Records from 2009 to 2025. Most recent: inspection, 7 May 2025.
Inspection history · 30
7 May 2025
COI Inspection · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8130342
12 November 2024
COI Inspection · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8029141
18 September 2024
Deficiency Check · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8004721
19 March 2024
Internal Structural Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7883503
16 August 2023
MTSA Verification · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7756859
1 June 2022
Periodic Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7458931
3 February 2022
Internal Structural Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7390128
27 September 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7339370
30 August 2021
Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7300395
10 December 2020
Annual Inspection · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7109751
17 November 2020
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7096630
8 August 2019
Cargo Tank Internal · MARPOL Annex I Examination · Drydock Exam · COI Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6767118
24 February 2019
Internal Structural Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6625610
30 July 2018
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6495331
25 August 2017
Internal Structural Exam · Periodic Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6244552
11 July 2016
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5937237
8 February 2016
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5811466
21 December 2015
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5785372
4 September 2015
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5234655
28 July 2015
MTSA Verification · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5199067
21 July 2015
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5191255
31 July 2014
Internal Structural Exam · Deficiency Check · COI Inspection · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4940275
23 April 2014
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4842268
22 July 2013
Annual Inspection · MARPOL Annex I Examination · MTSA Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4610974
4 September 2012
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4431874
20 August 2012
Internal Structural Exam · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4416563
16 August 2011
MARPOL Annex I Examination · Annual Inspection · MARPOL Annex VI Survey · MTSA Verification
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4117362
9 July 2010
Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3790591
7 August 2009
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 3558351
23 July 2009
MARPOL Annex VI Survey · Initial Certification · MARPOL Annex I Examination · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3543551
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 16 May 2025
Resolved
Boilers, main and auxiliary machinery, and piping systems shall conform to the requirements of subchapter F (Marine Engineering) of this chapter, except as otherwise provided for in this subchapter.
Starboard side generator's radiator high level fluid sensor is inop causing fault in system.
Replace sensor.
46 CFR 32.35-1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 June 2025
Resolution: Sensor no longer providing fault. Tested satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 16 May 2025
Resolved
The last 1.0 meter (3.3 feet) of vapor piping upstream of the vessel vapor connection and each end of a vapor hose must be—
(1) Painted in the sequence of red/yellow/red. The width of the red bands must be 0.1 meter (0.33 foot) and the width of the middle yellow band must be 0.8 meter (2.64 feet); and
(2) Labeled with the word “VAPOR” painted in black letters at least 50.8 millimeters (2 inches) high.
Port side vaporline is not painted with required information /colors.
46 CFR 39.2001(h)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 June 2025
Resolution: Line painted correctly.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 19 March 2024
Resolved
All tank vessels, the construction or conversion of which is started on or after July 1, 1951, shall conform to the requirements in this subpart in construction of hulls. The hull and deckhouses shall be of steel or iron construction except that the pilothouse and decks over quarters may be constructed of wood. Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society.
The following voids hatch coamings have excessive wastage on knife edge. #1P,#2P,#4P,#5P,#1S,#2S,#3S,#4S, port forward rake hatch and aft Starboard rake hatch. Crop and renew hatch coamings at next scheduled dry dock to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 15 October 2024
Resolved 30 October 2024
Resolution: Received report from ABS finding #116, permanent repairs were completed, examined and considered satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 16 August 2023
Resolved
A pressure gage shall be installed for each pump discharge, and it shall be located at a point visible with respect to the pump controls. Pressure gauges for cargo pump where not visible from inside the operating station.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 March 2024
Resolution: The gauge is visible from where the cargo pumps are engaged by the PTO.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 2 June 2022
Resolved
All transfer piping and hoses must be hydrostatically tested at one and a half (1 1/2) times its maximum allowable working pressure. The transfer piping on the barge was tested at its working pressure (150 psi). Tank barge is to limit its transfer pressure to no more than 100 psi until a new hydrostatic test at 225 psi is conducted.
