SEAWAYS MUSE is a 2009 tank ship. The Coast Guard has recorded 13 inspections since 2017, most recently in September 2025, along with 6 deficiencies and 3 operational controls.
Records from 2017 to 2025. Most recent: inspection, 13 September 2025.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it29767 - Convention (Subpart B), Gross Ton 13661 - Convention (Subpart B), Net Ton 614193 - Displacement, Ton 51498 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 13
13 September 2025PSC B · COC-CHEM & TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8233595
23 November 2023Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7828969
17 November 2023COC-CHEM & TVE Renew · PSC B · Appeal
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7820762
1 February 2022Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7388884
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 17 November 2023Resolved
The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. Due to the objective evidence detailed in the below deficiencies, the vessel is not in compliance with relevant conventions, calling into question the adequacy and implementation of the vessel's SMS under the ISM code. An external audit conducted by Flag or RO is required to determine whether the ship is operating in accordance with the ISM code. Provide a copy of the completed audit report to USCG prior to being released from the detention.
74SOLAS(20)IX/3.1 ISM A/10.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 22 November 2023
Resolution: DNV completed ISM Audit. See attached Audit for more details.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 17 November 2023Resolved
For tankers of 20,000 tonnes deadweight and upwards, the protection of the cargo tanks shall be achieved by a fixed inert gas system in accordance with the requirements of the Fire Safety Systems Code. PSCO observed severe deterioration inside the combustion chamber for IGG, allowing cooling water to enter the combustion chamber, therefore rendering the IGG system inoperable. The vessel was observed in loaded condition carrying a MARPOL Annex I cargo that is required to be inerted. PSCO's reviewed correspondence that indicated this deficiency was identified by the crew on 29JUN2023. The vessel notified company, but failed to notify Flag or Class. Furthermore, the vessel made temporary repairs to the combustion chamber without prior authorization from the Classification society.
74SOLAS(04)II-2/4.5.5
Action required: 30 - Ship detained
Resolved 22 November 2023
Resolution: IGG tested in presence of ABS surveyor and Coast Guard personnel. All alarms SAT.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 17 November 2023Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For the purpose, the following functional requirements shall be met: means shall be provided to control leaks of flammable liquids. PSCO observed oil-soaked rags and fuel oil leaks on the Diesel Generator #1 emitting from the fuel injector pumps. In addition, an excessive amount of oil-soaked rags in the vicinity of the DG #1, posing a fire hazard within the space.
74 SOLAS(04)II-2/4.1.1
Action required: 30 - Ship detained
Resolved 22 November 2023
Resolution: Fuel leaks have been rectified.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 17 November 2023Resolved
In addition to complying with the requirements of section 4.8, a fire-protected lifeboat, when waterborne, shall be capable of protecting the number of persons it is permitted to accommodate when subjected to a continuous oil fire that envelops the lifeboat for a period of not less than 8 minutes. PSCO observed a broken linkage preventing the sprinklers on the starboard side lifeboat from functioning.
74 SOLAS(20)III/34
LSA Code 4.9
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 November 2023
Resolution: Lifeboat sprinkler system has been rectified, tested ALL SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 17 November 2023Resolved
Every steam pipe and every fitting connected thereto through which steam may pass shall be so designed, constructed and installed as to withstand the maximum working stresses to which it may be subjected. PSCO observed steam leak on HFO service tank line.
74 SOLAS(20)II-2/33
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 November 2023
Resolution: Steam valve seal replaced. ALL SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 November 2023Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed waterjacket on main engine leaking on all but one cylinder.
74 SOLAS(20)I/11(a)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 22 November 2023
Resolution: Main Engine Water Jacket seals/o-rings replaced on cyclinders #2, 4, 5. ALL SAT.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.