Records from 1997 to 2025. Most recent: inspection, 10 March 2025.
Documentation record
Registered dimensions (L × B × D)61.2 ft × 24.0 ft × 7.7 ft
Registered tonnagegross 121 / net 82
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderV & B CHARTER BOAT CO INC · GREENVILLE, MS, UNITED STATES · built 1969
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPINE BLUFF, AR
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 5 June 2026 · expires 31 July 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it82 - Regulatory (Subpart C or D), Net Ton
121 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 19
10 March 2025
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8091062
20 June 2024
COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7938997
13 May 2024
TPO Audit
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7911526
14 October 2020
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 7076865
17 December 2019
Damage Survey
Physical examination · Marine Safety Detachment Ft. Smith · USCG Heartland District (CGD-H) · Activity 6886997
17 December 2019
Type not recorded
No type recorded · Marine Safety Detachment Ft. Smith · USCG Heartland District (CGD-H) · Activity 6904476
5 June 2019
TPO Audit
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6761555
16 May 2019
Initial Certification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6761681
26 January 2019
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6654657
25 April 2018
Industry Initiated Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6400868
12 August 2013
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4683503
3 October 2012
DAPI Audit · Industry Initiated Exam · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4469400
4 February 2010
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 3675884
28 April 2005
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2348137
19 July 2004
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2138636
13 June 2004
Type not recorded
No type recorded · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 2099595
25 May 1997
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 71454
25 May 1997
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 151763
25 May 1997
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 229127
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 20 June 2024
Resolved
Verification of compliance with the construction and arrangement design standards of this part must be performed according to the following table:
- If a vessel is a vessel on which a new installation that is not a “replacement in kind”, then the applicable requirements must be met before the new installation is performed. A work deck was installed on the bow of the vessel without oversight from the TPO and/or the OCMI.
Provide proof of a Stability Analysis conducted by a Naval Architect within 60 days.
Action required: 705 - Other - as specified
Due 14 September 2024
Resolved 13 September 2024
Resolution: Received required documentation.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 17 December 2019
Resolved
Vessel struck underwater obstruction, engine mounts shifted and broke bolts. Water ingressed through shaft packing.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 January 2020
Resolved 15 May 2024
Resolution: Reviewed report clearing 835
10 - Safety of Navigation › N/A - No Subsystem › Voyage or passage plan
Issued 17 December 2019
Resolved
Navigation assessment for the intended route and operation was not conducted prior to getting underway. 46 CFR 140.635(a)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2020
Resolved 15 May 2024
Resolution: Navigational assessment was compleated clearing 835