Records from 2009 to 2024. Most recent: inspection, 29 October 2024.
Inspection history · 13
29 October 2024
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8024683
26 October 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8024987
26 October 2024
COE-Administrative
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8024996
3 February 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6901465
11 July 2019
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6745636
19 July 2011
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4087573
17 July 2011
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4084357
13 July 2011
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4071558
12 July 2011
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4071563
4 January 2010
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3658672
4 January 2010
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3845558
3 January 2010
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3658657
2 December 2009
Ballast Water Examination · MARPOL Annex I Examination · ISPS II Exam · MARPOL Annex VI Survey · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3640144
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 13 July 2011
Resolved
0899 - Other (Accident Prevention) - Each transfer pipe shall be hydrostatically tested annually to 1.5 times MAWP. Vessel could not provide proof of hydrostatic test to 1.5 times MAWP. Provide documentation prior to transfer in US. - 33 CFR 156.170
Action required: 703 - Prior to bunkering operations
Resolved 17 July 2011
Resolution: Vessel submitted documentation attesting to hydrostatic testing.
Operations/Management › Pollution › Control of Discharge of Oil
Issued 13 July 2011
Resolved
1740 - Oil Discharge Mon/contr system, Masters & crew shall be familiar with essential shipboard procedures relating to the prevention of pollution by oil. This was written taking into account the guidance in MEPC 107(49), Engineering crew could not demonstrate the ability to recover Oil Content Meter logged data. Provide corrective action plan from company with concurrence from Admin. MARPOL 1-11
Due 27 July 2011
Resolved 19 July 2011
Resolution: Received proper documentation satisfying the requirement.
Construction/Loadline › Hull › Hull Plating
Issued 4 January 2010
Resolved
Vessel was involved in an allision with a barge while on the Mississippi river, which resulted in hull damage to the starboard strakes.
Action required: 17 - Rectify deficiencies prior to departure
Due 4 January 2010
Resolved 4 January 2010
Resolution: Received, reviewed, and accepted class report from Nippon [name withheld] stating the deficiency was rectified. The report stated that no fractures were observed and permanent repairs to made no later than next dry docking.