Action required: 705 - Other - as specified
Due 2 June 2022
Resolved 4 November 2024
Resolution: MI checked test record during inspectin
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 2 June 2022
Resolved
The ring, lines, and letters of the load line shall be permanently marked on the sides of the ship to the satisfaction of the Administration. The load line markings on the tank barge did not seem to be permanently marked and were painted with an aft trim (not parallel to the freeboard deck).
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 August 2022
Resolved 30 October 2024
Resolution: Received report from ABS finding #108.2 "The Load Line Marks were permanently marked by welding to the satisfaction of the attending ABS Surveyor"
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 February 2022
Resolved
AFT RAKE port side door between FR 42-43 C/R long #1
as marked.
Action required: 705 - Other - as specified
Resolved 30 October 2024
Resolution: Received report from ABS finding #116, permanent repairs carried out, examined and considered satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 February 2022
Resolved
4 Void:
Stbd side: FR 28 transversal C/r between 3/4 longitudinal
Port Side: FR 30 C/R 3 longitudinal
Action required: 705 - Other - as specified
Resolved 30 October 2024
Resolution: Received report from ABS finding #116, permanent repairs carried out, examined and considered satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 February 2022
Resolved
3 Void:
Port Side: FR 21 C/R 4 longitudinal
FR 18 C/R 4-5 longitudinal
Action required: 705 - Other - as specified
Resolved 30 October 2024
Resolution: Received report from ABS finding #116, permanent repairs carried out, examined and considered satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 February 2022
Resolved
2 Void:
Stbd side: FR 16 transversal C/r between 3/4 longitudinal
FR 15 transversal C/r between 3/4 longitudinal.
Action required: 705 - Other - as specified
Resolved 30 October 2024
Resolution: Received report from ABS finding #116, permanent repairs carried out, examined and considered satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 February 2022
Resolved
1 Void:
Stbd side: FR 11 between 1 long and sheer strake C/R as marked.
Action required: 705 - Other - as specified
Resolved 30 October 2024
Resolution: Received report from ABS finding #116, permanent repairs carried out, examined and considered satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 20 September 2021
Resolved
The annual inspection shall include an inspection of the structure is adequate and satisfactory for the route and service intended. It was noted that the starboard side aft stairs leading into the raised walkway aft of the machinery space are wasted and broken.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 27 September 2021
Resolution: Stairs were properly repaired.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 September 2021
Resolved
All portable extinguishers on board tank barges shall be of an approved type. There are 2 portable fire extinguishers which brackets are broken. The fire extinguisher by the entrance to the compressor space is being held by thin ropes. There is another extinguisher by the starboard side access ladder to the engine compartment that is placed inside its box but no cover is present. The extinguisher could fall at any time.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 30 September 2021
Resolution: both extinguisher brackets were corrected.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 20 September 2021
Resolved
Containment systems on board tank barges with a capacity of 250 barrels or more carrying oil as cargo in bulk must have mechanical means of closing each drain. It was noted that there is a overall practice of not installing the mechanical plugs on containment systems and on scuppers.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 15 November 2021
Resolution: Received pictures attesting to the installation of containment plugs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 September 2021
Resolved
Each switchboard must meet the location and installation requirements in section 8.2 of IEEE or IEC 60092-302. The switchboard’s lights were not operating.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 27 January 2022
Resolution: Received evidence of the proper operation of the electrical switchboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 20 September 2021
Resolved
Exhaust pipe installations must conform to the requirements of ABYC P-1. The #1 generator, the port and starboard fuel oil pump’s prime movers’ exhaust piping is showing signs of leaks as evidenced by the soot accumulated on the lagging.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 15 November 2021
Resolution: Received email and videos attesting to the repair of the exhaust leaks.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 September 2021
Resolved
A pressure gauge shall be installed for each pump discharge. The pressure gauges located at the outer bulkhead by the cargo pumps for the starboard gas oil and port fuel oil cargo piping are broken.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 October 2021
Resolved 24 January 2022
Resolution: Received pictures of the newly installed pressure gauges.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 December 2020
Resolved
Annual inspection. Your vessel must undergo an annual inspection within 3 months before or after each anniversary date. Barge miss annual inspection date.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 March 2021
Resolution: Virtual assesment conducted.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 November 2020
Resolved
A barge must undergo an annual examination every year. A barge must undergo a MARPOL ANNEX I examination every year. Inspections deferred for 90 days due to lockdown measures implemented in Puerto Rico.
