JBU SAPPHIRE is a 2009 tank ship. The Coast Guard has recorded 21 inspections since 2016, most recently in January 2025, along with 8 deficiencies and 4 operational controls, 1 with no removal date recorded.
Records from 2016 to 2025. Most recent: inspection, 3 January 2025.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
The counts in the strip above are the same counts; this table splits the inspections by
the kind of activity recorded. A blank resolution means none was recorded in this data; it
does not establish that a deficiency is outstanding. Years with a record are calendar
years in which a record exists, not years in service.
What Maury does not do.
Documentation record
Tonnage as PSIX records it6115 - Convention (Subpart B), Net Ton 11561 - Convention (Subpart B), Gross Ton 19860 - Dead Weight, Metric Ton 25013 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
What it gives that this page does not: the whole record in one
dated, citable document — every line with its Coast Guard activity id, the retrieval
date on the cover, built to print to PDF with its page breaks — that a surveyor can
attach and a lender can file. The same facts as this page, complete and in one file.
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
A request, not a checkout: leave an email and Maury replies once, with
the dated document for this hull and a Stripe invoice for $299. Nothing is charged before
the document is in your hands.
Used only to answer this request.
Not shared, not sold, and not added to a mailing list.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 24 December 2024Resolved
THE PURPOSE OF THIS REGULATION IS TO SUPPRESS AND SWIFTLY EXTINGUISH A FIRE IN THE SPACE OF ORIGIN, EXCEPT FOR THE PARAGRAPH 1.2. FOR THIS PURPOSE THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET: FIRE EXTINGUISHING APPLIANCES SHALL BE READILY AVAILABLE. #6 FIRE MAIN HAS HOLE WITH A TEMPORARY PATCH STILL LEAKING.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 January 2025
Resolved 3 January 2025
Resolution: CLASS SENT SURVEY REPORT ATTESTING TO THE REPAIR OF THE FIRE MAIN.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 10 September 2023Resolved
A chemical tanker shall comply with the requirements of the International Bulk Chemical Code. Where column o in the table of chapter 17 refers to this section, water shall not be allowed to contaminate this cargo. In addition, the following provisions apply: [.3] The cargo shall not be carried in cargo tanks adjacent to permanent ballast or water tanks unless the tanks are empty and dry.
PSCO Observed 252 cubic meters of ballast water loaded in #6 port Water Ballast Tank (WBT) which was adjacent to the #7 Port Cargo Tank which was carrying sulfuric acid.
74 SOLAS (20) VII/10.1 IBC 15.16.2.3
30abc
Action required: 30 - Ship detained
Due 10 September 2023
Resolved 10 September 2023
Resolution: PSCO observed the vessel's crew discharge the entire contents of the #6 port Water Ballast Tank (WBT).
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 September 2023Resolved
A chemical tanker shall comply with the requirements of the International Bulk Chemical Code. The arrangements for providing foam shall be capable of delivering foam to the entire cargo tanks deck area as well as into any cargo tank, the deck of which is assumed to be ruptured.
PSCO Observed inadequate firefighting cargo deck area coverage from foam monitors. Monitors provided less than 50% coverage of the cargo tanks deck area in the vicinity of the starboard cargo manifold and Cargo Tank #3, thus limiting the ship's firefighting capability
74 SOLAS 20 VII/10.1 IBC 11.3.3
30abc
Action required: 30 - Ship detained
Due 10 September 2023
Resolved 11 September 2023
Resolution: PSCO observed adequate water pressure from 02 foam monitors on the starboard side cargo tank deck area.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 10 September 2023Resolved
The company and the ship shall comply with the requirements of the International Safety Management Code. [6.4] The company should ensure that all personnel involved in the company's safety management system have an adequate understanding of the relevant rules, regulations, codes and guidelines.
PSCO observed a loaded ballast water tank adjacent to cargo tank containing sulfuric acid. The vessel's SMS references cargo compatibility chart (APP 1) and the cargo operation manual which prohibits two incompatible substances from being stored adjacent to one another. PSCO also observed incompatible cargo samples stowed in the cargo sample storage locker. Additionally, PSCO observed crew attempting to remove a flange from a cargo tank containing sulfuric acid to test the operation of pressure alarms which is contradictory to the approved procedures for testing pressure sensors in cargo tanks. An external audit by Flag is to determine whether ship crew are operating in accordance with the ISM code, to include cargo compatibility procedures, testing of pressure alarms and cargo sample storage is required prior to being released from detention.
74SOLAS(20)IX/3.1 / ISM Code 6.4
30abc
Action required: 30 - Ship detained
Due 10 September 2023
Resolved 16 September 2023
Resolution: PSCO received and reviewed the external audit conducted on the vessel. PSCO attended the vessel to verify deficiencies found during the audit were rectified and changes to procedures were implemented.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 10 September 2023Resolved
A chemical Tanker shall comply with the requirements of the International Bulk Chemical Code. [16.3.2] Personnel involved in cargo operations shall be adequately trained in handling procedures.
PSCO observed the crew try to remove flange on cargo tank #8 starboard to test pressure sensors. The cargo tank had 603 M3 of sulfuric acid. PSCO's informed the crew to stop and review ship's procedures for testing pressure sensors in cargo tanks. After review, it was determined the ship's procedures for testing pressure sensors stated; adjust pressure set points in the cargo tank in CCR to verify satisfactory operation of the pressure alarms.
74SOLAS(20)VII/10.1 / IBC 16.3.2
17abc
Action required: 17 - Rectify deficiencies prior to departure
Due 10 September 2023
Resolved 10 September 2023
Resolution: Deficiency rectified to the satisfcation of the attneding PSCO.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 10 September 2023Resolved
A chemical tanker shall comply with the requirements of the International Bulk Chemical Code. Samples which react with each other shall not be stowed close to each other.
PSCO observed multiple cargo and fuel samples inadequately segregated in the cargo sample locker.
74SOLAS(20)VII/10.1 / IBC 16.5.3
17abc
Action required: 17 - Rectify deficiencies prior to departure
Due 10 September 2023
Resolved 16 September 2023
Resolution: PSCO examined the ship's cargo sample storage locker and it was found in compliance.
0820-Protection Machines-INTERLOCKS SHOULD BE INSTALLED TO PREVENT ASH REMOVAL DOOR FROM OPENING WHILE BURNING IS IN PROCESS OR WHILE THE FURNACE TEMPERATURE(...), THE ASH DOOR ON THE INCINERATOR DID NOT CLOSE PROPERLY, CREW TOOK 20 MINS TO MANIPULATE INTERLOCK DEVICE. DOOR IS WARPED, PARTIAL GASKET MISSING AND POSES A FIRE AND SAFETY HAZARD TO CREW. 73/78MARPOL ANNEX VI/16.6.1 MEPC76(40)3.12
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 December 2016
Resolution: Received class report. Incinerator door and interlock repaired to class satisfaction.
Lifesaving › Inflatable Liferafts › Container Construction
Issued 2 December 2016Resolved
0620- Inflatable Liferats- BEFORE THE SHIP LEAVES PORT AND AT ALL TIMES DURING THE VOYAGE ALL LIFE SAVING APPLIANCES SHALL BE IN WORKING ORDER AND READY FOR IMMEDIATE USE. THE FORWARD LIFERAFT CONTAINER'S PAINTER LINE GASKET IS WORN AND WATER HAS INGRESSED INSIDE THE LIFERAFT CONTAINER COMPROMISING THE INTEGRITY OF THE LIFERAFT.74SOLAS(2014CONS)III/20.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 December 2016
Resolution: Received class report. New 06 man liferaft installed onboard.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.