 2021 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7279401
29 July 2021 Damage Survey · PSC B · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7265622
14 April 2021 Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7175513
25 July 2017 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6208940
21 July 2017 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6215743
21 January 2016 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5800933
23 August 2014 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4959292
3 August 2011 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4100367

Deficiency record · 11

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 August 2021 Resolved
The master, owner, operator, agent, or person in charge of a vessel equipped with ballast tanks that operates in the waters of the United States must employ one of the authorized ballast water management methods listed in 33 CFR 151.2025(a). Vessel’s ballast water management system is inoperable. Vessel has been granted an extraordinary circumstance to employ the ballast water management method listed in 33 CFR 151.2025(a)(3) to conduct cargo operations while in the Sector New Orleans COTP Zone. In accordance with 33 CFR 151.2040(b)(3), the vessel must discharge only that amount of ballast water operationally necessary to ensure the safety and stability of the vessel for cargo operations. 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 August 2021
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 2 August 2021 Resolved
An immersion suit, complying with the requirements of section 2.3 of the Code or an anti-exposure suit complying with section 2.4 of the Code, of an appropriate size, shall be provided for every person assigned to crew the rescue boat or assigned to the marine evacuation system party. PSCO observed three immersion suits with torn seams in locations of the entry zipper and boot seams. While onboard the vessel received a requisition containing two replacement immersion suits. 74SOLAS(20) III/7.3
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2021
Resolution: Reviewed and accepted ClassNKK report. Immersion suits satisfactorily replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 August 2021 Resolved
Internal combustion engines of a cylinder diameter of 200 mm or a crankcase volume of 0.6 m3 and above shall be provided with crankcase explosion relief valves of a suitable type with sufficient relief area. PSCO observed one explosion relief valve wired shut and other explosion relief valves that appeared to be over tightened causing deformation of the internal structure. Requesting clarification by certificate issuing authority.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 August 2021
Resolved 18 August 2021
Resolution: Reviewed and accepted ClassNKK report. Wire-tied explosion door was restored to normal condition, and other explosion doors tested by class IAW manufacturer instructions.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 2 August 2021 Resolved
Not less than two of these shall also be provided with lifebuoy self-activating smoke signals complying with the requirements of paragraph 2.1.3 of the Code and be capable of quick release from the navigation bridge;PSCO observed C/O not able to release free fall lifebuoy upon request.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 2 August 2021
Resolution: PSCO observed crew restore quick release life ring functionality by freeing up the pin used for release.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 29 July 2021 Resolved
The condition of the ship and its equipment shall be maintained to conform with provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed bilge water tank over flowing and crew was unable to locate the source of the water. Require class to certify the structural integrity and sea worthiness of the bilge water holding tank. 74SOLAS (2004) 1/11(a)
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 18 August 2021
Resolution: Reviewed and accepted ClassNKK report. Hull temp repaired with doubler and cement box, with permanent repairs to be complete by October
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 29 July 2021 Resolved
The condition of the ship and its equipment shall be maintained to conform with provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed crew pumping exceess bilge water into the aft peak tank. Require company to remove water by approved means and certify the tank clean and free of oil. 14SOLAS (2004) 1/11(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2021
Resolution: Reviewed and accepted ClassNKK report. Aft peak tank discharged to slop barge, and tank cleaned by hand by 3rd party.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 25 July 2017 Resolved
0999-Other(Safety in general) - Class A divisions are so constructed as to be capable of preventing the passage of smoke and flame to the end of the one hour standard fire test. Class A fire doors on B and C deck have worn gaskets and need to be replaced. 74 SOLAS (09) II-2/3.4 50ac
Due 24 August 2017
Resolved 31 July 2017
Resolution: Received, reviewed and accepted class report from ClassNK stating the deficiency was rectified. Gaskets for fire doors on stairways B & C deck renewed.
Engineering › Diesel Engine (propulsion-direct drive) › Distributor (air start)
Issued 25 July 2017 Resolved
1410-Propulsion main engine- Ships shall be designed, constructed and maintained in compliance with structural, mechanical and electrical requirements of a classification society. Vessel had five failed starts, technician report required. 74 SOLAS (04) II-1/3.1 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 July 2017
Resolution: Received, reviewed and accepted class report from ClassNK stating the deficiency was rectified. Fuel injection nozzles, plunger and barrel for all three generators were renewed. LSMGO heating temperature was too high and adjusted to 45 degree C.
Fire Fighting › Emergency Fire Pumps › Pressure
Issued 23 August 2014 Resolved
0740-Pumps-Fire Fighting systems and appliances shall be readily available for immediate use. Vessel in ballast condition and is unable to produce any pressure with emergency fire pump even after priming the system. After loading cargo, provide proof of operation to the satisfaction of RO. SOLAS 74a II-2/14.2.1.2. 17a
Action required: 17 - Rectify deficiencies prior to departure
Due 23 August 2014
Resolved 25 August 2014
Resolution: PSC New Orleans received a class report from NKK satisfying the requirement.
Fire Fighting › Fixed Fire Detection System › Annual Inspection
Issued 23 August 2014 Resolved
0715-detection-Fixed fire detection systems shall be periodically tested by means of equipment to which the detector is designed to respond. Crew testing fixed smoke and heat detectors with cigarette smoke and lighters. Request clarification from RO attesting to the satisfaction of this testing method. SOLAS 74a II-2/7.3.2 16a
Action required: 705 - Other - as specified
Due 8 September 2014
Resolved 25 August 2014
Resolution: PSC New Orleans received a class report from NKK satisfying the requirement.
Navigation › Piloting/Steering › Gyro Compass
Issued 31 July 2011 Resolved
The vessel's gyro compass was reported as being inoperable and an inbound LOD was requested.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 August 2011
Resolution: RCVD tech report attesting to the repair and proper operation of gyro.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.