MAURY USCG vessel records
← All vessels

SEACLIFF

SEACLIFF is a 2009 freight ship. The Coast Guard has recorded 3 inspections in 2018, along with 2 deficiencies and 1 operational control.

Records in 2018. Most recent: inspection, 7 December 2018.

Built
2009
Last inspected
7 December 2018
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.

This record may be incomplete: the most recent inspection recorded for this vessel was 8 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 7 December 2018
Operational controls None recorded without a removal date
Years with a record 1 calendar year (2018)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9553139
1058905
Flag
PANAMA
Maury page id
psix-1058905

Documentation record

Tonnage as PSIX records it17018 - Convention (Subpart B), Gross Ton
10109 - Convention (Subpart B), Net Ton
28343 - Dead Weight, Ton
34753 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page

3 inspections, each with its date, unit and type; 2 deficiencies with the resolution recorded against each; 1 operational control with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report

A report is not offered for this hull. Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 3

7 December 2018 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6591351
29 November 2018 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6589366
20 November 2018 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6584004

Deficiency record · 2

11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 20 November 2018 Resolved
0635- THE RESCUE BOAT LAUNCHING ARRANGEMENTS SHALL BE SUCH THAT THE RESCUE BOAT CAN BE LAUNCHED IN THE SHORTEST AMOUNT OF TIME. THE RESCUE BOAT DAVIT HYDRAULIC PUMP HAS BEEN INOPERABLE SINCE 27JUNE2018, PREVENTING TIMELY LAUNCHING OF THE RESCUE BOAT FOR NEARLY FIVE MONTHS. 74SOLAS(14) III/17.1
Action required: 30 - Ship detained
Resolved 29 November 2018
Resolution: Conditional CSSE Certificate and Condition of Class issued require permanent repairs to rescue boat davit before 28JAN2019. Flag and Class reports attached to Activity 6584004.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 20 November 2018 Resolved
2530- THE COMPANY SHOULD ENSURE THAT THE MASTER IS GIVEN NECESSARY SUPPORT SO THAT THE MASTER'S DUTIES CAN BE SAFELY PERFORMED. COMPANY WAS NOTIFIED BY MASTER ON 27JUNE2018 OF INOPERABLE RESCUE BOAT DAVIT HYDRAULIC PUMP. HOWEVER, THE COMPANY MADE NO NOTIFICATION OF THE NON-CONFORMITY TO FLAG ADMINISTRATION OR CLASSIFICATIONJ SOCIETY, AND DID NOT SCHEDULE THE HYDRAULIC PUMP FOR REPAIR UNTIL NOVEMBER 2018, NEARLY FIVE MONTHS AFTER THE NON-CONFORMITY REPORT FROM THE VESSEL MASTER. 74SOLAS(14) IX/3.1 ISM CODE A/6.1.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2018
Resolution: Flag Administration and Class notifications made to address long-term inoperable hydraulic pump issues for rescue boat davit. Plan for permanent repairs in place.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.