Records from 1994 to 2017. Most recent: inspection, 12 September 2017.
Fire Fighting › Fire Hoses › Number
Issued 17 September 2015
Resolved
Obtain 1 50' fire hose for port hose station.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 September 2015
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 17 September 2015
Resolved
Crew member [name withheld] was able to provide proof of enrollment.
Action required: 705 - Other - as specified
Due 17 October 2015
Resolved 18 September 2015
Engineering › Diesel Engine (auxiliary) › Pump, High Pressure (fuel injection)
Issued 17 September 2015
Resolved
Provide status & repair report to OCMI as to cause of port generator mechanical failure.
Due 17 October 2015
Resolved 19 October 2015
Resolution: Plan received for repairing generator.
Navigation › Piloting/Steering › Marine Charts
Issued 17 September 2015
Resolved
Provide current corrected marine chart for area of operation.
Due 17 October 2015
Resolved 25 September 2015
Navigation › Piloting/Steering › Coast Guard Light List
Issued 17 September 2015
Resolved
Print & retain onboard the 2015 Coast Guard light list for area of operation.
Due 17 October 2015
Resolved 25 September 2015
Construction/Loadline › Structures › Door
Issued 17 September 2015
Resolved
Adjust dogs on aft watertight door to ensure required seal with gasket to maintain subdivision as listed on the vessel's stability letter and to the satisfaction of the attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 September 2015
Fire Fighting › Fire Hydrants › Condition
Issued 17 September 2015
Resolved
Tighten leaking valve at bridge fire hose station.
Due 17 October 2015
Resolved 25 September 2015
Stability › Watertight Integrity › General
Issued 17 September 2015
Resolved
Tighten leaking bilge overboard discharge fitting on STBD hull of engine room.
Action required: 705 - Other - as specified
Due 17 October 2015
Resolved 25 September 2015
Fire Fighting › Means of Escape › Emergency Lighting
Issued 17 September 2015
Resolved
Renew both inoperable emergency lights below main deck & demonstrate both are in proper working order for attending for marine inspector during vessel loss of power.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 September 2015
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 24 October 2014
Resolved
Properly maintain and/or pack port and starboard propeller shafts. Prove proper operation and monitor water seepage hourly when passengers are aboard. Report to USCG Marine Inspector immediately if condition worsens.
Due 24 October 2014
Resolved 30 October 2014
Resolution: Shaft seal re=packed and sufficient cooling has been achieved.
Engineering › Steering Gear System › Rudder Bearing
Issued 24 October 2014
Resolved
Properly maintain and/or pack port and starboard rudder posts. Prove proper operation and monitor water seepage hourly when passengers are aboard. Report to USCG Marine Inspector immediately if condition worsens.
Due 24 October 2014
Resolved 30 October 2014
Resolution: Port and starboard rudder posts re=packed and inspected satisfactory.
Operations/Management › Navigation Safety › Navigation Underway, General
Issued 14 October 2014
Resolved
Prior to carrying passengers, conduct underway operational tests to confirm vessel's hull is watertight after drydock examination.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 November 2014
Resolved 24 October 2014
Resolution: Satisfactory conducted underway sea-trials. The hull was found to be watertight.
Construction/Loadline › Hull › Keel Plate
Issued 14 October 2014
Resolved
Provide repair proposal to seal and renew worm shoe.
Due 15 October 2014
Resolved 22 October 2014
Resolution: Repair proposal received. Worm after-most 29ft of worm shoe installed and sealed with tar and paper.
Construction/Loadline › Hull › Hull Plating
Issued 14 October 2014
Resolved
Provide repair proposal for the garboard strake seam gap between the garboard and keel, port and starboard sides aft of amidships.
Due 15 October 2014
Resolved 22 October 2014
Resolution: Repair for the seam gap was filled with Interlux seam seal.
Construction/Loadline › Hull › Hull Plating
Issued 14 October 2014
Resolved
Remove for examination identified 17 wood mechanical fasteners.
Due 15 October 2014
Resolved 22 October 2014
Resolution: 17 wood screw fasteners examined. Fasteners were in very good condition except for three which exhibited minor necking-down. Nearly all of the inspected fasteners had exhibited de-zincification due to water saturation. Some were without proper bungs.
