MAURY USCG vessel records Sign in
← All vessels

ARGO

ARGO is a 2009 freight ship. The Coast Guard has recorded 14 inspections since 2009, most recently in September 2024, along with 4 deficiencies and 2 operational controls.

Records from 2009 to 2024. Most recent: inspection, 6 September 2024.

Built
2009
Last inspected
6 September 2024
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9421128 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
1017791
Flag
ANTIGUA AND BARBUDA
—
Maury page id
psix-1017791

Inspections, by type

…with no type recorded4
Years with a record 5 calendar years (2009–2024)
The 14 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it5630 - Convention (Subpart B), Gross Ton
2883 - Convention (Subpart B), Net Ton
7807 - Dead Weight, Ton
10982 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 14

6 September 2024 PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7994094
3 January 2012 Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4217494
14 December 2011 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4204264
18 December 2010 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3913211
17 December 2010 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3912347
12 November 2010 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3886664
8 November 2010 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3887178
2 September 2010 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3834894
23 February 2010 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3685496
20 February 2010 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3682908
13 January 2010 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3663093
3 January 2010 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3657947
26 July 2009 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3546443
3 July 2009 PII Safety Exam · ISPS II Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3520754

Deficiency record · 4

Electrical › Electric Generation Source (emergency) › Generator
Issued 14 December 2011 Resolved
1499-AUX Machinery- A second source of energy shall be provided for an additional three starts within 30 min . Vessels emergency generator has two sources of starting, a battery bank and a hand pump hydraulic start. The battery means of starting tested satisfactory however when chief eng and second engineer tested the hand pump hydraulic start it did not start 74SOLAS 09 CON II-1/44.2
Action required: 17 - Rectify deficiencies prior to departure
Due 14 December 2011
Resolved 15 December 2011
Resolution: Received, reviews and accepted class report from [name withheld] stating a technician trouble shot the hydraulic start system and found the pressure accumulator faulty. Class issued a condition of class to repaired accumulator within 30 days.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 14 December 2011 Resolved
0199 Other Certificates The operator of a vessel with a capacity of 250 or more barrels of oil, hazardous material or liquefied gas shall provided transfer procedures that meet the requirements of 33CFR155.750 and part 156 of this chapter for transferring to or from the vessel and from tank to tank within the vessel. Chief Engineer was unable to provide vessel oil transfer procedures. 33CFR155.720
Action required: 703 - Prior to bunkering operations
Due 14 December 2011
Resolved 3 January 2012
Resolution: Received proper documentation from the vessel satisfying the requirement.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 14 December 2011 Resolved
0199-Other Certificates- No person may use any equipment for transfer operations unless the vessel test and inspects the equipment. Each loading arm and transfer pipe system must not leak under static liquid pressure at least 1.5 times the maximum allowable working pressure. Vessel has not conducted hydrostatic test of the bunker lines. 33CFR156.170
Action required: 703 - Prior to bunkering operations
Due 14 December 2011
Resolved 3 January 2012
Resolution: Received proper documentation from the vessel satisfying the requirement.
Electrical › Electric Generation Source (emergency) › Generator
Issued 14 December 2011 Resolved
1499- Aux Machinery- [name withheld] stated the emergency generator was tested weekly. Upon reviewing PMS records it showed that the emergency generator was tested 10DEC11 and 13NOV11. Records showed that the E-generator was not being tested weekly and was only being tested on the battery bank and not the hydraulic hand pump. Provide corrective action plan with concurrence from Company 09SOLAS II-1/43.7
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 14 December 2011
Resolved 3 January 2012
Resolution: Received proper documentation from the vessel satisfying the requirement.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.