← All vessels
CHARISMA
Freight Ship · Bulk Carrier class · Built 2010s · USCG Southeast District (CGD-SE) · Other hulls named CHARISMA
CHARISMA is a 2010 freight ship. The Coast Guard has recorded 11 inspections since 2010, most recently in November 2025, along with 4 deficiencies and 1 operational control.
Records from 2010 to 2025. Most recent: inspection, 24 November 2025.
- Built
- 2010
- Last inspected
- 24 November 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 4 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9409132 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
V7PH7
1053366
Flag
MARSHALL ISLANDS
—
Maury page id
psix-1053366
Inspections, by type
…with no type recorded2
Years with a record
7 calendar years (2010–2025)
The 11 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it18516 - Convention (Subpart B), Net Ton
64567 - Displacement, Ton
55667 - Dead Weight, Ton
31232 - Convention (Subpart B), Gross Ton
64567 - Displacement, Ton
55667 - Dead Weight, Ton
31232 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 11
24 November 2025
PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8268499
31 May 2022
Administrative Inspection · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7463831
29 May 2022
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7461857
29 May 2022
COE-Offshore
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7461874
30 April 2021
Administrative Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7186649
2 October 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7070389
17 August 2020
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7028997
14 August 2020
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7033180
8 February 2017
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6084823
23 February 2011
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3945202
6 February 2010
ISPS II Exam · PII Safety Exam · MARPOL Annex I Examination · Ballast Water Examination · MARPOL Annex VI Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3673633
Deficiency record · 4
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 August 2020
Resolved
Means shall be provided where by normal operation of propulsion machinery can be sustained or restored even though one of the essential auxiliaries becomes inoperative. Special consideration shall be given to the malfunctioning of: The source of water pressure. PSCO observed excessive jacket water leakage on #2 cylinder on the main diesel engine.
74SOLAS04(CONS)II-I/26.3.6
60a/c
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 17 August 2020
Resolved
Perform complete ballast water exchange in an area 200 nautical miles from any shore prior to discharging ballast water, unless the vessel is required to employ an approved BWMS per the schedule found in 151.2035(b) of this subpart. Vessel discharged untreated water into Mississippi river. Vessel required a corrective action plan with concurrence from administration.
33CFR151.2025(3)
60 b/c
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 17 August 2020
Resolved
Maintain a ballast water management plan that has been developed specifically for the vessel and that will allow those responsible for the plan’s implementation to understand and follow the vessel’s ballast water management strategy and comply with requirements of this subpart. The plan must include- actions for implementing the mandatory ballast water management requirements and practices.
33CFR151.2050(g)(2)
40b/c
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 23 February 2011
Resolved
0899 - Other (accident prevention) - Each loading arm and transfer pipe must not leak under static liquid pressure at least 1.5 times the maximum allowable working pressure. Last bunker test conducted in accordance with U.S. regulations was conducted on 02NOV2009. Provide documentation to the Coast Guard of satisfactory bunker line test prior to bunkering in U.S. - 33CFR156.170.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.