Action required: 705 - Other - as specified
Resolved 11 June 2021
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 February 2019
Resolved
Stern Box (STBD): Crop and renew side shell plating and damaged structural members between frames 44 and 43 and overhead and side long 3.
Action required: 705 - Other - as specified
Due 30 September 2019
Resolved 19 August 2019
Resolution: Receieved report from ABS detailing rectification of deficient item.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 February 2019
Resolved
Stern Box (PORT): Crop and renew side shell plating and damaged structural members (side longs, tripping brackets) between frames 44 and 43 and overhead and side long 3.
Action required: 705 - Other - as specified
Due 30 September 2019
Resolved 19 August 2019
Resolution: Receieved report from ABS detailing rectification of deficient item.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 February 2019
Resolved
Stern Box (PORT, inboard): Crop and renew fractured frame and tripping bracket between frame 44 and 43.
Action required: 705 - Other - as specified
Due 30 September 2019
Resolved 19 August 2019
Resolution: Receieved report from ABS detailing rectification of deficient item.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 February 2019
Resolved
Void Space #3 (PORT): Repair broken welds on side long #2 between frames 26-25.
Action required: 705 - Other - as specified
Due 30 September 2019
Resolved 19 August 2019
Resolution: Receieved report from ABS detailing rectification of deficient item.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 February 2019
Resolved
Void Space #1 (PORT): Replace section of side long #2 with same size side long.
Action required: 705 - Other - as specified
Due 30 September 2019
Resolved 19 August 2019
Resolution: Receieved report from ABS detailing rectification of deficient item.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 February 2019
Resolved
Repair all damaged void space hatch covers and hinges.
Action required: 705 - Other - as specified
Due 30 September 2019
Resolved 19 August 2019
Resolution: Receieved report from ABS detailing rectification of deficient item.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 25 August 2017
Resolved
Each nonmetalic transfer hose shall be tested to at least 1.5 times the MAWP (225 psi). Vessel had 09 hoses tested to the MAWP (187 psi).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 September 2017
Resolved 9 August 2018
Resolution: Completed
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 25 August 2017
Resolved
Each transfer pipe must not leak under static liquid pressure of at least 1.5 times the MAWP (225 psi). Vessel's GAS OIL pipe was test to the MAWP (187 psi).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 September 2017
Resolved 9 August 2018
Resolution: Completed
Operations/Management › Pollution › Control of Discharge of Oil
Issued 25 August 2017
Resolved
Portside GAS OIL pump Emergency Stop had a temporary spliced extension cord tied into the system.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 September 2017
Resolved 9 August 2018
Resolution: Completed
Construction/Loadline › Hull › Transverse Frame
Issued 25 August 2017
Resolved
#35 transverse frame in the #5 starboard void was warped about 60% in the upper part of the frame.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 3 September 2019
Resolved 8 August 2019
Resolution: Frame was properly repaired.
Construction/Loadline › Hull › Weld
Issued 25 August 2017
Resolved
Portside #3 void, frame #20, 3rd from the bottom side long has a fractured weld.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 3 September 2019
Resolved 8 August 2019
Resolution: Fractured weld repaired.
