Records from 2016 to 2026. Most recent: inspection, 17 June 2026.
Documentation record
Registered dimensions (L × B × D)36.0 ft × 13.9 ft × 6.9 ft
Registered tonnagegross 9 / net 8
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSAILTECH DESIGN INC · ST PETERSBURG, FL, UNITED STATES · built 2002
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeSail (Distinct Keel)
Hull configurationTwin Hull
Hailing portCHARLESTON, SC
Trade endorsementsCoastwise, unrestricted, Recreational
DocumentationCase Pending · issued 9 September 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it8 - Simplified, Net Ton
9 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 14
17 June 2026
Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8407008
17 October 2025
Drydock Exam · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8254130
5 May 2025
Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8129088
16 April 2024
COI Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7891947
28 February 2024
Deadweight Survey
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7871733
21 September 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7796077
25 October 2021
Plan Review "T" Boat
Administrative · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7339145
9 August 2021
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7281835
21 June 2021
Internal Structural Exam · Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7227382
13 May 2020
COI Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6952663
3 January 2020
Drydock Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6882208
11 September 2019
Administrative Inspection · Initial Certification · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6809670
10 April 2017
Re-Inspection · Plan Review "T" Boat · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6121645
7 April 2016
Internal Structural Exam · Drydock Exam · Administrative Inspection · Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5849127
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 17 June 2026
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 July 2026
Resolved 5 August 2026
Resolution: Received Photo of new first aid.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 June 2026
Resolved
The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. Generator Fuel shut off valve did not close with pull station.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2026
Resolved 5 August 2026
Resolution: Received attestation of repair from [name withheld].
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 May 2025
Resolved
Flexible nonmetallic hose must be complete with factory-assembled end fittings requiring no further adjustment of the fittings on the hose, or field attachable type fittings may be used. Hose end fittings must comply with SAE J-1475
Vessel fuel tanks have flexible nonmetallic hoses installed without factory assembled end fittings. Lengths of flexible hoses exceed 30 inches. Correct at next drydock.
Action required: 705 - Other - as specified
Due 17 October 2025
Resolved 17 October 2025
Resolution: Vessel fuel tank flexible nonmetallic hose end fittings replaced and IAW SAE-J-1475.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 May 2025
Resolved
Ring life buoy must be marked with Type II retroreflective material approved in accordance with 46 CFR 164.018 or other standard specified by the Commandant.
Ring life buoy has no retroreflective material applied.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 May 2025
Resolved 14 May 2025
Resolution: Vessel replaced with new life buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 5 May 2025
Resolved
Three hand orange smoke distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant. Vessel only has 02 hand orange smoke distress signals on board.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 May 2025
Resolved 14 May 2025
Resolution: O/O replaced distress signals with new ones.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 May 2025
Resolved
Each floating waterlight must be approved in accordance with § 161.010 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.110.
Waterlight must have Energizer L91 batteries installed as per manufacturer's specifications.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 May 2025
Resolved 14 May 2025
Resolution: O/O replaced batteries with Energizer L91 batteries
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 5 May 2025
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 May 2025
Resolved 20 May 2025
Resolution: O/O printed out updated nautical publications to place on board.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 21 June 2021
Resolved
Fire hazards to be minimized. The general construction of the vessel must be such as to minimize fire hazards in-sofar as it is reasonable and practicable. Port aft lagging and fire resistant material was not properly secured in place.
46 CFR 177.405(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2021
Resolved 2 July 2021
Resolution: O/O sent photo of proper installation of port aft insulation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 21 June 2021
Resolved
Gauges to indicate engine revolutions per minute... must be provided for all propulsion engines installed in the vessel. Port main engine RPM gauge was found not functioning.
46 CFR 182.410(b)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 July 2021
Resolved 2 July 2021
Resolution: Received photo of repaired RPM gauge from O/O.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 13 May 2020
Resolved
A vessel on an LBS and rivers route must carry three hand red flare distress signals and three hand orange smoke distress signals approved in accordance with §160.037 in subchapter Q of this chapter, or other standard specified by the Commandant. No flares were onboard.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 July 2020
Resolution: Verified proper quantity of flares (3 red and 3 orange) carried on board as well as proper stowage location.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 13 May 2020
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. No first aid kit was onboard.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 July 2020
Resolution: Verified vessel's first aid kit to ensure that it was readily accessible, carried adequate supplies, and was properly stowed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 May 2020
Resolved
On a vessel of at least 26 feet (7.9 meters) in length, a visual and audible alarm must be provided at the operating station to indicate a highwater level in each of the following unmanned spaces: (1) A space with a through-hull fitting below the deepest load waterline. The port aft visible bilge alarm is inoperable.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 July 2020
Resolution: Verified that bilge alarm for the port aft space actuated a visible and audible alarm at the operating station.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 May 2020
Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 9.5 liter (2 1/2 gallon) buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words “FIRE BUCKET” must be stenciled in a contrasting color on each bucket. No fire buckets were onboard.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 July 2020
Resolution: Verified that vessel carried 3 2.5 gallon fire buckets with lanyards. Buckets were labeled and stored in a proper location.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 13 May 2020
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferable from an accessible position on the weather deck. Shutoff valves in the tank space were not manually operable from outside the compartment.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 July 2020
Resolution: Operator installed 2 new pull cords for the fuel shutoffs, which are labeled and located at the operating station. Verified that they worked properly.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 13 May 2020
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devises must be readily available and mounted in
the vicinity of the vent. Vent closures were missing.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 July 2020
Resolution: Vessel installed vent closures for the engine room vents which are removable. They are stored in a labeled location in the aft section of the boat.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 13 May 2020
Resolved
A vessel must comply with the applicable requirements for any radio and EPIRB installations, including the requirements for a station license and installation certificates to be issued by the FCC, as set forth in 47 CFR part 80. FCC documentation was missing.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 July 2020
Resolution: Operator obtained a new FCC radio certificate. Verified its validity. The call sign was changed and a COI amendment was routed to reflect the change.