Construction/Loadline › Hull › Hull Plating
Issued 14 October 2014
Resolved
Provide bung/fastener repair proposal for the transom strake on the centerline.
Due 15 October 2014
Resolved 22 October 2014
Resolution: Owner scarfed mahogany insert to repair damage caused by removal of fasteners.
Construction/Loadline › Penetrations › Valve Flange
Issued 14 October 2014
Resolved
Prove proper installation of two 1.5 inch bronze thru-hull fittings.
Due 15 October 2014
Resolved 22 October 2014
Resolution: Owner properly installed two 1.5inch bronze overboard discharge thru-hull fittings on the starboard side.
Construction/Loadline › Hull › Hull Plating
Issued 14 October 2014
Resolved
Provide repair proposal for abandoning the starboard aft bar sink drain overboard discharge.
Due 15 October 2014
Resolved 22 October 2014
Resolution: The thru-hull was removed and sealed with a 1.5 inch bung, with epoxy and silicon bronze fastener to butt block.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 4 January 2010
Resolved
Failure to make vsl available for annual insp w/in 3 months before or after each anniversary date of issuance of the COI.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 February 2010
Resolved 4 January 2010
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 4 January 2010
Resolved
Properly service all portable fire extinguishers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Fire Fighting › Portable CO2 Fire Extinguisher › Location
Issued 4 January 2010
Resolved
Provide 02 A-II fire extinguishers onboard vsl.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Communications › Alarms/Indicators › High Water Alarm
Issued 4 January 2010
Resolved
Repair H/L alarm located in tool rm fwd of engine rm bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Navigation › Piloting/Steering › US Coast Pilot
Issued 4 January 2010
Resolved
Provide updated Coast Pilot and Light List manuals for vsl.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 February 2010
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 4 January 2010
Resolved
Provide eyewash and anti-bacterial ointment for first aid chest.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Fire Fighting › Means of Escape › Enclosed Stairway
Issued 4 January 2010
Resolved
Properly label all emergency escape hatches on both sides.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Electrical › Lighting (emergency) › Lighting Fixture
Issued 4 January 2010
Resolved
Prove proper operation of all emergency lighting on board vsl.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 February 2010
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 4 January 2010
Resolved
Prove proper operation of all vsl smoke detectors.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 4 January 2010
Resolved
Provide emergency broadcast placard.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 4 January 2010
Resolved
Provide proof of enrollment in DOT certified drug testing program.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Fire Fighting › Means of Escape › Doorways
Issued 4 January 2010
Resolved
Prove proper operation of all emergency escapes.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 January 2010
Resolved
Properly secure electrical wiring located on ceiling light switch in fwd storage rm.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 February 2010
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 4 January 2010
Resolved
Repair hinge on electrical box located in engine rm.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Stability › Weathertight Integrity › General
Issued 4 January 2010
Resolved
Repair dogs on port light cover located in engine rm and accommodations spaces.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 February 2010
Construction/Loadline › Penetrations › Pipe Flange
Issued 4 January 2010
Resolved
Properly secure through hull fitting located in engine rm, stbd side.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Lifesaving › Lifebuoys › Serviceable
Issued 4 January 2010
Resolved
Provide retroflective tape on all three ring buoys.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 January 2010
Resolved
Properly secure electrical wires not in use located in engine rm and storage rm bilge compartment.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 4 January 2010
Resolved
Properly label lifejacket storage compartments with amount and proper "Adult"/"Child" lifejacket label.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2010
Documentation › Certificates/Documents › FCC SSL
Issued 23 May 2008
Resolved
Provide FCC operator permit and FCC SSL
Condition: Improper/Lack of Maintenance
Due 1 June 2008
Resolved 17 September 2008
Navigation › Collision/Grounding Avoidance › Radar
Issued 23 May 2008
Resolved
Service vessel radar
Condition: Improper/Lack of Maintenance
Due 1 June 2008
Resolved 10 June 2008
Resolution: Serviced radar
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 23 May 2008
Resolved
Repair engine shutdown for fixed system
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 June 2008
Resolution: Repaired engine shutdowns
Electrical › Electrical Distribution System (service) › Wiring
Issued 23 May 2008
Resolved
Hard wire battery charger.
