Inspection history · 26
30 July 2026
Administrative Inspection · Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8450242
9 July 2025
Annual Inspection
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 8179137
3 July 2024
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7938543
27 March 2024
Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7885827
6 March 2024
Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7875097
23 June 2023
MARPOL Annex I Examination · Construction Oversight · COI Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7781142
14 March 2023
Periodic Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7648142
5 October 2022
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7572295
3 March 2022
Internal Structural Exam · Annual Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7401446
13 July 2021
MARPOL Annex I Examination · Examination of Repairs · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7247931
6 January 2021
Special
Type not classified · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7124205
20 July 2020
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7011206
13 April 2020
COI Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6936397
24 March 2020
Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6931031
11 March 2019
Annual Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6635959
27 July 2018
Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6489750
1 March 2018
MARPOL Annex I Examination · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6360116
11 April 2017
Internal Structural Exam · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6118845
5 May 2016
MTSA Verification · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5870938
11 February 2016
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5813454
6 February 2015
Drydock Exam · Internal Structural Exam · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5065196
29 April 2014
Annual Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4842195
9 July 2013
Annual Inspection · Administrative Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 4623506
24 August 2012
Internal Structural Exam · Annual Inspection · Deficiency Check · MARPOL Annex I Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 4417529
3 August 2011
MARPOL Annex I Examination · Annual Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 4078506
14 June 2010
COI Inspection · Initial Construction-Excluding Oversight · MARPOL Annex I Examination
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3732710
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 3 July 2024
Resolved
No person may transfer a product to or from a vessel unless there is a container or enclosed deck area under or around each transfer connection area. Barge is equipped with a large portable generator with a 748 gallon fuel tank. There is no discharge containment around fuel tank.
46 CFR 98.30-17(a)
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 19 July 2024
Resolution: Photographic evidence of installed containment and new plans provided.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 3 July 2024
Resolved
At each inspection for certification, periodic inspection and at other times necessary, the inspector will determine that all fire-extinguishing equipment is in suitable condition. Fire extinguishers were not on-board at time of inspection.
46 CFR 91.25-20(a)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 July 2024
Resolved 19 July 2024
Resolution: Photographic evidence of installed fire extinguishers and receipt of purchase provided.
01 - Certificates & Documentation › 012 - Crew Certificates › Cert for personnel on survival craft & rescue boat
Issued 3 July 2024
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 705 - Other - as specified
Resolved 19 July 2024
Resolution: Received photographic evidence of MMCs with lifeboatman endorsement and PIC Barge endorsement.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 6 March 2024
Resolved
Gauge lowest 12" of aft watertight bulkhead and bottom plate from aft bulkhead to first transverse frame in the port fwd rake prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 16 April 2024
Resolution: ABS reinspected welds with no deficiences noted.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 6 March 2024
Resolved
Clean and reinspect welds on 4 lowermost brackets at aft outboard corner. Marked 1-4. in port fwd rake prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 16 April 2024
Resolution: ABS reinspected welds with no deficiencies noted.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 6 March 2024
Resolved
Repair first transverse frame aft of bow, 2nd bay to port side of centerline bulkhead in center fwd rake prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 16 April 2024
Resolution: Inspected weld with no deficiencies noted.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 6 March 2024
Resolved
Clean and reexamine welds as marked at forward outboard corner in starboard fwd rake prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 16 April 2024
Resolution: Inspected weld with no deficiencies noted.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 6 March 2024
Resolved
Aft outboard corner: repair marked longtitudinal frame and bracket in starboard fwd rake prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 16 April 2024
Resolution: Inspected with no deficiences noted.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 6 March 2024
Resolved
Crop and renew side shell longitudinals # 7 & 8 as marked in #1 starboard prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 16 April 2024
Resolution: Inspected weld with no deficiencies noted.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 6 March 2024
Resolved
Crop and renew tripped bracket and side shell longtitudinal as marked Bay 1 in #4 port prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 16 April 2024
Resolution: Inspected weld with no deficiencies noted.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 6 March 2024
Resolved
Crop and renew 2 top ladder rungs on aft ladder and top rung on fwd ladder in #6 starboard prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 16 April 2024
Resolution: Inspected weld with no deficiences noted.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 6 March 2024
Resolved
Crop and renew side shell longtitudinals # 2 & 3 as marked at bay 5 in the port aft rake prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 16 April 2024
Resolution: Inspected weld with no deficiencies noted.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 6 March 2024
Resolved
Gauge vertical stiffener as marked at bay 7 in port aft rake prior to next credit drydock.
Action required: 705 - Other - as specified
Resolved 16 April 2024
Resolution: Inspected weld with no deficiencies noted.
Construction/Loadline › Hull › Hull Plating
Issued 6 February 2015
Resolved
Repair inset in #5P Void approximately 3x7ft at frame #42. Repairs must be completed prior to vessel transiting outside the boundary line and Treaty waters as defined in 46 CFR 7.145 and 42.03-35 respectively. Repairs must be made to the satisfaction of Class or Coast Guard. If completed by class, send copy of report to Coast Guard. 46CFR 92.01-10
Action required: 705 - Other - as specified
Resolved 16 March 2015
Resolution: Received ABS class report documenting satisfactory repairs at frame #42
Construction/Loadline › Hull › Transverse Frame
Issued 24 August 2012
Resolved
Ballast Tank #5 Center: Provide temp repairs to deep frames 32 and 33 port side of C/L bulkhead using plan previously approved by ABS. Damaged frames must be renewed to original condition at the next dry dock inspection.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 12 September 2012
Resolution: Attended vessel at Keppel Tuas Shipyard in Singapore for inspection of repairs. All repairs were satisfactory to the attending marine inspector.
Construction/Loadline › Hull › Transverse Frame
Issued 24 August 2012
Resolved
Ballast Tank #4 Stbd: Provide temp repairs to deep frames on frames 28 and 29, using plan previously approved by ABS. Damaged frames must be renewed to original condition at the next dry dock inspection.
Action required: 705 - Other - as specified
Resolved 12 September 2012
Resolution: Attended vessel at Keppel Tuas Shipyard in Singapore for inspection of repairs. All repairs were satisfactory to the attending marine inspector.
Construction/Loadline › Hull › Side Shell
Issued 24 August 2012
Resolved
Tanks #1 Port and Center: Renew damaged water tight bulkhead and head log plating to original scantlings. This repair may be deferred until the next drydock only upon agreement from ABS surveyor that the extent of the damage is permissible with class rules to be deferred.
Action required: 705 - Other - as specified
Resolved 12 September 2012
Resolution: Attended vessel at Keppel Tuas Shipyard in Singapore for inspection of repairs. All repairs were satisfactory to the attending marine inspector.