MAURY USCG vessel records Sign in
← All vessels

CLIPPER KAMOSHIO

CLIPPER KAMOSHIO is a 2009 freight ship. The Coast Guard has recorded 12 inspections since 2010, most recently in May 2019, along with 22 deficiencies and 5 operational controls.

Records from 2010 to 2019. Most recent: inspection, 22 May 2019.

Built
2009
Last inspected
22 May 2019
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9400899 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
1041773
Flag
PANAMA
—
Maury page id
psix-1041773

Inspections, by type

…with no type recorded4
Years with a record 6 calendar years (2010–2019)
The 12 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it20236 - Convention (Subpart B), Gross Ton
10947 - Convention (Subpart B), Net Ton
32226 - Dead Weight, Metric Ton
39678 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 12

22 May 2019 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6677982
15 January 2019 Deficiency Check · Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6610373
6 December 2017 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6313948
11 October 2015 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5740268
7 August 2014 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4946798
29 July 2012 ISPS III Exam · Ballast Water Examination · PI Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4393963
27 July 2012 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4392786
22 January 2012 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4225174
20 January 2012 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4225178
10 December 2010 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3902025
30 November 2010 PII Safety Exam · ISPS II Exam · Ballast Water Examination · COE-Offshore
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3900958
20 March 2010 Type not recorded
No type recorded · Maritime Safety & Security Team San Francisco (91105) · Activity 3699334