Condition: Improper/Lack of Maintenance
Due 1 June 2008
Resolved 16 June 2008
Resolution: Hard wired battery charger
Lifesaving › Lifebuoys › Serviceable
Issued 23 May 2008
Resolved
Add retro to life rings.
Condition: Improper/Lack of Maintenance
Due 1 June 2008
Resolved 16 June 2008
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 23 May 2008
Resolved
Provide 4 adult and on child life jackets.
Condition: Improper/Lack of Maintenance
Due 1 June 2008
Resolved 16 June 2008
Resolution: Added lifejackets
Engineering › Diesel Engine (propulsion-direct drive) › Gear, Timing
Issued 23 May 2008
Resolved
Repair port mde tack.
Condition: Improper/Lack of Maintenance
Due 1 June 2008
Resolved 16 June 2008
Resolution: Repaired tac
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 15 August 2006
Resolved
Provide relief valve for air horn pressure tank.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 29 August 2006
Resolved 14 December 2006
Engineering › Fuel Oil Service System › Piping
Issued 15 August 2006
Resolved
Renew mid fuel tank return line and support properly.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 29 August 2006
Resolved 14 December 2006
Electrical › Electric Supply System (service) › Cable
Issued 15 August 2006
Resolved
Clean STBD battery bank connections.
Condition: Improper/Lack of Maintenance
Due 29 August 2006
Resolved 14 December 2006
Construction/Loadline › Structures › Deck Plating
Issued 15 August 2006
Resolved
Repair overhead deck leaks in engine room STBD side.
Action required: 705 - Other - as specified
Due 29 August 2006
Resolved 14 December 2006
Engineering › Sea-water System (primary cooling) › Piping
Issued 15 August 2006
Resolved
Replace hose clamps on STBD main engine water inlet.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 August 2006
Resolved 14 December 2006
Engineering › Shafting/Propeller Arrangements › Stern Gland
Issued 15 August 2006
Resolved
Renew all 4 packing gland clamps on STBD shaft and provide ground strap.
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 August 2006
Resolved 14 December 2006
Engineering › Bilge Water Management System › Pump
Issued 15 August 2006
Resolved
Provide secondary bilge pump for lazarette space.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 29 August 2006
Resolved 14 December 2006
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 15 August 2006
Resolved
Secure STBD line shaft bearing in guest room and tighten packing gland.
Action required: 705 - Other - as specified
Due 29 August 2006
Resolved 14 December 2006
Engineering › Bilge Water Management System › Valve
Issued 25 May 2005
Resolved
Prior to carring passengers, prove proper operation of the bilge system.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2005
Resolved 31 May 2005
Resolution: Wittnessed the proper operation of the bilge system.
Construction/Loadline › Structures › Scupper
Issued 25 May 2005
Resolved
Repair the port side overboard discharge in the lazarette.
Condition: Unknown
Action required: 705 - Other - as specified
Due 24 June 2005
Resolved 31 May 2005
Resolution: Replaced overboard discharge spool piece and reconnected the hose.
Construction/Loadline › Structures › Superstructure
Issued 24 May 2005
Resolved
Repair leaks in the overhead in the main salon.
Condition: Unknown
Action required: 705 - Other - as specified
Due 24 June 2005
Resolved 31 May 2005
Resolution: Repaired the rubber membrane on the deck above the main salon.
Construction/Loadline › Structures › Superstructure
Issued 24 May 2005
Resolved
Repair leaks on the starboard side, in the master berthing area closet.
Condition: Unknown
Action required: 705 - Other - as specified
Due 24 June 2005
Resolved 31 May 2005
Resolution: Repaired rubber membrane on the deck above the closet area.
Construction/Loadline › Hull › Side Shell
Issued 23 November 2004
Resolved
Renew as original, 3 sideshell planks on port quarter IWO chine, of approximate lengths 6 ft, 8 ft and 14 ft, to existing butts.
Action required: 705 - Other - as specified
Due 23 December 2004
Resolved 6 December 2004
Resolution: Examined 3 renewed planks, sat.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 23 November 2004
Resolved
Remove lead ballast and make forepeak available for internal inspection.
