← All vessels
XENA
XENA is a 2007 tank ship. The Coast Guard has recorded 26 inspections since 2010, most recently in October 2025, along with 6 deficiencies and 8 operational controls.
Records from 2010 to 2025. Most recent: inspection, 25 October 2025.
- Built
- 2007
- Last inspected
- 25 October 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 6 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9360958 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
3EIU8
1060946
Flag
PANAMA
—
Maury page id
psix-1060946
Inspections, by type
…with no type recorded6
Years with a record
13 calendar years (2010–2025)
The 26 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it25359 - Displacement, Metric Ton
11733 - Convention (Subpart B), Gross Ton
19980 - Dead Weight, Metric Ton
6321 - Convention (Subpart B), Net Ton
11733 - Convention (Subpart B), Gross Ton
19980 - Dead Weight, Metric Ton
6321 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 26
25 October 2025
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8258618
26 September 2025
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8239891
17 September 2024
COC-TVE Annual · PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8001193
14 December 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7839152
3 August 2023
Administrative Inspection · COC-CHEM Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7759912
20 April 2023
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7672156
10 November 2022
In-Service Inspection · Ballast Water Examination · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7592854
27 October 2022
COC-CHEM & TVE Annual · PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7582738
2 July 2021
PSC B · COC-CHEM Renew
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7236271
30 October 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7087295
28 February 2020
Deficiency Check · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6917866
29 December 2019
COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6877238
24 June 2018
COC-CHEM & TVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6451734
14 June 2017
Ballast Water Examination · ISPS II Exam · COC-CHEM & TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6175532
15 December 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6058408
13 December 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6057096
10 December 2016
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6055669
22 July 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5949684
14 July 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5940392
7 July 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5932446
29 June 2016
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5923523
16 March 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5833266
8 March 2016
ISPS III Exam · PII Safety Exam · COC-CHEM & TVE Annual · Ballast Water Examination
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5829164
6 January 2012
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4221800
25 July 2011
COC-CHEM Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4093401
29 September 2010
Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3860439
Deficiency record · 6
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 26 September 2025
Resolved
In tankers, isolation valves shall be fitted in the fire main at the poop front in a protected position and on the tank deck at intervals of not more than 40 meters. to preserve the integrity of the fire main system in case of fire or explosion. PSCO observed the 02 forwardmost foam main isolation valves not fully isolating the foam main on cargo deck. Prior to loading flammable cargoes, vessel shall provide class report attesting to the functioning of foam main isolation valves.
74 SOLAS (2004) II-2/10.2.1.4.4
ac
14 - Pollution Prevention › 146 - MARPOL Annex VI › Type approval certificate of incinerator
Issued 27 October 2022
Resolved
Except as provided in paragraph 6.2 of this regulation, each incinerator on a ship constructed on or after 1 january 2000 or incinerator that is installed onboard a ship on or after 1 January 2000 shall meet the requirements contained in appendix IV of this annex. The ship's incinerator is missing a portion of its refractory on the forward end of the upper chamber.
MARPOL Consolidated 2011, Annex VI Reg. 16.6.2
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 27 October 2022
Resolved
Operate a ballast water management that has been approved by the Coast Guard under 46 CFR 162. The version onboard at the operations manual is Rev. 1 4/25/2019 when the correct operations manual is revision 5.
33 CFR 151.2025(a)(1)
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 29 December 2019
Resolved
For ships constructed on or after 1 July 2014, a minimum of two two-way portable radiotelephone apparatus for each fire party for fire-fighter's communication shall be carried on board. Those two-way portable radiotelephone apparatus shall be of an explosion-proof type or intrinsically safe. Ships constructed before 1 July 2014 shall comply with the requirements of this paragraph not later than the first survey after 1 July 2018. Fire parties are not provided with portable radios.
74SOLAS (CONSL 14) II-2/10.4
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 December 2019
Resolved
The following functional requirements shall be met: escape routes shall be maintained in a safe condition, clear of obstacles. the marked emergency escape route from the galley to the port weather deck was blocked by debris and trash cans.
74SOLAS(CONSL 04) II-2/13.1
Electrical › Electric Generation Source (service) › Generator
Issued 29 September 2010
Resolved
Vessel reported that the number three Generator is "out of order". Vessel has two fully operational Generators and the Emergency Generator is also fully operational. Vessel plans are for parts to arrive in Houston and proper repairs be made prior to departure from Houston.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.