ISLAND STAR is a 1969 passenger vessel (inspected). The Coast Guard has recorded 26 inspections since 2016, most recently in May 2026, along with 34 deficiencies and 4 casualty investigations between 2006 and 2015.

Records from 2006 to 2026. Most recent: inspection, 12 May 2026.

Built
1969
Last inspected
12 May 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 12 May 2026
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDK4377
102360
Flag
UNITED STATES
Maury page id
psix-102360

Documentation record

Registered dimensions (L × B × D)56.5 ft × 13.0 ft × 12.3 ft
Registered tonnagegross 45 / net 40
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCOLUMBIA YACHT CORP · COSTA MESA CA, UNITED STATES · built 1969
Hull materialFRP (Fiberglass)
PropulsionAuxiliary Sail
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portLAHAINA, HI
Trade endorsementsCoastwise, unrestricted, Recreational
DocumentationValid · issued 5 February 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it45 - Regulatory (Subpart C or D), Gross Ton
40 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 26

12 May 2026 Deficiency Check · COI Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8371917
8 September 2025 Drydock Exam · Examination of Repairs
Physical examination · OP location-Sector Honolulu Prevention Department- Kailua Kona · USCG Oceania District (CGD-O) · Activity 8229985
15 May 2025 Annual Inspection · Deficiency Check
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8136357
1 May 2024 Deficiency Check · Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 7904309
5 September 2023 Drydock Exam · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7785369
16 May 2023 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7689873
25 May 2022 Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7463542
4 May 2022 Simplified Stability Test
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7454266
6 April 2022 Construction Oversight · Plan Review "T" Boat
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7458452
20 January 2022 Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7383329
21 December 2021 Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7371275
10 September 2021 Drydock Exam · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7324392
6 September 2021 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7305384
25 May 2021 COI Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7205965
26 August 2020 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7024887
8 October 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6831042
16 September 2019 In-Service Inspection · Internal Structural Exam · Drydock Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6820171
29 July 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6766750
11 July 2019 Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6746164
24 July 2018 Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6489924
8 September 2017 Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6262964
27 July 2017 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6229022
9 June 2017 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6173712
29 May 2017 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6166784
7 March 2017 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6100685
8 June 2016 Deficiency Check · COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5900556