Action required: 705 - Other - as specified
Due 23 December 2004
Resolved 29 November 2004
Resolution: Examined forepeak, sat.
Accommodation/Occupational Safety › Occupational Safety › Storm Rail
Issued 23 November 2004
Resolved
Secure loose rails port/stbd IWO boarding doors.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 December 2004
Resolved 11 May 2005
Construction/Loadline › Hull › Side Shell
Issued 23 November 2004
Resolved
Replace missing dogs on port light covers in fwd accomodations and engine room.
Action required: 705 - Other - as specified
Due 23 December 2004
Resolved 11 May 2005
Communications › Alarms/Indicators › Bilge Alarm
Issued 14 June 2004
Resolved
Prior to carrying passengers prove proper operation of High bilge level sensor, including audible and visual.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Resolution: Proved proper operation of high bilge level sensor, including audible and visual.
Engineering › Bilge Water Management System › Not Operational
Issued 14 June 2004
Resolved
Prior to carrying passengers prove proper operation of individual automatic bilge pumps.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Resolution: Proved proper operation of individual automatic bilge pumps.
Communications › Alarms/Indicators › Bilge Alarm
Issued 14 June 2004
Resolved
The above component (Bilge alarm is not correct).
Prior to carrying passengers prove proper operation of watertight door alarm/indicator.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Resolution: Proved proper operation of WTD alarm/indicator.
Engineering › Sea-water System (primary cooling) › Valve
Issued 14 June 2004
Resolved
Prior to carrying passengers prove proper operation of sea valve in companioway.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Resolution: Proved proper operation.
Stability › Watertight Integrity › Deadlight Cover
Issued 14 June 2004
Resolved
Prior to carrying passengers properly secure deadlight covers below main deck.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Resolution: Properly secured deadlight covers below main deck.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 14 June 2004
Resolved
Prior to carrying passengers secure stbd pedestal bearing to alleviate excessive vibration.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Resolution: Secured stbd pedestal bearing.
Engineering › Fuel Oil Service System › Piping
Issued 14 June 2004
Resolved
Prior to carrying passengers properly repair fuel line for port engine/generator. (leak)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Resolution: Repaire fuel line.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 14 June 2004
Resolved
Prior to carrying passengers remove excess fuel/oil in engine room bilges. (fire Hazard)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Resolution: Removed excess oil/fuel.
Operations/Management › Navigation Safety › Doors Closed at Sea
Issued 14 June 2004
Resolved
Component above is not correct. Fresh water line let go in bilge and there is water flow in bilge that is undetermined where it is coming from. Prior to carrying passengers prove water migration is coming from so as to ensure flooding is not occuring from sea.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 June 2004
Resolution: Removed all water and flow in no longer in bilge, ensured flooding was not occuring from sea. (No hole in vessel)
Operations/Management › Drills/Instruction › Fire
Issued 14 June 2004
Resolved
Update station bill.
Action required: 705 - Other - as specified
Due 2 August 2004
Resolved 17 June 2004
Resolution: Updated station bill
Construction/Loadline › Penetrations › Pipe Flange
Issued 14 June 2004
Resolved
Replace forepeak cover under coaming. (anchor chain hole)
Action required: 705 - Other - as specified
Due 2 August 2004
Resolved 17 June 2004
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 14 June 2004
Resolved
Replace ground bonding straps throughout the vessel.
Action required: 705 - Other - as specified
Due 2 August 2004
Resolved 17 June 2004
Communications › Alarms/Indicators › Propeller Speed Indicator
Issued 14 June 2004
Resolved
Component is wrong.
Repair port eng RPM gauge.
Action required: 705 - Other - as specified
Due 2 August 2004
Resolved 17 June 2004
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 14 June 2004
Resolved
Component is wrong.
Prove proper operation of stbd engine start/stop.
Action required: 705 - Other - as specified
Due 2 August 2004
Resolved 17 June 2004
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 14 June 2004
Resolved
Reinstall plug in unused fuel tank in aft stateroom.
