Inspection history · 28
25 June 2026
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8413528
27 March 2025
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8100442
9 September 2024
PSC B
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7995201
14 August 2023
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7767823
7 September 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7553434
30 August 2022
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7546921
9 February 2022
Administrative Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7393659
7 February 2022
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7391679
1 December 2021
PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7359198
24 November 2021
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7355012
18 November 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7353870
17 November 2021
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7352671
9 November 2021
PSC B
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7343452
28 April 2021
Deficiency Check · PSC B
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7184466
27 April 2021
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7183649
29 December 2020
Explosive Handling Operation-Commercial
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7112127
29 December 2020
PSC B
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7115852
2 June 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6966494
1 June 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6965160
29 May 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6963568
29 May 2020
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6963650
22 May 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6420351
18 January 2018
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6431526
5 May 2017
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6139306
4 May 2017
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6181427
27 April 2017
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6136610
24 April 2017
ISPS II Exam · Ballast Water Examination · PII Safety Exam · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6131183
14 February 2016
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5814985
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 27 March 2025
Resolved
THe Purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, The following Functional Requirements shall be met: Means shall be provided to control leaks of flammable liquids.
PSCO observed 02 oil leaks in the purifier flats and oil accumulation in the bilges.
74 SOLAS (04) II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 March 2025
Resolution: Class report submitted that issue was resolved.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 30 August 2022
Resolved
Machinery Spaces of category A above 500m^3 in volume shall... be protected by an approved type of fixed water-based or equivalent... In the case of periodically unattended machinery spaces, the fire extinguishing system shall have both automatic and manual release capabilities.
PSCO observed that all valves on the water mist system were in the closed position preventing automatic release. Crew corrected on the spot.
74 SOLAS 04 II-2/5.6.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 13 September 2022
Resolved 30 August 2022
Resolution: Crew corrected on the spot, opened all valves.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 30 August 2022
Resolved
The following functional requirement shall be met: Fixed fire detection and fire alarm system installations shall be suitable for the nature of the space, fire growth potential and potential growth generation of smoke and gases
PSCO observed inoperable smoke detection alarm above the inceinerator and a second smoke detector above the auxiliary engines was obstructed by cardboard
74SOLAS04 11-2/7.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 September 2022
Resolved 15 September 2022
Resolution: Defective detectors were replaced and tested to the satisfaction of Class. See attached Class survey report.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 30 August 2022
Resolved
Safe escape routes shall be provided, escape routes shall be maintained in a safe condition, clear of obstacles.
PSCO observed an escape trunk in the engine room obstructed by a portable fan and a second escape trunk access door was locked.
74SOLAS04 II-2/13.1.1-2
Action required: 17 - Rectify deficiencies prior to departure
Due 13 September 2022
Resolved 30 August 2022
Resolution: Resolved by crew. Crew unlocked door and removed fan.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 24 November 2021
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed immersion suits zipper seal deteriorated and broken. 74 SOLAS (04) III/20.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 November 2021
Resolution: Class and Flag made arrangements to receive equipment at next port (Fort Lauderdale) in which the suits are not needed.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 24 November 2021
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed faulty automatic water-mist valve leading to the #3 auxiliary engine. Valve will not close and remains in the open condition requiring the crew to keep the valve and system in local control while operating in a periodically un-manned machinery space. 74 SOLAS (04) II-2/14.2.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 November 2021
Resolution: Reviewed class report all sat.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 24 November 2021
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be establishted by the company. In meeting these requiremens, the company should ensure that: any non-conformity is reported, with its possible cause, if known. PSCO observed fault on water-mist system. After reviewing alarm records it was found that system has been in fault for extended period and not reported. Request company provide corrective action plan within 30 days. 74 SOLAS (20) IX/3.1 ISM Code 10.2.2
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 February 2022
Resolution: Received class report attesting to the proper operation of the water mist system.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 November 2021
Resolved
No electrical equipment shall be installed in any space where flammable mixtures are liable to collect, including in paint lockers, unless the Administration is staisfied that such equipment is: appropriately certified for safe usage in the vapors likely to be encountered.
PSCO observed that the feed through connector on the smoke detector was damaged, causing exposure of internal wiring to the atmosphere in the paint locker.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 November 2021
Resolution: Vessel provided ClassNK survey which stated:Verified the connector on the smoke detector was fixed with new terminal. The operational test of smoke detector was carried out; found in order.The above corrective action of deficiency is satisfaction to Class
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 November 2021
Resolved
means shall be provided to control leaks of flammable liquids
PSCO observed fuel oil leak on #1 generator.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 17 November 2021
Resolution: Vessel repaired leak on #1 generator while inspection team on board.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 9 November 2021
Resolved
Rescue boats shall have sufficient mobility and manuverability in a seaway to enable persons to be retrieved from the water. The throttle of the rescue boat could not be moved easily or gradually, significantly reducing mobility and manuverability in the event of an emergency.