Deficiency record · 34

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 May 2026 Resolved
A vessel must must be provided with a satisfactory arrangement for draining any watertight compartment. Forward electric submersible bilge pump found non - operational during inspection. Provide operational forward bilge pump. 46 CFR 182.500
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 May 2026
Resolution: fwd bilge pump renewed.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 15 May 2025 Resolved
A vessel must comply with the applicable requirements for any radio installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Provide copy of FCC Safety Radio certificate. 46 CFR 184.502
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2025
Resolved 4 June 2025
Resolution: FCC Radio Safety Cert renewed
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 May 2025 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2025
Resolved 4 June 2025
Resolution: New medical oxygen cylinder installed
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 1 May 2024 Resolved
A pre-engineered fixed gas fire extinguishing system must automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. Fireboy system does not shut down blower in engine compartment. Disconnect power from blower until deficiency rectified. Rectify within 30 days. 46 CFR 181.420(a)(3)
Action required: 705 - Other - as specified
Due 31 May 2024
Resolved 20 May 2024
Resolution: Blower wired up to Fireboy system shutdown.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 May 2023 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Generator prime mover has issue that will not allow generator to provide electrical current. Make generator prime mover operational as designed. 46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2023
Resolved 7 July 2023
Resolution: Generator fully operational.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 16 May 2023 Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Bilge pump indicator at operating station not existent. Provide visual indicator for automatic bilge pump at operating station. 46 CFR 182.530(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2023
Resolved 3 August 2023
Resolution: Visual indicator provided.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 25 May 2022 Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. EPIRB battery was expired. Replace with new battery or new EPIRB; restricted to operate within three miles from the coastline until rectified.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 27 May 2022
Resolution: Replaced with new EPIRB.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 25 May 2022 Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. Vessel only had a copy of the COD on board. Obtain original COD from the National Vessel Documentation Center and maintain on board.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 26 September 2022
Resolution: COD Provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 May 2022 Resolved
Each ring life buoy on a vessel must be approved in accordance with 160.050 in sub chapter Q. Ring life buoy's retro-reflective tape was worn and required replacement. Replace with new retro-reflective tape IAW regs.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2022
Resolved 27 May 2022
Resolution: Replaced with new retro-reflective tape.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 25 May 2022 Resolved
Life floats installation and condition on board vessels must meet approval under series 160.027. Retro-reflective tape required replacement and weak link was missing. Provide new retro-reflective tape and install new weak link.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2022
Resolved 27 May 2022
Resolution: Installed new weak link and retroreflective tape.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 25 May 2022 Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets. Letters and numbers must be at least 2 inches high. Marking was faded and inaccurate in forward cabin. Replace marking identification in forward cabin.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2022
Resolved 27 May 2022
Resolution: Replaced marking/placard identification in fwd/aft compartments.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 25 May 2022 Resolved
(02) sewage valves were missing lock. Secure both overboard sewage valves in accordance with regulations. (i.e. closing each valve leading to an overboard discharge and removing the handle; padlocking each valve leading to an overboard discharge in the closed position; or using a non-releasable wire-tie to hold each valve leading to an overboard discharge in the closed position).
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2022
Resolved 30 May 2022
Resolution: Overboard valves secured IAW regulations.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 May 2022 Resolved
An EAP training program must be conducted for the employer's crewmembers and supervisory personnel. The training program must include at least the following elements: the effects and consequences of drug and alcohol use on personal health, safety, and work environment; the manifestations and behavioral cues that may indicate drug and alcohol use and abuse; and documentation of training given to crewmembers and Supervisory personnel must receive at least 60 minutes of training. Provide proof of completed EAP training for all personnel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2022
Resolved 26 September 2022
Resolution: Drug training provided.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 25 May 2022 Resolved
Vessel COI authorizes carriage of 23 total passengers. Due to recent engine repower, vessel has experienced an aggregate weigh change of 1,605 lbs. Additionally, vessel has completed electrical rewiring overhaul of the entire vessel; MSC approval pends. Moreover, special consideration for stability pending w/Sec Hono OCMI. In the interim, vessel is required to maintain passenger decrease count by 9 passengers, limiting the total number of passengers to 14. Upon determination of special consideration, vessel may need to pursue Incline Stability test for approval.
Action required: 705 - Other - as specified
Resolved 14 July 2022
Resolution: OCMI determined stability test not required at this time. So special determination required or passenger reduction.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 May 2022 Resolved
The cognizant OCMI may perform operational tests to determine whether the vessel has adequate stability and satisfactory handling characteristics under sail for protected waters or partially protected waters. Vessel underwent re-power and is required to pass SST prior to carriage of passengers. 46 CFR 178.325(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 July 2022
Resolution: SST not required due to repower being less than 2% threshold.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 20 January 2022 Resolved
Currently, vessel is authorized to carry 23 total passengers. Due to recent engine repower, vessel has experienced an aggregate weight change of 1,605 lbs. Vessel has (01) outstanding deficiency requiring vessel to update DC and AC one line electrical drawing/plans for approval to MSC and complete installation prior to 25 May 2022. In the interim, vessel is required to decrease passenger count by 9 passengers, limiting the total number of passengers to 14. Upon completion of electrical deficiency, but NLT 25 May 2022, vessel must conduct a Simplified Stability Test iaw 46 CFR 178.330 to identify new maximum for total persons allowed onboard due to recent weight changes.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 25 May 2022