Action required: 705 - Other - as specified
Due 2 August 2004
Resolved 17 June 2004
Engineering › Freshwater System (air cooling) › Piping
Issued 14 June 2004
Resolved
Repair A/C cooling water leak in engine room (minor)
Action required: 705 - Other - as specified
Due 2 August 2004
Resolved 17 June 2004
Navigation › Piloting/Steering › Magnetic Compass
Issued 14 June 2004
Resolved
Repair compass light NLT 02AUG04
Action required: 705 - Other - as specified
Due 2 August 2004
Resolved 17 June 2004
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 14 June 2004
Resolved
Repair bridge safety glass prior to vessel completing credit dry-dock exam.
Action required: 705 - Other - as specified
Due 31 December 2004
Resolved 29 November 2004
Resolution: Examined new window, sat.
Electrical › Electrical Distribution System (service) › Conductor
Issued 14 June 2004
Resolved
Replace non-stranded conductor from bilge system prior to vessel completing credit dry-dock exam
Action required: 705 - Other - as specified
Due 23 November 2004
Resolved 23 November 2004
Resolution: Examined and found satisfactory.
Communications › Alarms/Indicators
Issued 22 July 2003
Resolved
Install individual audio and visual alarms for all high bilge level alarms. LEGACY COMPONENT DESC: Bilge Alarm
Action required: 705 - Other - as specified
Due 8 August 2003
Resolved 5 September 2003
Lifesaving › Lifebuoys
Issued 22 July 2003
Resolved
Provide new lifeline for ringbuoy, install 3' halyard with clip for waterlight. LEGACY COMPONENT DESC: Buoyant Lifeline
Action required: 705 - Other - as specified
Due 8 August 2003
Resolved 5 September 2003
Construction/Loadline › Hull
Issued 2 December 2002
Resolved
Properly repiar the forepeak deck hatch.
Action required: 705 - Other - as specified
Due 7 January 2003
Resolved 7 January 2003
Construction/Loadline › Hull
Issued 2 December 2002
Resolved
Properly repair the port light in the crews quarters port side.
Action required: 705 - Other - as specified
Due 7 January 2003
Resolved 14 January 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 2 December 2002
Resolved
Properly repair the main deck rails port and starboard side, amidships. LEGACY COMPONENT DESC: Deck Rail
Action required: 705 - Other - as specified
Due 7 January 2003
Resolved 7 January 2003
Fire Fighting › Fixed Fire Detection System
Issued 24 June 2002
Resolved
No passengers will be allowed in overnight accomodation spaces until proper (UL standard 217) smoke detectors are installed. LEGACY COMPONENT DESC: Smoke Detectors
Action required: 705 - Other - as specified
Resolved 8 July 2002
Engineering › Bilge Water Management System
Issued 24 June 2002
Resolved
Install new float switch for starboard aft bilge pump.
Action required: 705 - Other - as specified
Due 8 July 2002
Resolved 8 July 2002
Lifesaving › Lifebuoys
Issued 24 June 2002
Resolved
Replace Port ring buoy and provide ring buoy for flying bridge.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 June 2002
Electrical › Electrical Distribution System (service)
Issued 24 June 2002
Resolved
Place aft bilge pump wires in watertight junction box. LEGACY COMPONENT DESC: Junction Box
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 8 July 2002
Resolved 8 July 2002
Engineering › Fuel Oil Service System
Issued 24 June 2002
Resolved
Install Flame shield on port Generator fuel filter. LEGACY COMPONENT DESC: Filter
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 8 July 2002
Resolved 8 July 2002
Stability › Watertight Integrity
Issued 24 June 2002
Resolved
Tighten dead light covers in Engine Room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 July 2002
Resolved 26 June 2002
Lifesaving › Lifejacket/PFD (General)
Issued 24 June 2002
Resolved
Install PFD donning placards on Main and Upper deck.
Action required: 705 - Other - as specified
Due 8 July 2002
Resolved 8 July 2002
Engineering › Bilge Water Management System
Issued 24 June 2002
Resolved
Prove proper operation of engine driven fire/bilge pump. LEGACY COMPONENT DESC: Pump
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 June 2002
Accommodation/Occupational Safety
Issued 2 June 2000
Resolved
REPLACE BROKEN MIRROR IN STARBOARD STATEROOM.