74SOLAS(20)iii/31.2
LSA CODE 5.1.1.7
Action required: 15 - Rectify deficiencies by next port
Due 9 November 2021
Resolved 18 November 2021
Resolution: On 18 Nov. 2021, surveyor on board and verified the throttle cable of Rescue boat was replaced with new one and operational test was carried out: found in order.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 November 2021
Resolved
THE MACHINERY, BOILERS, AND OTHER PRESSURE VESSELS, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. THE #1 MAIN AIR COMPRESSOR PUMP IS MODIFIED WITH AN EXTENDED PNEUMATIC PIPING HELD UPRIGHT BY A BLOCK OF WOOD.
72SOLAS(04)II-2/26
Action required: 15 - Rectify deficiencies by next port
Due 9 November 2021
Resolved 18 November 2021
Resolution: Verified the extended pneumatic piping of drain solenoid valve for No.1 main air compressor was replaced with new spare ones by ship's staff on 10 November 2021 at Corpus Christi; found in order.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 November 2021
Resolved
Emergency switchboards shall be so arranged as the front of the switchboard shall be suitably guarded. Emergency generator switchboard found without suitable handles or grab rails.
74SOLAS(04)II-1/45.5.4
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 November 2021
Resolved 18 November 2021
Resolution: Verified the 3 grab handles fabricated on Emergency generator switchboards were installed by ship's staff on 11 Nov. 2021; found in order.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 November 2021
Resolved
Where cables which are installed in hazardous areas introduce the risk or fire or explosion in the event of an electrical fault in such areas, special precaustions againts such risks shall be taken to the satisfactionof the administration. Vessel has numerous deck lighting with missing or deteriorated grounding cables.Electrical socket 9L3-1 on port side is broken from bracket and cable deteriorated. Bunker station high level audible alarms on both port and starboard found disconnected and inoperable with exposed wires.
74SOLAS(04)II-1/45.5.4
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 November 2021
Resolved 18 November 2021
Resolution: Function test of bunker station high level audible alarms was carried out; found in order. and examined the cable wires were installed clearly.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 9 November 2021
Resolved
DOORS REQUIRED TO BE SELF CLOSING SHALL NOIT BE FITTEDWITH HOLD BACK HOOKS. EMERGEBCY GENERATOR DOOR FOUND WITHHOLD BACK HOOK. DOOR REQUIRED TO BE SELF CLOSING ACCORDING TO FIRE CONTROL PLAN.
74SOLAS(04)II-2/9.4.2.2
Action required: 17 - Rectify deficiencies prior to departure
Due 9 November 2021
Resolved 9 November 2021
Resolution: REMOVED HOLD BACK HOOK FROM DOOR
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 December 2020
Resolved
Means shall be provided where by normal operations of propulsion machinery can be sustained. Special consideration shall be given to the malfunctioning of the fuel oil supply systems for boilers or engines. PSCO noted that a failed seal on the G.O. M/E purifier booster unit was gushing gas oil. The containment under unit was full of gas oil and E/R overtaken by odor of vapor.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 30 December 2020
Resolved 30 December 2020
Resolution: Class NK surveyor attended vessel and attested to proper repair and operation of gas oil booster.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 29 December 2020
Resolved
The SMS shall be maintained IAW the provisions of the ISM Code. The company should establish procedures to ensure that the ship is maintained in conformity with the rules and provisions established by the code. PSCO discovered that there is no provisions in place to inspect or maintain portable fire extinguishers in the engine room.
Condition: Design Flaw
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 December 2020
Resolved 28 April 2021
Resolution: Vessel had SMS for portable extinguishers in engineering spaces established.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 29 December 2020
Resolved
Each transfer pipe system, including each metalic hose, must not leak under static liquid pressure at least 1 1/2 times the MAWP. PSCO noted that bunker lines were tested with air, and not hydrostatically.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 December 2020
Resolved 30 December 2020
Resolution: Class NK surveyor attended vessel and had ships crew test bunker lines IAw 33CFR156.170 All sat.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 29 December 2020
Resolved
Maintenance, testing, and inspections shall be carried out based on guidelines developed by the Organization. PSCO noted multiple portable fire extinguishers in E.R and in engineering spaces were missing nozzles and corroded.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 29 December 2020
Resolved 29 December 2020
Resolution: All portable fire extinguishers in question which were missing hoze and nozzle were resplaced by spares. Replacement of extinguishers were witnessed by PSCO.