Resolution: Reissued at First Annual Inspection - see MISLE Activity #7463542
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 20 January 2022 Resolved
A pre-engineered fixed gas fire extinguishing system must be installed in accordance with the manufacturer's instructions. Fireboy system is missing appropriate YANMAR wire connection; FEDEX part delayed. Upon receipt, install part and prove satisfactory operational test of pre-engineered fixed gas fire extinguishing system.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 January 2022
Resolution: Vessel rep installed missing part; operational test sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 December 2021 Resolved
New batteries and battery charger installed. Also inverter installed with unapproved interlock. Numerous changes to electrical load, conductors, and circuit protection. Provide updated vessel DC and AC one line electrical drawings/plans for approval to MSC and complete installion prior to 25 May 2022. 46 CFR 177.202
Action required: 705 - Other - as specified
Due 25 May 2022
Resolved 13 December 2023
Resolution: Approval of plans and installation inspection completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 September 2021 Resolved
As a result of the equipment failure onboard the ISLAND STAR on September 5, 2021, the vessel's engine has been identified as inoperable. The vessel must identify the engine issue and make appropriate repairs to the satisfaction of the attending USCG marine inspector prior to passenger operations.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 September 2021
Resolution: The fuel lift pump failed and was replaced.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 May 2021 Resolved
Pre-engineered fixed fire fighting override not functioning as designed. Exhaust blower/fan also shuts down when circuit is opened but this blower/fan prevents main engine from starting in override. Both 1st and 2nd captains are aware of this situation and will open blower/fan breaker to allow for override. Make repairs to electrical circuit to ensure proper operation of pre-engineered fixed fire fighting system. 46 CFR 181.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 June 2021
Resolved 8 June 2021
Resolution: Pre-engineered system operational.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2021 Resolved
Numerous dead end wires throughout vessel. Remove dead end wire at navigation station, engine room, main electrical panel. 46 CFR 183.200
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 15 June 2021
Resolution: Dead end wires removed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2021 Resolved
02 permanent electronic devices plugged in. Make permanent installation and hard wire devices with proper circuit protection. 46 CFR 183.200
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 15 June 2021
Resolution: Permanent installation made.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2021 Resolved
Circuit breaker at the switchboard must be provided and must be interlocked with vessels power sources so that shore power and the vessels power sources may not be operated simultaneously. Inverter has unapproved interlock to ensure shore power and inverter not operational at same time. Provide approved interlock. 46 CFR 183.390
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 15 June 2021
Resolution: Inverter removed from system.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2021 Resolved
New batteries and battery charger installed. Also inverter installed with unapproved interlock. Numerous changes to electrical load, conductors, and circuit protection. Provide updated vessel DC and AC one line electrical drawings/plans for approval. 46 CFR 177.202
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 6 August 2021
Resolution: Updated Electrical Plan submitted to MSC for approval
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 25 May 2021 Resolved
Sewage overboard valve not locked. Provide lock for sewage overboard valve. 33 CFR 159.57
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 15 June 2021
Resolution: Sewage locked.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 25 May 2021 Resolved
Emergency exit marking missing on outside of hatch. Both sides of hatch must be marked. Provide marking on on exterior side of emergency escape hatches. 46 CFR 185.606
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 15 June 2021
Resolution: Emergency exits marked.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 May 2021 Resolved
Fuel fill hose missing ground wire from deck fill to tank. When flexible hose is non-conductor of electricity, the metallic sections of the fill pipe separated thereby must be joined by a conductor for protection against generation of a static charge while filling with fuel. Provide conductor from fill piece to tank. 46 CFR 182.445(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 15 June 2021
Resolution: Fuel fill grounded.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 May 2021 Resolved
Main engine leaking coolant. Temporary repair has been made. Make permanent repairs to coolant system to prevent leaking. 46 CFR 182.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2021
Resolved 15 June 2021
Resolution: New coolant reservoir installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 August 2020 Resolved
Shutdown solenoid on main engine was sticking preventing engine from starting without manual activation. Manual hand activation of rod required to start engine. Replace solenoid to make engine start as designed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 September 2020
Resolved 8 September 2020
Resolution: New solenoid installed. All sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 August 2020 Resolved
Company drug policy/statement and hot line not on board or posted on board vessel. Provide policy/statement and post hot line.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 September 2020
Resolution: Policy and hot line number posted on board.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 29 July 2019 Resolved
Sail area exceeds limit of 1056sqft per Stability Letter. Vessel is limited to 1056sqft of total sail. Provide correct sails or prove compliance of greater sail area in accordance with 46 CFR Part 178 and 177.330.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 October 2019
Resolved 8 October 2019
Resolution: New main provided at 367sqft. Jib is 689sqft for a total of 1056sqft.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 July 2019 Resolved
Sail and Rigging Preventative Maintenance Plan was unsatisfactory. Provide effective PMP in accordance with 46 CFR 176.840.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 August 2019
Resolved 8 October 2019
Resolution: Satisfactory Rigging Preventative Maintenance Plan provided.
Communications › Radio Communications › EPIRB
Issued 8 June 2016 Resolved
Vessel EPIRB Battery is expired.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2016
Resolution: Vessel purchased and installed a new one.
Lifesaving › Lifefloat › Retroreflective Material
Issued 8 June 2016 Resolved
Retro tape was worn beyond serviceable condition.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 June 2016
Resolution: Vessel replaced with new SOLAS tape.

Casualty record · 4

28 April 2006Routine · role: Involved in a Marine Casualty · activity 2652850
2 November 2010Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3896485
21 August 2012Routine · role: Involved in a Marine Casualty · activity 4421192
28 March 2015Routine · role: Involved in a Marine Casualty · activity 5094286
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.