Records from 2010 to 2025. Most recent: inspection, 9 June 2025.
Inspection history · 14
9 June 2025
PSC B · COC-CHEM & TVE Annual
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8153582
17 May 2024
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7910806
16 May 2023
Administrative Inspection
Administrative · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 7689839
23 April 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7674144
18 January 2023
PSC B · COC-CHEM & TVE Annual
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7620588
5 January 2022
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7376244
28 November 2021
COC-CHEM & TVE Renew · PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7358024
8 June 2019
ISPS II Exam · COC-CHEM & TVE Renew · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6705677
31 May 2017
Ballast Water Examination · ISPS II Exam · COC-CHEM & TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6153399
30 August 2015
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5229756
19 January 2012
Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4227414
6 December 2011
COC-CHEM Renew · ISPS II Exam · Ballast Water Examination · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4202510
23 February 2011
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3952554
10 November 2010
Ballast Water Examination · COC-CHEM Annual · PII Safety Exam · ISPS II Exam
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3885833
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 June 2025
Resolved
The sowage space shall be cell-divided in order to avoid shifting of the bottles at sea. PSCO observed sample locker not cell divided.
74 SOLAS (20) VII/10.1
IBC 16.5.2.1
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 July 2025
Resolved 16 June 2025
Resolution: Vessel installed new cell divisions to fit all their samples.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 18 January 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The steam cuppling on the steam pipe that heats product has a steady water leak.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 February 2023
Resolved 23 April 2023
Resolution: RECIEVED FLAG STATE AND TECH DISPENSATION REGARDING DEFICIENCY, CLEARED VIA TEAM LEAD
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 8 June 2019
Resolved
While testing the Stbd/Rescue boat, the engine did not shut down, over-speeded, and caused excessive smoke. Extent of damage is unknown and engine is not safe to run until repairs are effected.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 11 June 2019
Resolved 11 June 2019
Resolution: Rescue boat engine governor was replaced, exhaust pipe was repaired and refitted, and the crank chamber of the engine was cleaned and refilled with new lube oil. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 8 June 2019
Resolved
3rd Officer indicated lifeboat engines are run for no more than one minute to avoid overheating (no cooling water source). Despite reduced testing, engine on Stbd LB still overheated. Ship's crew has no means to meet SOLAS testing requirement with current LR/cooling water arrangement.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 11 June 2019
Resolved 11 June 2019
Resolution: Cooling water arrangement installed. Crew in association with running of life/rescue boats were trained on the cooling water connection for testing engines.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 8 June 2019
Resolved
04 broken/missing bonding wires were found at the Stbd cargo manifold, 03 were found at the port manifold. Additionally, electrical bonding on the pressure/vacuum relief valve piping (IVO bow safe access catwalk) is intermittent. Vessel is not currently carrying flammable cargo, but is authorized to per the CoF.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 11 June 2019
Resolved 11 June 2019
Resolution: Electric bonding connections at the stbd and port cargo manifolds were connected. 66 electric bonding connections on the pressure/vacuum relief valve piping were connected. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 June 2019
Resolved
PSCO observed large accumulations of soot at ship's boiler access hatch indicating possible leak.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 11 June 2019
Resolved 11 June 2019
Resolution: Soot accumulation was cleaned up and boiler was inspected with no other findings.
Operations/Management › Cargo Transfer/Lightering › Vessel Transfer Procedures on Hand
Issued 7 December 2011
Resolved
1830; Vessel operators are required to have and follow cargo transfer procedures in accordance with 33CFR155.750. The vessel does not have cargo transfer procedures for cargo operations.
Action required: 705 - Other - as specified
Due 14 December 2011
Resolved 9 December 2011
Resolution: Received Transfer Procedures
Personnel › Training › Fire Fighting Basic
Issued 6 December 2011
Resolved
2020; The ship's crew failed to show proficiency during fire drill. Two attempted fire drills witnessed by inspectors were failed. Areas of failure included; failure to establish boundary cooling, safely enter space, properly don equipment, follow ship's SMS vol. 5, section 7 and 17, perform drills as if it were an emergency and failure to follow SOLAS T/M chapter 3 and Fire T/M section B.
Action required: 17 - Rectify deficiencies prior to departure
Due 7 December 2011
Resolved 7 December 2011
Resolution: Satisfactory conducted fire drill with crewmembers.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 6 December 2011
Resolved
0750; When fire boundaries are penetrated they must be suitably insulated to prevent the spread of fire. Doors and bulkheads throughout the ship have penetrations or are missing self closing devices.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 December 2011
Resolved 19 January 2012
Resolution: Corrected to the satisfaction of Class.
Lifesaving › Immersion Suits › General
Issued 6 December 2011
Resolved
0663; An immersion suit of an appropriate size shall be provided for every person on board the ship. 1st Engineer cannot fit into his immersion suit. One of appropriate size must be provided.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 December 2011
Resolved 19 January 2012
Resolution: Corrected to the satisfaction of Class.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 6 December 2011
Resolved
0330; Sewage treatment plant is not being maintained as per manufacturer’s requirements. Weekly, monthly and bi-yearly inspections are not being carried out and chlorine tablets are not the correct size.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 December 2011
Resolved 19 January 2012
Resolution: Corrected to the satisfaction of Class.
Fire Fighting › Fixed Deck Foam System › Main Control Station
Issued 6 December 2011
Resolved
0720; Fire fighting systems shall be kept in good working order and ready for immediate use. Instructions for operating foam system need to be ship specific.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 December 2011
Resolved 19 January 2012
Resolution: Corrected to the satisfaction of Class.
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 December 2011
Resolved
1400; The machinery and associated piping systems shall be of adequate design and construction. The shall be maintained for service for which they are intended. N2 salt water inlet and outlet piping on Heat Exchanger are patched.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 December 2011
Resolved 19 January 2012
Resolution: Corrected to the satisfaction of Class.
Documentation › Logs/Records › Garbage Recordkeeping
Issued 6 December 2011
Resolved
2120; Mixed garbage was found in various containers throughout the vessel. There are color coded posters that are in conflict with the G/P. The crew has failed to follow the garbage plan and it is believed that plastic was thrown overboard. In addition plastic covers are covering cleaning machines, radar systems and other items on deck. This plastic will start to fall apart and enter the sea.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 December 2011
Resolved 19 January 2012
Resolution: Corrected to the satisfaction of Class.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 6 December 2011
Resolved
2025; Crew failed first abandon ship drill. The pre-staged lifejackets and immersion suits prior to the Captain's announcement. Drills should be conducted as an emergency.
Action required: 705 - Other - as specified
Due 6 December 2011
Resolved 6 December 2011
Resolution: With the exception of the deck and engine room watch-standards we discussed with all crewmembers. The passed the second drill.