Condition: Unknown
Due 8 June 2000
Resolved 11 July 2000
Electrical
Issued 2 June 2000
Resolved
REPAIR LIGHT FIXTURE IN STARBOARD STATEROOM.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Documentation
Issued 2 June 2000
Resolved
PROVIDE PROOF OF CURRENT DOCUMENTATION.
Condition: Unknown
Due 2 June 2000
Resolved 21 June 2000
Construction/Loadline
Issued 2 June 2000
Resolved
LABEL EMERGENCY ESCAPE HATCHES IN PORT AND STARBOARD STATEROOMS.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Lifesaving
Issued 2 June 2000
Resolved
PASSENGER CARRYING CAPACITY REDUCED TO 29 UNTIL 21 ADULT LIFE PRESERVERS ARE REPAIRED/REPLACED.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Accommodation/Occupational Safety
Issued 2 June 2000
Resolved
TIGHTEN ALL RAILS ON BOTH DECKS.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Navigation
Issued 2 June 2000
Resolved
PROVIDE NEW NAVIGATION RULES.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Lifesaving
Issued 2 June 2000
Resolved
PROVIDE NEW LIFERING.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Engineering
Issued 2 June 2000
Resolved
ADJUST STARBOARD SHAFT PACKING.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Construction/Loadline
Issued 2 June 2000
Resolved
ADJUST HIGH BILGE ALARM IN LOWER DECK PASSAGEWAY.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Electrical
Issued 2 June 2000
Resolved
REPAIR LIGHT FIXTURE IN STARBOARD STATEROOM BATHROOM.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Construction/Loadline
Issued 2 June 2000
Resolved
RELABEL WTD LEADING TO ENGINEROOM TO READ, "MUST BE KEPT CLOSED AT ALL TIMEWHILE UNDERWAY".
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Construction/Loadline
Issued 2 June 2000
Resolved
PROVE PROPER OPERATION OF BILGE HIGH LEVEL ALARMS.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Construction/Loadline
Issued 2 June 2000
Resolved
PROVE PROPER OPERATION OF WTD OPEN/CLOSE INDICATORS IN THE WHEELHOUSE.
Condition: Unknown
Due 8 June 2000
Resolved 21 June 2000
Lifesaving
Issued 27 October 1998
Resolved
MAKE VESSEL AVAILABLE FOR UNDERWAY INTERNAL EXAM PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 6 November 1998
Resolved 6 November 1998
Construction/Loadline
Issued 9 June 1998
Resolved
PASSENGERS ARE RESTRICTED FROM TRANSITING THE STARBOARD AIRCASTLE UNTIL THEDAMAGE TO THE STARBOARD GUNWALE REPAIRED AND INSPECTED BY AN ATTENDING USCGG MARINE INSPECTOR.
Condition: Unknown
Due 7 July 1998
Resolved 28 July 1998
Documentation
Issued 9 June 1998
Resolved
VESSEL IS NOT TO OPERATE MORE THAN 1000 FEET FROM SHORE UNTIL A VALID RADIOTELEPHONY SAFETY CERTIFICATE IS ACQUIRED.
Condition: Unknown
Due 7 July 1998
Resolved 28 July 1998
Electrical
Issued 19 May 1997
Resolved
Remove or properly secure wiring over port work bench.
Condition: Unknown
Due 27 May 1997
Resolved 17 July 1997
Accommodation/Occupational Safety
Issued 19 May 1997
Resolved
Install placard at ladder to upper deck stating that not more than 25 persons are allowed.
Condition: Unknown
Due 27 May 1997
Resolved 17 July 1997
Construction/Loadline
Issued 19 May 1997
Resolved
Install securing devices on all escape hatches.
Condition: Unknown
Due 27 May 1997
Resolved 17 July 1997
Construction/Loadline
Issued 19 May 1997
Resolved
Install dead light cover dogs on forward stbd and aft port covers in workshop.
Condition: Unknown
Due 27 May 1997
Resolved 17 July 1997
Construction/Loadline
Issued 19 May 1997
Resolved
Mark/label bilge pump panel located in workshop.
Condition: Unknown
Due 27 May 1997
Resolved 17 July 1997
Electrical
Issued 19 May 1997
Resolved
Install proper cover on overhead switch over port work bench.
