Records in 2011. Most recent: inspection, 15 July 2011.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 6 July 2011
Resolved
Oily Water Seperator is fitted with an unauthorized fitting on the overboard side of the 3-way valve that could possible allow for bypassing OCM. Class should either approve fitting or have vessel return to original/approved piping arrangement. MARPOL Annex I/14
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2011
Resolution: NKK survey : The fitting between the 3 way valve and the ovbd valve was removed then the 3 way valve and ovbd dishcarge valve were directly connected by pipes without branch piping. OWS, OCM and 3 way valve foudn to be in order.
Lifesaving › Lifeboat › Hull
Issued 6 July 2011
No resolution recorded
Vessel's starboard lifeboat on the port quarter where the boat met the cradle/support blocks has been damaged to an extent that the fiber glass is showing through the gel coating. Class is required to verify integrity of boat or verify boat is fixed to their satisfaction. SOLAS (2009) III/20.2
Action required: 17 - Rectify deficiencies prior to departure
Resolution: NKK: The boat cannot be repaired while on board the vessel, however, a hose test was performed and no leaks were present and therefore is fit for service.
Lifesaving › Inflatable Liferafts › Container Construction
Issued 6 July 2011
Resolved
Vessel's starboard side liferaft is no longer completely sealed due to missing straps on its outboard side. Liferaft servicing is required to ensure contents are not damaged and to return liferaft to its original state. SOLAS (2009) III/20.2 (50a)
Action required: 705 - Other - as specified
Due 6 August 2011
Resolved 8 July 2011
Resolution: Liferaft is in proper condition and is fit for service.
Fire Fighting › Firemans Outfit › Protective Clothing
Issued 6 July 2011
Resolved
Vessel's firesuits have multiple holes in them, rendering them ineffective for protecting those that would be wearing them. Firesuits shall be replaced and verified by class. F.S.S.3.2.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2011
Resolution: NKK: New firesuits have been provided to the vessel.
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 6 July 2011
Resolved
Crew has been using the area behind the main E/R control panel as a storage space for flammable and non flammable items. This presents both a fire hazard and electrocution hazard. Crew should relocate storage to another area to class societies satisfaction. SOLAS (1997) II-1/45.2
Action required: 705 - Other - as specified
Due 14 July 2011
Resolved 8 July 2011
Resolution: NKK: Things were removed from behind the electrical panel.
Navigation › Piloting/Steering › Marine Charts
Issued 6 July 2011
Resolved
Passage Plan from San Pedro to Yonkers was not complete and missing info as per IMO Resolution A.893(21). Vessel must prepare plans in accordance with the resolution. STCW A.VIII/2 (To flag satisfaction)
Action required: 705 - Other - as specified
Due 14 July 2011
Resolved 14 July 2011
Resolution: The master of the vessel completed the passage plan concerend was completed with the further information required by IMO RES. specified.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 6 July 2011
Resolved
Mixed garbage was found on poop deck. Plastic was mixed with acc trash. Vessel must seperate acc trash as per vessels waste management plan. MARPOL Annex V/9.2 (Correct to flag satisfaction)
Action required: 705 - Other - as specified
Due 14 July 2011
Resolved 14 July 2011
Resolution: Rcvd report from flag that garbage on poop deck was correctly seperated in accordance with Waste Management Plan.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 6 July 2011
Resolved
No smoke or heat testing device is provided for detection. Detection devices must be a type that can be tested for correct operation and tested to normal surveillance without the renewal of any components. Vessel is using a can of burning rags for resting of smoke and a lighter for testing of heat, which could damage detectors. F.S.S.9.2.3.1.5 (Class to verfiy proper testing equipment is on board)
Action required: 705 - Other - as specified
Due 14 July 2011
Resolved 8 July 2011
Resolution: Recieved flag report that proper testing equipment was ordered 08-Jul 2011
Operations/Management › Drills/Instruction › Not Conducted
Issued 6 July 2011
Resolved
No QI notification was made by vessel. (VRP requirment) Vessel is to make notification to QI as per non-tank VRP. 33CFR155.1045
Action required: 17 - Rectify deficiencies prior to departure
Due 7 July 2011
Resolved 7 July 2011
Resolution: Vessel made QI notification before inspectors departed the vessel.