Records from 2016 to 2026. Most recent: inspection, 6 January 2026.
Inspection history · 22
6 January 2026
PSC A
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 8289579
2 October 2025
PSC B · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8243283
26 September 2025
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8241913
18 September 2025
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8236930
14 September 2025
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8233991
5 August 2025
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8203692
28 July 2025
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8196695
21 July 2025
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8186341
26 October 2024
PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8020983
18 October 2021
Administrative Inspection
Administrative · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 7334623
9 April 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7172169
14 February 2021
In-Service Inspection · PSC A · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7140573
3 November 2020
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7089164
13 November 2019
ISPS II Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6851991
7 October 2019
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6829796
11 November 2018
NPV Safety Exam · ISPS II Exam · Ballast Water Examination · COE-Dockside
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6573751
8 November 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6577015
16 September 2017
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6267966
15 September 2017
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6267085
8 September 2017
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6262514
8 August 2016
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5965692
20 July 2016
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5941420
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 3 October 2025
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with additional requirements which may be established by the company. Due to the deficiencies of a technical and/or operational nature identified below which individually or collectively provides objective evidence or a serious failure, or lack of effectiveness of the ISM code, an external audit shall be conducted by the Flag Administration before vessel will be released from its detention to determine whether vessel is operating in compliance with the ISM code. A copy of the completed external audit shall be provided for USCG review prior to departure from the port of Mobile.
74SOLAS (20) IX/3.1
ISM Code Part A/10.1
Action required: 30 - Ship detained
Resolved 13 October 2025
Resolution: Reviewed and found satisfactory external ISM audit.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 3 October 2025
Resolved
Ships shall be designed, constructed and maintained in compliance with the structural, mechanical and electrical requirements of a classification society. PSCO observed compromised clamping devices on multiple watertight doors located on aft forecastle bulkhead and forward house bulkhead.
74 SOLAS (04) II-1/3-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2025
Resolution: PSCO observed all watertight doors on the aft forecastle bulkhead and forward house bulkhead have clamping devices in the closed position.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 3 October 2025
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: structural fire protection, including fire-resisting divisions, and protection of openings and penetrations in these divisions. PSCO observed damaged or absent insulation in multiple locations listed as class A boundaries according to ship’s fire control plan and II-2 Reg 9 table 9.6 in and around the following spaces: cargo space boundary next to the engine room, incinerator room, Suez Canal Berthing and forward CO2 space.
74 SOLAS (20) II-2/14.2.1.1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2025
Resolution: PSCO observed replaced/renewed insulation in the forward CO2 space, Suez Canal berthing, Incinerator room, and on the bulkhead between the engine room and cargo holds.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 October 2025
Resolved
Ships shall be designed, constructed and maintained in compliance with the structural, mechanical and electrical requirements of a classification society. PSCO observed modification to electrical systems, and equipment in the incinerator space without RO or administration approval. Master could not provide any documentation regarding installation or approval of such modification.
74 SOLAS (04) II-1/3-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2025
Resolution: PSCO observed 'hydroblaster' wiring completely removed and circuit breaker renamed as a spare.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 3 October 2025
Resolved
Muster and embarkation stations shall be adequately illuminated by lighting supplied from the emergency source of electrical power... PSCO observed both inflatable liferaft embarkation lights were unable to be energized while on ships emergency power.
74 SOLAS (20) III/11.4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2025
Resolution: PSCO observed emergency lighting operating by the inflatable life raft embarkation stations.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 3 October 2025
Resolved
The level of knowledge of the subjects listed in column 2 of table A-VI/2-1 shall be sufficient to enable the candidate to launch and take charge of a survival craft or rescue boat in emergency situations. PSCO observed Chief Mate unable to turn off the freefall lifeboat engine.
STCW A-VI/2.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2025
Resolution: PSCO observed the Chief Mate start and stop the freefall lifeboat.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 3 October 2025
Resolved
Unless expressly provided otherwise in this regulation, at least two widely separated and ready means of escape shall be provided from all spaces or groups of spaces. PSCO observed the Emergency Generator Room was not provided with an accessible secondary means of escape due to the hatch dogging from the outside preventing egress.
74 SOLAS (09) II-2/13.2.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 October 2025
Resolution: PSCO examined and found satisfactory Emergency Generator escape hatch with dogs installed to be accessible from inside the space as well as from the weather deck.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 3 October 2025
Resolved
Ships shall be designed, constructed and maintained in compliance with the structural, mechanical and electrical requirements of a classification society. PSCO observed multiple electrical installation boxes on the weather deck with damaged gaskets and compromised watertight/weathertight integrity.
74 SOLAS (04) II-1/3-1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 October 2025
Resolution: PSCO observed new electrical boxes in satisfactory condition and rated for indoor/outdoor applications to prevent water intrusion.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 2 October 2025
Resolved
The following fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs: fire detection and fire alarm systems. PSCO observed fire detection system for cargo holds disconnected.
74 SOLAS (09) II-2/14.2.1.1.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2025
Resolution: PSCO observed an operating smoke detection system with hoses attached to the sampling points in the CO2 room. No faults were observed on the system.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 October 2025
Resolved
Where a fixed gas fire-extinguishing system is used, openings which may admit air to, or allow gas to escape from, a protected space shall be capable of being closed from outside the protected space. PSCO observed that cargo hold drain lines did not have fire caps readily available.
74 SOLAS (09) II-2/10.4.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2025
Resolution: PSCO observed fire caps on the drain lines attached to the cargo holds.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 2 October 2025
Resolved
Ventilator openings shall be provided with weathertight closing appliances. PSCO observed multiple ventilation closures unable to be fully closed with closing devices tightened.