Condition: Unknown
Due 27 May 1997
Resolved 17 July 1997
Accommodation/Occupational Safety
Issued 19 May 1997
Resolved
Replace lower portion of middle pilot house window (fractured).
Condition: Unknown
Due 27 May 1997
Resolved 17 July 1997
Electrical
Issued 19 May 1997
Resolved
Properly secure light fixture on the port side of the forward storeroom.
Condition: Unknown
Due 27 May 1997
Resolved 17 July 1997
Construction/Loadline
Issued 7 April 1995
Resolved
RENEW OR REPAIR THE FRACTURED OR DELAMINATED FRAMES ON THE PORT SIDE OF THEENGINE ROOM (2,3,4,AND6).
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Construction/Loadline
Issued 7 April 1995
Resolved
RENEW PLANKING IN KIND AS MARKED DURING INSPECTION, PORT AND STARBOOARD SIDES AT TRANSOM, FORWARD STARBOARD SIDE AND BOTTOM PLANK AT AFT PORT CORNER.
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Construction/Loadline
Issued 7 April 1995
Resolved
RENEW IN KIND FRACTURED AND ROTTED FRAMES LOCATED IN THE FORE PEAK AS MARKED (2 & 3 PORT AND 1,2,&3 STBD).
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Construction/Loadline
Issued 7 April 1995
Resolved
RENEW IN KIND THE DAMAGED WORM SHOE NEAR THE FORWARD END OF THE KEEL.
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Construction/Loadline
Issued 7 April 1995
Resolved
REPAIR DAMAGE TO EXTERIOR OF STEM AS MARKED AND DISCUSSED DURING INSPECTION.
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Construction/Loadline
Issued 7 April 1995
Resolved
RENEW ROTTED FRAME ON PORT SIDE OF ENGINE ROOM, FRAME #8, LAST FRAME NEAR AFT BULKHEAD.
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Construction/Loadline
Issued 7 April 1995
Resolved
RENEW ROTTED PLYWOOD SIDESHELL ROTTED THROUGH TO OUTER PLANKING AFT OF FRAME #8 ON THE PORT SIDE OF THE ENGINE ROOM.
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Construction/Loadline
Issued 7 April 1995
Resolved
RENEW OR REPAIR THE ROTTED FLOOR FRAME (2ND AFT OF FWD BHD) IN MASTERS STATEROOM.
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Construction/Loadline
Issued 7 April 1995
Resolved
RENEW OR REPAIR THE TWO FRACTURED FLOOR FRAMES IN PASSAGE OUTSIDE OF GUEST ACCOMMODATIONS.
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Construction/Loadline
Issued 7 April 1995
Resolved
RENEW IN KIND THE ROTTED PLYWOOD SHELL ON BOTTOM LOCATED BELOW PASSAGE WAY OUTSIDE OF GUEST ACCOMMODATIONS.
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Lifesaving
Issued 7 April 1995
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, CONDUCT UNDERWAY EXAM IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 7 April 1995
Resolved 25 September 1996
Construction/Loadline
Issued 7 April 1995
Resolved
REPAIR ROTTED PLYWOOD SIDESHELL UNDER THE FORWARD PORT BATTERY BOX LOCATED IN THE ENGINE ROOM.
Condition: Unknown
Due 26 December 1995
Resolved 26 December 1995
Construction/Loadline
Issued 7 December 1994
Resolved
COMPLETE OUTSTANDING DRYDOCK ITEMS NOTED DURING THE 07 DECEMBER 1994 DRYDOCK PRIOR TO CARRYING PASSENGERS FOR HIRE.
