Records from 2019 to 2025. Most recent: inspection, 20 December 2025.
Inspection history · 8
20 December 2025
COC-CHEM & TVE Renew · PSC B
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8282371
7 May 2024
Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7907987
14 April 2024
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7891189
23 December 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7842027
20 September 2023
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7795318
13 January 2023
PSC B · COC-CHEM & TVE Renew
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7617071
20 February 2019
Ballast Water Examination · ISPS II Exam · COC-CHEM & TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6622366
11 February 2019
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6624035
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 14 April 2024
Resolved
After the survey of the ship of Annex I or Annex VI has been completed, no changes shall be made in the structure, equipment, systems, fitting, arrangement or material condition covered by the survey,without the sanction of the administration. PSCO noted that the incinerator was inoperable, where as the IOPP and IAPP states that the incinerator is operational and can process sludge.
MARPOL ANNEX I REG 6.4.2 & MARPOL Annex VI Reg 5.5
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 May 2024
Resolution: Incinerator removed from service by Class.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 20 September 2023
Resolved
The condition of the ship and it's equipment shall be maintained to conform with the provisions of the present reguations to ensure that the ship in all aspects will remain fit to proceed to sea without damage to the ship or persons onboard. After notification that your vessel experienced a collision, you vessel is restricted to AMA anchorage., Lower Mississippi river, above head of pass until your vessel meets the following and cleared by my office. A. a recongized classification society acting on behalf of Flag State must examine your vesssel and report satisfactory results. B. You must periodcally sound all tanks and potential water ingress and continue to do so until repairs are complete. C. A Coast Guard investigator must complete a casualty survey
Action required: 60 - Rectify deficiencies prior to movement
Due 21 September 2023
Resolved 20 September 2023
Resolution: Rcvd, reviewed and accepted BV class reported stating a comprehensive examination of the vessel's structure and hull were conducted with no evidence of damage resulting from the collision.
14 - Pollution Prevention › 142 - MARPOL Annex II › Other (MARPOL Annex II)
Issued 20 February 2019
Resolved
14299-Each cargo tank of a tankship must be equipped with an intrinsically safe high-level alarm and a tank overfill alarm. Vessel's port and starboard slop tanks contained 97.9 and 97.6% cargo. However, high-level alarm's were not activated. In addition No. 3 starboard's cargo capacity was 98.5% and high0level and overfill alarms were not activated. Provide documentation from certificate issuing authority attesting to the operation of HL/OF prior to loading cargos in the above tanks. 46CFR39.2001(a) ac
Action required: 705 - Other - as specified
Due 21 February 2019
Resolved 28 February 2019
Resolution: Received, reviewed and accepted class report from BV satisfying the requirement.
14 - Pollution Prevention › 142 - MARPOL Annex II › Other (MARPOL Annex II)
Issued 20 February 2019
Resolved
14299-A cargo tank on a tank vessel may not be filled with oil higher than 98.5% of the cargo tank volume or the level at which the overfill alarm required by 33 CFR 155.480 is set. PSCO observed cargo tanks 1-3 P/S filled to 98.3-98.5 percent by volume. Overfill device and company procedures state that cargo tanks should never be loaded above overfill alarm set point at 98%. Provide corrective action plan from company with concurrence from administration to prevent future occurrences. 33CFR155.775 16ac
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 March 2019
Resolved 28 February 2019
Resolution: Received, reviewed and accepted class report from BV satisfying the requirement.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 February 2019
Resolved
13199-The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ships or person on board. PSCO observed temporary PVC piping from seachest to expansion tank. SOLAS 74(a) 2014 (cons.) I-II/a 50a
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2019
Resolved 28 February 2019
Resolution: Received, reviewed and accepted class report from BV satisfying the requirement.
14 - Pollution Prevention › 142 - MARPOL Annex II › Other (MARPOL Annex II)
Issued 20 February 2019
Resolved
14299-The high-level and tank over-fill alarms must be identified in black letters on a white background. Rectify prior to loading cargos. 46CFR37.2007(c)(d)
Action required: 705 - Other - as specified
Due 21 February 2019
Resolved 28 February 2019
Resolution: Received, reviewed and accepted class report from BV satisfying the requirement.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 20 February 2019
Resolved
14199-Each vessel vapor connection flange face must have a permanent stud projecting outward that has 1.7 millimeter diameter and is at least 25.4 millimeters long. PSCO observed studs screwed in/not permanently fixed on all 4 vapor lines. Make correction and provide documentation prior to loading cargo that requires VCS. 46CFR2001(j) ac
Action required: 705 - Other - as specified
Due 21 February 2019
Resolved 28 February 2019
Resolution: Received, reviewed and accepted class report from BV satisfying the requirement.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 20 February 2019
Resolved
11104-Before the ship leaves port and at all times during the voyage, all lifesaving appliances shall be in working order and ready for immediate use. PSCO observed wasted hose clamp on rescue boat engine. SOLAS 74(a) 2014(cons.) III/20.2
Action required: 10 - Deficiency Rectified
Due 20 February 2019
Resolved 20 February 2019
Resolution: Corrected prior to departing the vessel