Records from 2011 to 2018. Most recent: operational control imposed, 30 October 2018.
Inspection history · 7
30 October 2018
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6571127
20 September 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6270930
7 September 2017
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6253958
20 May 2014
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4863757
19 June 2012
Ballast Water Examination · NPV Safety Exam · ISPS I Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4341997
18 June 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4341994
15 December 2011
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4204911
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 7 September 2017
Resolved
9900-Other (not hazardous)-After any ship survey under regs 7-10 has been completed, no change shall be made in the structural arrangemetns and other items covered by the survey, without sanction of the Administration. PSCO observed temporary sewage and gray water line running to aft peak tank not certified for sewage or gray water stowage. SOLAS 74 (14) I/11(b) 50a
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 7 October 2017
Resolved 20 September 2017
Resolution: Temporary lines(plastic hoses) were removed. Sound technical condition of sewage treatment plant and sewage/grey water piping was confirmed by the surveyor.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 7 September 2017
No resolution recorded
9900-Other-The operator of a vessel with 250+ barrel oil capacity, hazmat, or liquefied gas as regulated in Table 4 of 46 CFR 154 shall provide transfer procedures that meet the requirements of this part and part 156 of this chapter for transferring to or from a vessel. PSCO observed vessel did not have transfer procedures that meet requirements. Rectify prior to bunkering in US. 33 CFR 155.720 c
Condition: Invalid
Action required: 703 - Prior to bunkering operations
Documentation › Logs/Records › Declaration of Inspection
Issued 7 September 2017
Resolved
9900-Other (not hazardous)-No person in charge may sign the declaration of inspection(DOI) unless he or she has determined by inspection, and inicated by initialling in the appropriate space on the DOI form, that the facility or vessel meets 156.120. PSCO observed improperly filled out DOI's on 03Sep17 and 04Sep17. 33 CFR 156.150 10c.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 September 2017
Resolved 7 September 2017
Resolution: PSCO provided training to the Chief Engineer on proper completion of Declaration of Inspections for future transfers.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 20 May 2014
Resolved
On May 5, 2014, M/V VITAHORIZON transited through the Western Alaska Captain of the Port zone while enroute to or from a U.S. port without a valid Geographic Specific Appendix for Western Alaska in its non-tank vessel response plan.
Due 4 June 2014
Resolved 4 June 2014
Resolution: A letter of warning was issued to the operating company, VITA MANAGEMENT S.A.
Communications › Radio Communications › Satellite Communications Capability
Issued 15 December 2011
Resolved
1625 - INMARSAT - Every ship engaged on voyages beyond sea areas shall be equipped with an Inmarsat ship to earth station. PSCO observed the Inmarsat-C for the GMDSS radio installation was not functioning properly. Repair to the satisfaction of the certificate issuing authority by COB 16 DEC 11.
Action required: 705 - Other - as specified
Due 15 December 2011
Resolved 16 December 2011
Resolution: Received, reviewed and accepted class report from Nippon [name withheld] stating the deficiency was rectified. Technician tightened cable on #1 unit and updated software. Replaced antenna on #2 unit and updated software.