BROADWAY

BROADWAY is a 2010 tank ship. The Coast Guard has recorded 11 inspections since 2010, most recently in December 2025, along with 7 deficiencies and 2 operational controls.

Records from 2010 to 2025. Most recent: inspection, 22 December 2025.

Built
2010
Last inspected
22 December 2025
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9456070 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
1056791
Flag
MARSHALL ISLANDS
—
Maury page id
psix-1056791

Inspections, by type

…with no type recorded2
Years with a record 7 calendar years (2010–2025)
The 11 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it23225 - Convention (Subpart B), Gross Ton
9625 - Convention (Subpart B), Net Ton
36955 - Dead Weight, Metric Ton
45670 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 11

22 December 2025 COC-CHEM & TVE Renew
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8285124
21 August 2023 PSC B · Deficiency Check · COC-CHEM & TVE Annual
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7769687
16 March 2023 COE-Offshore
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7652171
16 March 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7652203
12 March 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7649638
30 September 2022 In-Service Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7569175
20 June 2022 PSC B · COC-CHEM & TVE Renew · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7482230
27 March 2021 PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7163808
24 March 2020 COC-CHEM & TVE Renew · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6930488
29 June 2017 ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Renew
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6187775
30 March 2010 ISPS II Exam · Ballast Water Examination · COC-CHEM Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3705805

Deficiency record · 7

07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 21 August 2023 Resolved
FOR TANKERS OF 20,000 TONNES DEADWEIGHT AND UPWARDS, THE PROTECTION OF THE CARGO TANKS SHALL BE ACHEIVED BY A FIXED INERT GAS SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF THE FIRE SAFETY SYSTEMS CODE. SPECIAL CONSIDERATION SHALL BE GIVEN TO DESIGN AND LOCATION OF SCRUBBER AND BLOWERS WITH RELEVANT PIPING AND FITTINGS IN ORDER TO PREVENT FLUE GAS LEAKAGES. NO. 2 BLOWER SOLENOID WAS CORRODED, PRODUCING A MIST OF FLUE GAS SPRAYING INTO THE ENGINE ROOM. SOLAS 74 (2014) II-2/5.5.1.1 FSS CODE 15.2.3.1.6.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 August 2023
Resolved 21 August 2023
Resolution: SOLENOID VALVED WAS REPLACED, PSCO WITNESSED AIR TEST ON IGG BLOWER LINE.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 21 August 2023 Resolved
THE COMPANY AND THE SHIP SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL SAFETY MANAGEMENT CODE. FOR THE PURPOSE OF THIS REGULATION, THE REQUIREMENTS OF THE CODE SHALL BE TREATED AS MANDATORY. THE COMPANY SHOULD ESTABLISH AND MAINTAIN PROCEDURES FOR IDENTIFYING ANY TRAINING WICH MAY BE REQUIRED IN SUPPORT OF THE SAFETY MANAGEMENT SYSTEM AND ENSURE THAT SUCH TRAINING IS PROVIDED FOR ALL PERSONNEL CONCERNED. TEMPERATURE SENSORS AND ALARM ARE TESTED AND FOUND OPERATIONAL. PSCO FOUND CREW UNABLE TO PERFORM TIMELY FUNCTIONAL TEST OF THE TEMPERATURE ALARMS. SOLAS 74 (2014) IX/3.1 ISM CODE 6.5 SMS CL-29(G) 14
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 21 September 2023
Resolved 27 September 2023
Resolution: Vessel conducted an audit. See attached report.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 August 2023 Resolved
A CHEMICAL TANKER SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL BULK CHEMICAL CODE. SAMPLES WHICH REACT WITH EACH OTHER DANGEROUSLY SHALL NOT BE STOWED CLOSE TO EACH OTHER. PSCO OBSERVED ANNX 1 SAMPLES STOWED OUTSIDE OF CONTAINMENT WITHIN THE ANNEX 2 AREA, UNSECURED NEXT TO ANNEX 2 BOTTLES. SOLAS 74 (2014) VII/10.1 IBC CODE 16.5.3
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 August 2023
Resolved 21 August 2023
Resolution: PSCO WITNESSED ALL SAMPLES STOWED IN ACCORDANCE WITH COMPANY POLICY.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 21 August 2023 Resolved
A CHEMICAL TANKER SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL BULK CHEMICAL CODE. SAMPLES SHALL NOT BE RETAINED ON BOARD LONGER THAN NECESSARY. PER COMPANY POLICY, SAMPLES ARE NOT TO BE KEPT ON BOARD LONGER THAN 9 MONTHS. PSCO OBSERVED 7 SAMPLES OLDER THAN 9 MONTHS. SOLAS 74 (2014) VII/10.1 IBC CODE 16.5.4
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 August 2023
Resolved 21 August 2023
Resolution: PSCO WITNESSED DISPOSAL OF OVERDUE RETAINED SAMPLES.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 21 August 2023 Resolved
THE COMPANY AND THE SHIP SHALL COMPLY WITHT THE REQUIREMENTS OF THE INTERNATIONAL SAFETY MANAGEMENT CODE. FOR THE PURPOSE OF THIS REGULATION, THE REQUIREMENTS OF THE CODE SHALL BE TREATED AS MANDATORY. THE COMPANY SHOULD ENSURE THAT THE SHIP'S PERSONNEL ARE ABLE TO COMMUNICATE EFFECTIVELY IN THE EXECUTION OF THEIR DUTIES RELATED TO THE SAFETY MANAGEMENT SYSTEM. A SAFETY HARNESS WITH LIFELINE OR OTHER ARRESTING DEVICE SHOULD BE CONTINUOUSLY WORN WHEN WORKING ALOFT, OUTBOARD, OR OVERSIDE. PSCO OBSERVED CREW WORKING OVERSIDE WITHOUT A SAFETY HARNESS, ARRESTING DEVICE, OR LIFELINE.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 21 September 2023
Resolved 27 September 2023
Resolution: Vessel conducted audit, see attached report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisons of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. While transiting the lower mississippi river, the vessel reported a reduction in main propulsion due to a cylinder going down. Deficiency cleared via class report attesting to the satisfactory repair of cylinder no. 6.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 September 2022
Resolution: Provided Class report
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 March 2021 Resolved
INERT GAS SYSTEM BLOWER #1 WAS INOPERABLE
Condition: Invalid
Due 27 April 2021
Resolved 20 June 2022
Resolution: Class report recieved. Blower was tested during PSC exam and found in good order.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.