Condition: Unknown
Due 7 December 1994
Resolved 7 December 1994
Engineering
Issued 21 June 1994
Resolved
PROVIDE 30 X 30 FLAME SCREENS ON ALL FUEL TANK VENT OUTLETS.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Construction/Loadline
Issued 21 June 1994
Resolved
PROVIDE A SCREW DOWN VALVE ON THE BILGE PIPE PENETRATING THE VESSEL'S COLLISION BULKHEAD.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Lifesaving
Issued 21 June 1994
Resolved
PROVIDE PRIMARY LIFESAVING GEAR IAW 46 CFR 180.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Construction/Loadline
Issued 21 June 1994
Resolved
PROVIDE SUFFICIENT FREEING PORTS IAW 46 CFR 171.150.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Engineering
Issued 21 June 1994
Resolved
PROVIDE SUFFICIENT VENTILATION TO THE MACHINERY SPACE IAW 46 CFR 182.20-45
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Construction/Loadline
Issued 21 June 1994
Resolved
MAKE THE VESSEL AVAILABLE FOR DRYDOCK EXAMINATION.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Electrical
Issued 21 June 1994
Resolved
PROVIDE WIRING SPECIFICATION DRAWINGS DESCRIBING THE VESSEL'S ELECTRICAL SYSTEM.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Documentation
Issued 21 June 1994
Resolved
FORWARD RESULTS OF INCLINING STABILITY TESTS TO THE MARINE SAFETY CENTER
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Accommodation/Occupational Safety
Issued 21 June 1994
Resolved
PROVIDE ADEQUATE HANDRAILS (42") ON THE UPPER DECK IAW 46 CFR 177.35
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Documentation
Issued 21 June 1994
Resolved
PROVIDE PLANS TO THE MARINE SAFETY CENTER FOR ENSURING THAT THE VESSEL WILLCOMPLY WITH THE SUBDIVISION AND STABILITY REQUIREMENTS OF 46 CFR 171.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Accommodation/Occupational Safety
Issued 21 June 1994
Resolved
PROVIDE A SECONDARY MEANS OF ESCAPE IN ALL AREAS ACCESSIBLE TO PASSENGERS.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Accommodation/Occupational Safety
Issued 21 June 1994
Resolved
PROVIDE SECONDARY TOILET/WASHROOM FACILITIES.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Construction/Loadline
Issued 21 June 1994
Resolved
CLEAN ALL OIL FROM BILGES.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Electrical
Issued 21 June 1994
Resolved
PROPERLY INSTALL A BLANK IN THE ENGINEROOM BREAKER BOX WHERE A CIRCUIT BREAKER HAS BEEN REMOVED.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Lifesaving
Issued 21 June 1994
Resolved
PROVIDE ADDITIONAL PYROTECHNIC DEVICES REQUIRED BY 46 CFR 180.35.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Lifesaving
Issued 21 June 1994
Resolved
PROVIDE 2 ADDITIONAL TYPE I PFD'S
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Documentation
Issued 21 June 1994
Resolved
PROVIDE A FCC LICENSE FOR OPERATION BEYOND 1000' FROM LAND.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Accommodation/Occupational Safety
Issued 21 June 1994
Resolved
PROVIDE ADEQUATE MEANS TO ENSURE PROPER OPERATION OF THE VESSEL'S MARINE SANITATION DEVICE.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Engineering
Issued 21 June 1994
Resolved
PROVIDE PROPER FIRE IMPINGEMENT BOWLS UNDERNEATH THE VESSEL'S MAIN ENGINE FUEL FILTERS.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Construction/Loadline
Issued 21 June 1994
Resolved
MAKE FORWARD HATCH WATERTIGHT.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Engineering
Issued 21 June 1994
Resolved
PROVIDE SPECIFICATION FOR INSTALLED FUEL TANKS.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Engineering
Issued 21 June 1994
Resolved
PROVIDE PLANS ON MACHINERY AND VENTING SYSTEMS.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994
Fire Fighting
Issued 21 June 1994
Resolved
PROVIDE PROPER FIRE EXTINGUISHERS.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Fire Fighting
Issued 21 June 1994
Resolved
PROVIDE A 5 GPM HAND PUMP
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Fire Fighting
Issued 21 June 1994
Resolved
PROVIDE PROPER HOSE NOZZLES
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Engineering
Issued 21 June 1994
Resolved
PROVIDE MEANS TO REMOTELY SHUT OFF FUEL SUPPLY LINES IAW 46 CFR 182.20- 40(B)(3).
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Construction/Loadline
Issued 21 June 1994
Resolved
PROVIDE 2 FIXED POWER BILGE/FIRE PUMPS (50 GPM) AND PROPER PIPING.
Condition: Unknown
Due 21 June 1994
Resolved 21 June 1994