Electrical › Electric Generation Source (emergency) › Generator
Issued 22 May 2018
Resolved
001. 1499. WHERE THE EMERGENCY SOURCE OF ELECTRICAL POWER IS A GENERATOR, IT SHALL BE: AUTOMATICALLY STARTED AND SUPPLYING THE REQUIRED LOAD AS QUICKLY AS IS SAFE AND PRACTICABLE SUBJECT TO A MAXIMUM OF 45 S. THE EMERGENCY GENERATOR FAILED TO AUTOMATICALLY TAKE A LOAD. 74 SOLAS (04) II-1 43.3.1.3
60AC
Action required: 60 - Rectify deficiencies prior to movement
Due 23 May 2018
Resolved 26 May 2018
Resolution: Received e-mail w/ DNV-GL classification society survey report #1163043 stating deficiency rectified. Survey report states: Emergency ACB close timer inside emergency switchboard was replaced w/ ship's spare.
Communications › Internal Communications System › Sound-powered Telephone
Issued 22 May 2018
Resolved
002. 1699. A MEANS OF COMMUNICATION SHALL BE PROVIDED BETWEEN THE NAVIGATION BRIDGE AND THE STEERING GEAR COMPARTMENT. SOUND POWER PHONES THOUGHOUT THE SHIP AND STEERING GEAR COMPARTMENT WERE INOPERABLE. ALSO THE RADIOS DID NOT WORK BETWEEN THE BRIDGE AND STEERING GEAR COMPARTMENT. 74 SOLAS (04) II-1 29.10 17AC
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 May 2018
Resolution: Received e-mail w/ DNV-GL classification society survey report #1163043 stating deficiency rectified. Survey report states: Main process unit was replaced by company technical engineer.
Documentation › Logs/Records › Required Logbook Entries (Annex VI-Related)
Issued 22 May 2018
Resolved
003. 2199. THOSE SHIPS USING SEPERATE FUEL OILS TO COMPLY WITH PARAGRAPH 4 OF THIS REGULATION AND ENTERING OR LEAVING AN EMISSION CONTROL ARE SET FORTH IN PARAGRAPH 3 OF THIS REGULATION SHALL CARRY A WRITTEN PROCEDURE SHOWING HOW THE FUEL OIL CHANGEOVER IS TO BE DONE. THE VESSEL DOES NOT HAVE FUEL CHANGEOVER PROCEDURES ON BOARD. MARPOL VI/14.6 10C
Action required: 10 - Deficiency Rectified
Resolved 22 May 2018
Resolution: Change over procedures were obtained electronically through ship's company.
Electrical › Electric Generation Source (emergency) › Generator
Issued 24 April 2017
Resolved
1499-Each emergency generating set arranged to be automatically started shall be equipped with starting devices. A second source of energy shall be provided for an additional three starts. Currently the vessel only has one source of power to start the emergency generator. 74SOLAS(04)11-1 Reg44.2 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 April 2017
Resolution: Received class report attesting to proper repair and operation of second source of power.
Engineering › Fuel Oil Service System › Piping
Issued 24 April 2017
Resolved
1420 Means shall be provided to control leaks of flammable liquids. Fuel leaks were discovered on the fuel pump and a valve on the fuel oil supply unit. 74SOLAS(2014) 11-2 Reg. 4.1.1 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 April 2017
Resolution: Received class report attesting to proper repair and test of fuel pump and valve.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 24 April 2017
Resolved
9800-The construction of doors and door frames in "A" class divisions shall provide resistence to fire as well as to the passage of smoke and flame equivalent to that of the bulkhead in which the doors are situated. The "A" class boundary door leading to the incinerator space has been penetrated to accomadate a hold-back compromising its "A" class properties. 74SOLAS(2014)II-2 Reg.4.1.1.2 17ac
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 April 2017
Resolution: Received class report attesting to proper repair of hold back arrangement.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 24 April 2017
Resolved
9800-Doors required to be self-closing shall not be fitted with hold-backs. The door leading into the incinerator space has a hold-back. 74SOLAS(2014) II-2 Reg. 9.4.2.2 10c
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 April 2017
Resolved 24 April 2017
Resolution: Corrected on the spot