Records from 2016 to 2021. Most recent: inspection, 18 May 2021.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 May 2021
Resolved
Electrical or other equipment which may constitute a source of ignition of flammable vapours shall not be permitted in these compartments. PSCO observed 02 explosion proof lights in the on-deck N2/SMPEP locker with cracked casings.
74 SOLAS (04) II-1/9.2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 June 2021
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 18 May 2021
Resolved
Means shall be provided for measuring the cargo temperature. The temperature sensor for C.O.T 7P is fluctuating and not functioning as intended to ensure an accurated temperature read-out.
74 SOLAS(20) VII/10.1 IBC 7.1.5
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 June 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 18 May 2021
Resolved
Oil residue (sludge) may be disposed of by other acceptable means which shall be annotated in item 3.2 of the sumpplement to IOPP Certificate form B. PSCO observed multiple entries in the ORB for evaporation from oil residue tanks. Evaporation is not listed as an other acceptable means on the supplement to IOPP Certificate form B.
Marpol I/12.2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 June 2021
Lifesaving › Lifeboat › Hull
Issued 21 April 2016
Resolved
Before the ship leaves the port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. The port side lifeboat has damage on its bow, breaching the fiber glass.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 21 April 2016
Resolved 21 April 2016
Resolution: Received Class letter & technician letter attesting to proper repairs of the damage on the bow of the lifeboat. USCG MSU Lake Charles personnel also attended the vessel & inspected the reparied damage to the lifeboat. Class & technicain report attached.
Lifesaving › Launching Appliances › Davit
Issued 20 April 2016
Resolved
Each survival craft shall be stowed: in a state of continuous readiness so that two crew members can carry out preparations for embarkation and launching in less than 5 min. The port side lifeboat is stuck out of its stowed position, and cannot be lowered for launching, or raised for stowage. 74 SOLAS (2009 CONS.) CH. III, Reg. 13.1.3
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 April 2016
Resolution: Received Class letter & technician letter attesting to proper repairs & operation of the lifeboat davit. USCG MSU Lake Charles personnel attended the vessel, inspected the reparied davit, & witnessed proper operation. Class & technicain report attached.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 20 April 2016
Resolved
The last 1.0 meter of the vapor hose must be - Painted in the sequence of red/yellow/red. The width of the red bands must be0.1 meter and the width of the middle yellow band must be 0.8 meter. The red/yellow/red painting does not meet the appropriate measurements. 46CFR39.2001(h)(1)
Condition: Design Flaw
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 15 June 2016
Resolved 15 June 2016
Resolution: Vessel vapor lines have been repainted to meet stated requirements.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 20 April 2016
Resolved
Efficient guard rails shall be fitted to all exposed parts of the freeboard and superstructure decks. Middle rail, by #1 port ballast tank, is wasted. ICLL II/25(2)
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 21 April 2016
Resolution: Class observation was issued for crew to repair the guard rails, due 21JUN2016.