Construction/Loadline › Hull › Weld
Issued 25 August 2017
Resolved
Portside #2 void, in between frames 12 and 13, 4rd from the top side long has a fractured weld.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 3 September 2019
Resolved 8 August 2019
Resolution: Fractured weld repaired.
Communications › Radio Communications › EPIRB
Issued 11 August 2016
Resolved
Remove or properly service EPIRB onboard tank barge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 August 2016
Resolved 1 February 2017
Resolution: Vessel operator stated that the EPIRB will be removed from the barge. EPIRB is not required since this is an unmanned barge.
Lifesaving › Inflatable Liferafts › Servicing
Issued 11 August 2016
Resolved
Remove or properly service inflatable life raft onboard the tank barge.
Condition: Invalid
Action required: 705 - Other - as specified
Due 25 August 2016
Resolved 9 January 2017
Resolution: Received servicing report for the barge's liferaft.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 31 July 2014
Resolved
Prior to cargo ops, provide proof of hydrostatic testing of cargo hoses, proper marking of cargo hoses, and written records of cargo hose testing.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 September 2014
Resolution: Owner provided test record and photos of stenciled hoses.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 22 July 2013
Resolved
Prove testing of cargo pump pressure gages.
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 1 October 2013
Resolution: Received digital pictures of new cargo pump pressure gauges.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Approval
Issued 22 July 2013
Resolved
Prove (3) fire extinguishers in machinery space areCoast Guard approved.
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 2 October 2013
Resolution: Received invoice for new CG approved portable fire extinguishers.
Electrical › Electric Generation Source (service) › Generator
Issued 22 July 2013
Resolved
Prove service generators located in auxiliary machinery room have been derated.
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 3 September 2013
Resolution: Recieved digital pictures of new plates and a statement from the owners rep attesting to the plates now being marked as 50 degrees C.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 22 July 2013
Resolved
Prove battery chargers meet enclosure requirements.
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 28 August 2013
Resolution: Rcvd documentary evidence Master Volt charger met enclosure requirements. The Guest charger was reported as not in use and was removed. Rcvd digital pictures of the removed charger.
Electrical › Electrical Distribution System (service) › Cable
Issued 22 July 2013
Resolved
Prove cables for battery chargers meet both flexible and shipboard cable requirements.
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 31 October 2013
Resolution: Rcvd digital picture via email of battery charger hard wired. All sat as per 5 Sep 2013 email w/ MSC.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 22 July 2013
Resolved
Prove proper operation of ground detection.
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 7 October 2013
Resolution: Recieved digital picture of ground detection and invoice for indicator lamsp.
Pollution Prevention/Response › Response Equipment › Containers
Issued 22 July 2013
Resolved
Prove OPA 90 spill kit meets requirements for 7 barrels.
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 13 September 2013
Resolution: Received pictures of new 7 bbl spill kit.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 22 July 2013
Resolved
Prove proper operation of generator overspeed trips.
Action required: 705 - Other - as specified
Due 24 October 2013
Resolved 29 August 2014
Resolution: Owner provided letter from Manufacture.
Personnel › Manning/Qualifications › Person in Charge (PIC) of Transfer
Issued 22 July 2013
Resolved
Provide PIC designation list.
Action required: 705 - Other - as specified
Due 24 August 2013
Resolved 2 October 2013
Resolution: Recieved copy of PIC designation list.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 20 August 2012
Resolved
It was discovered that vessel's ISE dates had expired on 30 July 2012. Inpectors conducted an ISE on 29 August 2012, vessel was operating for 30 days with an invalid COI.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 August 2012
Resolved 3 September 2014
Resolution: Completed ISE
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 6 July 2009
Resolved
33 CFR 155.1040(k) The barge-specific appendix must be amended to include the capacities of all ballast tanks onboard this barge or state that these tanks are not applicable.
Due 6 August 2009
Resolved 2 September 2009
Resolution: Plan holder amended TVRP Control #05212 to include the capacities of all ballast tanks onboard the barge. Deficiency cleared.