Deficiency record · 22

07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 22 January 2019 Resolved
Means shall be provided to control leaks of flammable liquids. Observed oil drain line wrapped with several rags. Rags were soaked through with oil and dripping into the provided bucket which was in contact with the main engine, representing a fire hazard. 74 SOLAS (14) II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 February 2019
Resolved 22 January 2019
Resolution: PSCO verified deficiency rectified.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 January 2019 Resolved
The machinery, boilers and other pressure vessels, associated piping system and fittings shall be of a design and construction adequate for the service for which they are intended. The design shall have regard to materials used in construction, the purpose for which the equipment is intended, and conditions on board. A temporary repair consisting of a rubber patch was observed on the discharge side of the fire/general service pump. The repair leaked significantly when the system was pressurized. The Responsible Organization did not authorize the repair. - 74SOLAS(04) II-1/26.1 30ABC
Action required: 30 - Ship detained
Due 15 January 2019
Resolved 22 January 2019
Resolution: See attached Class report.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 15 January 2019 Resolved
Fire-extinguishing appliances shall be readily available. All three fire pumps have a manual valve closed on the suction side making remote starting and immediate water delivery unavailable. - 74SOLAS(14) II-2/10.1.1.2 30ABC
Action required: 30 - Ship detained
Due 15 January 2019
Resolved 22 January 2019
Resolution: See attached Class report.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 15 January 2019 Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following shall be met: means shall be provided to control leaks of flammable liquids. Observed excessive oil leaks on the fuel oil and lube oil purifying units and associated piping. Crew attempted to reduce these leaks using rags that were hidden by cardboard which had been painted to match the purifiers and associated piping. Additional significant oil leaks were found on the main engine and emergency generator. - 74SOLAS (14) II-2/4.1.1 30ABC
Action required: 30 - Ship detained
Due 15 January 2019
Resolved 22 January 2019
Resolution: See attached Class report.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 15 January 2019 Resolved
The company should establish procedures to ensure that the ship is maintained in accordance with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. In meeting these requirements, the company should ensure that: any non-conformity is reported, with its possible causes, if known; and ensure appropriate corrective action is taken. An unauthorized temporary repair was made to the discharge side of the fire and general service pump and was not reported to the Responsible Organization. Excessive oil leaks were observed on the oil purifier pumps and on the emergency generator, representing a significant fire hazard. Cardboard was painted and placed on the piping and oil purifier pumps which concealed rags and leaks. The crew made unsatisfactory repairs to the oily water supply piping that were not reported to the Responsible Organization. Operational-related deficiencies collectively provide objective evidence of a serious failure, or lack of effectiveness, of the implementation of the ISM Code. No evidence of required reporting to the designated person was observed. An external audit is recommended to be conducted within 30 days by the flag state or RO to determine whether the ship is operating in accordance with the ISM Code. Provide decision to USCG prior to departing port. - 74SOLAS(14) IX/3.1 & ISM Code Part A 10 30ABC
Action required: 30 - Ship detained
Due 15 January 2019
Resolved 22 January 2019
Resolution: See attached Class report.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 15 January 2019 Resolved
Any ship of 10,000 gross tonnage and above shall be fitted with oil filtering equipment complying with paragraph 7 of this regulation. PSCO observed excessive leaks on the oily water supply piping. - MARPOL 1/14.2 17AC
Action required: 15 - Rectify deficiencies by next port
Due 15 January 2019
Resolved 25 January 2019
Resolution: Resolved per attached class report.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 15 January 2019 Resolved
Every steam pipe and fitting connected thereto shall be so designed, constructed, and installed as to withstand the maximum stresses to which it may be subject. PSCO observed three steam leaks coming from piping near the main boiler that pose a significant hazard to personnel. - 74SOLAS(04) II-1/33.1 17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 15 January 2019
Resolved 22 January 2019
Resolution: See attached Class report.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 15 January 2019 Resolved
Each incinerator shall be approved by the administration taking into account standard specifications for shipboard incinerators. An interlock should be installed to prevent the charging door from opening while the incinerator is in operation. PSCO observed the interlock on the door inoperable allowing access to inside the incinerator during operation. The incinerator cannot be operated until the condition is rectified. - MARPOL VI/16.6.1 17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 15 January 2019
Resolved 22 January 2019
Resolution: See attached Class report.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 15 January 2019 Resolved
All shell fittings and valves required by this regulation shall be of steel, bronze, or other approved ductile material. All pipes to which this regulation refers shall be of steel or other equivalent material to the satisfaction of the administration. Extensive temporary repairs found on the sewage system at the treatment tank and air conditioning system in the air conditioning space and in the associated piping to the galley were not made of steel or equivalent material. - ICLL I/22.6 50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 February 2019
Resolved 22 January 2019
Resolution: See attached Class report.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 15 January 2019 Resolved
Any failure of the oil filtering equipment shall be recorded in the Oil Record Book Part I. The engineers told PSCO’s that the Oily Water Separator was taken out of service to conduct repair of piping. This was not logged in the Oil Record Book. - MARPOL I/17.5 10C
Action required: 10 - Deficiency Rectified
Due 15 January 2019
Resolved 15 January 2019
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 6 December 2017 Resolved
1499–Other (Prop. & Aux. Machinery)- Means shall be provided to control leaks of flammable liquids. PSCO observed active FO leaks: IWO relief valve on SSGs FO delivery line, and mechanical seal failure IWO main engine FO circulation pump. 74 SOLAS(09) II-2/4.1.1 60a
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 December 2017
Resolution: Received class report documentation from NKK stating deficiency has been rectified. The class report stated: Relief valve on SSGs delivery line was overhauled and flange connection on main engine circulation pump re-tightened. SSGs delivery line and main
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 6 December 2017 Resolved
