Records from 2018 to 2025. Most recent: inspection, 15 September 2025.
Documentation record
Registered dimensions (L × B × D)38.3 ft × 13.6 ft × 8.1 ft
Registered tonnagegross 28 / net 22
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGENMAR YACHT GROUP LLC · PULASKI, WI, UNITED STATES · built 2007
Hull materialFRP (Fiberglass)
PropulsionDiesel Electric
Hull shapeShip
Hull configurationMonohull
Hailing portJUNEAU, AK
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 March 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it28 - Simplified, Gross Ton
22 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 17
15 September 2025
Annual Inspection · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8235127
23 December 2024
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8050452
19 September 2024
COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8005820
16 October 2023
Administrative Inspection · Hull Examination · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7809465
11 September 2023
Annual Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7787149
14 April 2023
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7668658
28 September 2022
Annual Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7567536
24 May 2022
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7459017
7 May 2022
Damage Survey · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7447854
21 April 2022
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7447777
22 October 2021
Annual Inspection · Drydock Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7337926
17 August 2020
Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7036389
2 March 2020
Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6919020
26 September 2019
Administrative Inspection · COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6822761
16 April 2019
COI Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6663210
3 October 2018
Drydock Exam · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6814069
27 September 2018
Simplified Stability Test
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6575534
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 September 2023
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines...The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. If the handle to the shutoff valve at the tank is located inside the machinery space, it must be located so that the operator does not have to reach more than 12 inches into the machinery space and the valve handle must be shielded from flames by the same material the hull is constructed of, or some noncombustible material. Generator fuel shutoff valve located at the fuel tank connection is not fitted with a remote shutoff. Prior to using the ship's generator, install remote pull-station outside the machinery space and test in the presence of a Coast Guard Marine Inspector.
Action required: 705 - Other - as specified
Resolved 25 September 2023
Resolution: Installed generator fuel shutoff valve outside the machinery space, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 September 2022
Resolved
A submersible electric bilge pump may be used as a power bilge pump only on a vessel of not more than 65 feet in length, carrying not more than 49 passengers provided that a positive shutoff valve is installed at the hull penetration. Forward bilge pump and forward bilge pump in the engine room do not have positive shut off valves at the skin of the vessel. Install prior to next operating season.
Action required: 705 - Other - as specified
Resolved 14 April 2023
Resolution: Shut off valves were installed.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 26 September 2019
Resolved
Vessel's Certificate of Documentation (COD) does not have a coastwise endorsement as required. Resubmit COD to the NVDC for Coastwise endorsement.
Action required: 705 - Other - as specified
Due 1 April 2020
Resolved 2 March 2020
Resolution: Vessel has Rcvd updated COD
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 26 September 2019
Resolved
Vessel's engine room remote fuel shut-off is not completely closing. Re-configure emergency fuel shut-off to completely secure fuel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 September 2019
Resolution: vessels crew adjusted fuel shut-off and tested all sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 16 April 2019
Resolved
Provide a valid Safety radiotelephony Certifcate - 47 CFR 80.401.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2019
Resolved 17 April 2019
Resolution: Received copy of signed certificate.