ICLL 3/19.4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 October 2025
Resolution: PSCO observed all ventilators on the aft forecastle bulkhead closed and tightening devices tightened all the way down.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 2 October 2025
Resolved
Plans and booklets shall be kept up to date; any alterations thereto shall be recorded as soon as practicable. PSCO observed outdated fire control plan regarding the incinerator room.
74 SOLAS (09) II-2/15.2.4.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2025
Resolved 6 January 2026
Resolution: Fire control plan was updated and posted on board.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 2 October 2025
Resolved
All ships of 500 gross tonnage and upwards shall have... rudder indicators to determine and display rudder angle, readable from the conning positions. PSCO observed both bridge wing rudder angle indicators did not match the rudder angle indicator at the helm.
74 SOLAS (20) V/19.2.5.4
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 November 2025
Resolved 13 October 2025
Resolution: PSCO conducted rudder test from bridge with verification from steering gear room. Rudder angle indicators found to match through full range of motion.
09 - Working and Living Conditions › 092 - Working Conditions › Loading and unloading equipment
Issued 5 August 2025
Resolved
Ships shall be designed, constructed and maintained in compliance with electrical requirements of a class society recognized by the administration. Due to failure while conductions crane operations, agent informed PSCO of #2 crane inoperable.
Action required: 10 - Deficiency Rectified
Due 5 August 2025
Resolved 5 August 2025
Resolution: USCG ensured connection was secured and verified crane is operational.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 14 February 2021
Resolved
02106-Structural Conditions-The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. On 13FEB2021 the vessel lost power and dropped anchor, wedging the anchor between the ground and the ship, causing puctures in the port side #2 and #3 ballast tanks and the centerline pipe tunnel. The vessel is not fit to proceed to sea.-74SOLAS(14)I/11
40abc
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 April 2021
Resolution: Vessel agent submitted Class Survey Report attesting to satisfactory repairs.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 14 February 2021
Resolved
15105-Safety Management Systems-The company should establish procedures to ensure that personnel are given proper familiarization with their duties. There are no procedures pertaining to proper valve alignment to ensure main propulsion and electrical power plant have proper fuel supply-74SOLAS(14)IX/3.1 & ISM CODE 6.3
17abc
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2021
Resolution: Temporary repairs conducted/Class Survey Report received.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 February 2021
Resolved
13101-Propulsion and Auxilary Machinery-The machinery, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. While transitting within the channel, vessel lost main propulsion and the electrical power plant.-74SOLAS(14)II-1/26.1
17abc
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 March 2021
Resolution: Temporary repairs conducted/Class Survey Report received.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 11 November 2018
Resolved
10119 - Safety of Navigation - The angular position of the rudder shall be indicated on the navigation bridge. PSCO observed the rudder angle indication on the navigation bridge and steering gear repeater were inaccurate by approximately 12 degrees. Rudder stock indicated 35 degrees port/stbd and navigation bridge and steering room repeaters indicated 23 degrees. 74 SOLAS (2004 Cons Ed) II-1/29.11.1 60ac
Action required: 60 - Rectify deficiencies prior to movement
Resolved 11 November 2018
Resolution: Received proper documentation from Sperry Marine and BV stating the deficiency was rectified.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 11 November 2018
Resolved
11104 - Life Saving Appliances - Cargo ships shall carry at least one rescue boat complying with the requirements of section 5.1 of the Code. Crew was unable to start the rescue boat due to a defective and unreliable gear shifting mechanism that is required to be out of gear in order for the engine to start. Crew eventually was able to start the boat. 74 SOLAS (2014 Cons Ed) III/31.2 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 November 2018
Resolution: Received class report from BV stating the deficiency was rectified.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 11 November 2018
Resolved
11113 - Life Saving Appliances - All life-saving appliances and arrangements shall comply with the applicable requirements of the Code. Where davit arms are recovered by power, safety devices shall be fitted which will automatically cut off power before the davit arms reach the stops in order to prevent overstressing the falls or davits. PSCO observed rescue boat limit switch to be seized and not stopping retrieval of falls. 74 SOLAS (2014 Cons Ed) III/34 LSA Code 6.1.2.7 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 November 2018
Resolution: Received class report from BV stating the deficiency was rectified.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 11 November 2018
Resolved
11102 - Life Saving Appliances - All life-saving appliances and arrangements shall comply with the applicable requirements of the Code. The normal equipment of every lifeboat shall consist of anti-sea sickness medicine sufficient for at least 48 h and one seasickness bag for each person. Crew could not provide anti-sea sickness medicine. Pills were later discovered in the Master's cabin. 74 SOLAS (2014 Cons Ed) III/34 LSA Code 4.4.8.21 10c
Action required: 10 - Deficiency Rectified
Resolved 11 November 2018
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo density declaration
Issued 11 November 2018
Resolved
06108 - Cargo Operations Including Equipment - The carriage of solid bulk cargoes other than grain shall be in compliance with the relevant provisions of the IMSBC Code. Cargo information shall be confirmed in writing and by appropriate shipping documents prior to loading cargo. Vessel could not provide any shipping documents or declarations that provide cargo information as required by the IMSBC Code Section 4. Vessel retrieved correct information prior to conclusion of exam. 74 SOLAS (2014 Cons Ed) VI/1-2 IMSBC Code 4.2.2.1 10c
Action required: 10 - Deficiency Rectified
Resolved 11 November 2018
Lifesaving › Lifeboat › Hull
Issued 20 July 2016
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS. PSC OFFICER OBSERVED MULTIPLE HULL PATHCES ON THE FREEFALL LIFEBOAT.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 19 August 2016
Resolved 8 August 2016
Resolution: Received class report deeming repairs as acceptable. Attached to documents.