1730-Oily-water separating equipment-Oil filtering equipment referred to in paragraph 2 of this regulation shall comply with paragraph 6 of this regulation. PSCO observed the crew for approximately 20 minutes were unable to run the ships oily water separator, and oil content monitor is missing tamper proof seal. Further investigation found 3-way valve frozen in the closed position. MARPOL I/14.7 40a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 12 December 2017
Resolution: Received class report documentation from NKK stating deficiency has been rectified. The class report stated: 3-way valve was overhauled; separator tested and confirmed SAT operations, tamper proof seal in place.
Fire Fighting › Automatic Sprinkler System › Testing Switches (Alarm/Sprinklers)
Issued 6 December 2017 Resolved
1099- Other (alarm-signals)-The condition of the ship and its equipment shall be maintained after survey to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed INOP low water alarm to fresh water tank servicing hyper mist system. 74 SOLAS(14) I/11a 40a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 12 December 2017
Resolution: Received class report documentation from NKK stating deficiency has been rectified. The class report stated: low water alarm to fresh water tank sensor was repaired, tested and confirm operable.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 6 December 2017 Resolved
0899- Other (accid. prevent.)- Steering gear compartments shall be provided with suitable arrangements to ensure working access to steering gear machinery and controls. These arrangements shall include handrails and gratings or other nonslip surfaces to ensure suitable working conditions in the event of hydraulic fluid leakage. PSCO observed no non-slip surface exists between the access point and the control station. 74SOLAS (09) II-1/29.13.2 50a
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 5 January 2018
Resolved 12 December 2017
Resolution: Received class report documentation from NKK stating deficiency has been rectified. The class report stated: Suitable non-slip surface has been provided in steering gear compartment between the access point and the control station.
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 29 July 2012 Resolved
2525-Masters responsibility and authority-The U.S. Coast Guard was notified, Friday, July 27, 2012, that the master and chief officer were found intoxicated with a blood alcohol content in excess of .04. This is a violation of U.S. law 33 CFR 95 and the company's alcohol policy posted throughout the ship. Provide corrective action plan from company with concurrence from the Administration.-SOLAS
Action required: 705 - Other - as specified
Due 29 July 2012
Resolved 30 July 2012
Resolution: [withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 29 July 2012 Resolved
2555- Documentation- Vessel's crew was unable to produce chapters 11 thru 15 of the Safety Management System Manual for review by the Port State Control Officer. Provide corrective action plan from company with concurrence from the Recognized Organization. -SOLAS 74 (2009 Con. Ed.) IX/5
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 29 July 2012
Resolved 7 August 2014
Resolution: Flag administration carried out full audit of Shipboard Safety Management System.
Navigation › Piloting/Steering › Marine Charts
Issued 22 January 2012 Resolved
1560-Charts-Nautical charts and pubs shall be adequate and up to date. The ship does not have on board chart #'s 3857, 3382 or 3385 for the Mississippi River as required by the Safety Equip Cert. Also, its version of the U.S. Light List is out of date by two years. The ship's ECDIS is also 13 weeks out of date and is not provided with a suitable backup arrangement.-SOLAS 09 cons. V/27 & V/19
Action required: 705 - Other - as specified
Due 22 January 2012
Resolved 30 January 2012
Resolution: Received, reviewed and accepted class report from NKK stating that the surveyor verified that the Company supplied all related charts and publications.
Personnel › Training › Familiarization Training
Issued 22 January 2012 Resolved
2199-Other (MARPOL operational def)-MEPC 107(49) states "ship staff training should include familiarization in the operation and maintenance of the equipment." The Engineering Dept. was unaware that the OCM recorded the start and stop time of the OWS and didn't know how to recall info from the OCM. See narrative for additional details.-MARPOL I/11 & MEPC 107(49)
Action required: 705 - Other - as specified
Due 22 January 2012
Resolved 30 January 2012
Resolution: Received, reviewed and accepted class report from NKK and technician''s report stating that the surveyor verified that the crew was trained in and demonstrated working knowledge of the OWS system.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 22 January 2012 Resolved
1730-OWS-The OCM should be constructed that the alarm is always activated whenever clean water is used for cleaning or zeroing purposes. It was observed by the PSCO and confirmed by the 1/E that the OCM will function and continue to operate without alarming with both the line sample line and fresh water flushing line open. See narrative for details.-MARPOL 06 cons. Annex I/14
Action required: 705 - Other - as specified
Due 22 January 2012
Resolved 30 January 2012
Resolution: Received, reviewed and accepted class report from NKK and technician''s report stating that the surveyor verified that the system is fitted with internal solenoids that allow for this arrangement even though it does not meet type approval.
Documentation › Logs/Records › Oil Record Book
Issued 22 January 2012 Resolved
1710-ORB-The ORB shall be completed on each occasion whenever any of the following occurs: collection of oil residues, discharge overboard of bilge water. PSCO noted several discrepancies in the ORB. On 15OCT11, it was recorded the OWS discharged 10mc of bilge water in 3.083hrs; about 1.3mc/hr more than its max throughput of 2mc/hr. See narrative for details.-MARPOL 06 cons. Annex I/17
Action required: 705 - Other - as specified
Due 22 January 2012
Resolved 30 January 2012
Resolution: Received, reviewed and accepted class report from NKK and technician''s report stating that the surveyor verified that the crew was trained in and demonstrated working knowledge of the ORB entries.
Personnel › Training › Familiarization Training
Issued 22 January 2012 Resolved
0299-Crew(other)-Each Administration shall require every Company to ensure that seafarers, on being assigned to any of its ships, are familiarized with their specific duties. The SSO couldn't provide any records that the crew had been familiarized with their security duties.-STCW 2011 ed. reg. I/14
Action required: 705 - Other - as specified
Due 22 January 2012
Resolved 30 January 2012
Resolution: Received, reviewed and accepted class report from NKK and Company CAP stating that the surveyor verified that the crew was trained and familiarized in security duties.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 22 January 2012 Resolved
9900-Other(not clearly hazardous)-Each bunker line transfer pipe must be tested annually and not leak under static liquid pressure at least 1.5 times the MAWP. Vessel conducted annual test, however used air as the medium.-33CFR155.820
Action required: 703 - Prior to bunkering operations
Due 22 January 2012
Resolved 20 March 2012
Resolution: Received, reviewed and accepted report from vessel and corrective action plan from company stating bunker line pressure test was completed and would be done annually in the future to meet 33 CFR 155.820.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.