GLOBAL LONG BEACH is a 2010 tank barge. The Coast Guard has recorded 21 inspections since 2010, most recently in October 2025, along with 24 deficiencies, 2 operational controls and 1 casualty investigation in 2016.
Records from 2010 to 2025. Most recent: inspection, 29 October 2025.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
The counts in the strip above are the same counts; this table splits the inspections by
the kind of activity recorded. A blank resolution means none was recorded in this data; it
does not establish that a deficiency is outstanding. Years with a record are calendar
years in which a record exists, not years in service.
What Maury does not do.
Documentation record
Registered dimensions (L × B × D)182.4 ft × 46.0 ft × 15.0 ft
Registered tonnagegross 1,005 / net 305
ITC dimensions (L × B × D)182.4 ft × 46.0 ft × 15.0 ft
ITC tonnagegross 1,005 / net 305
BuilderTRINITY MARINE PRODUCTS, INC PLANT 38 · MADISONVILLE, LA, UNITED STATES · built 2010
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portLOS ANGELES, CA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 18 December 2025 · expires 31 January 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1005 - Convention (Subpart B), Gross Ton 305 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
What it gives that this page does not: the whole record in one
dated, citable document — every line with its Coast Guard activity id, the retrieval
date on the cover, built to print to PDF with its page breaks — that a surveyor can
attach and a lender can file. The same facts as this page, complete and in one file.
Every recorded inspection, 1972 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
A request, not a checkout: leave an email and Maury replies once, with
the dated document for this hull and a Stripe invoice for $299. Nothing is charged before
the document is in your hands.
Used only to answer this request.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 February 2025Resolved
Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station, conspicuously marked, and located at the midpoint of such vessel, or 100 feet from the engine, whichever is the more practical. The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine (such as by cutting off the intake air). MI did not witness satisfactory shutdown of the port internal combustion engine driven cargo pump. 46 CFR 32.50-35 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 March 2025
Resolved 17 April 2025
Resolution: Satisfactory witnessed the shutdown of the port cargo engine.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 24 October 2023Resolved
Each hose also must be marked with the following, except that the information required by paragraphs (f)(2) and (3) of this section need not be marked on the hose if it is recorded in the hose records of the vessel or facility, and the hose is marked to identify it with that information:
(1) Maximum allowable working pressure;
(2) Date of manufacture; and
(3) Date of the latest test required by 33 CFR 156.170.
Annual hose pressure test certificate did not have serial numbers listed to identify which hose was tested. MI was unable to determine which hose was tested. A single 4" hose on deck was found with a test date of OCT 2020.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2023
Resolved 17 November 2023
Resolution: Vessel rep created a hose log and properly labeled cargo hoses.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 17 January 2023Resolved
All tank vessels are subject to the regulations contained in sub chapter F.
All Pressure vessels other than unfired steam boilers shall be protected by pressure-relieving devices that will prevent the pressure from rising more than 10 percent above the maximum allowable working pressure.
Vessel did not have correct size pressure relief valve installed on the pressure vessel.
46CFR54.15-5(c)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 January 2023
Resolved 18 January 2023
Resolution: Operator installed new 175 PSI pressure relief valve and conducted satisfactory operation test.
The OCMI will inspect a tank vessel once every 5 years. The vessel is past due for it's 5 year inspection and must undergo a full COI inspection prior to carriage of cargo.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 December 2020
Resolved 16 November 2020
Resolution: Conducted satisfactory COI inspection.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 5 November 2020Resolved
The overfill alarm must - Activate a visible and audible alarm so that it can be heard on the vessel where cargo transfer is controlled and in the cargo deck area. The visible alarm was non-functional when testing the cargo tank overfill alarms.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2020
Resolved 6 November 2020
Resolution: Overfill visual and audible alarms operate normally. Visual alarm required a new light.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 5 November 2020Resolved
The aggregate capacity of the electric ship's service generating sources required in 111.10-3 must be sufficient for the ship's service loads. The vessels Generator is in a reverse power setting and needs to be troubleshot to determine the cause of the dangerous electrical condition.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2020
Resolved 16 November 2020
Resolution: Replaced wire block inside generator. Ops checked good.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Minimum requirements)
Issued 5 November 2020Resolved
Oil barges of less than 400ft must carry - Non-sparking hand scoops, shovels, and buckets: The vessel has an aluminum design shovel in their SOPEP kit which need to be replaced with a non-sparking shovel.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 November 2020
Resolved 16 November 2020
Resolution: Non-sparking shovel replaced into the vessels SOPEP.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 October 2020Resolved
2. Re-weld the gauging tree to the upper portion/overhead of the #2 port side cargo tank prior to receiving credit dry dock.
Action required: 705 - Other - as specified
Due 21 October 2020
Resolved 5 November 2020
Resolution: gauging tree to the upper portion/overhead of the #2 port side cargo tank satisfactorily welded and verified by ABS. Photos were sent as evidence. An ABS report will be available for review in the near future and uploaded to the vessels files.
Tank Vessel must complete a satisfactory internal structural exam to the satisfaction of the attending marine inspector. Prior to the carriage of cargo.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 November 2018
Resolution: Completed satisfactory ISE.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 19 January 2018Resolved
Installed shutdowns on CO2 system fouled.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 February 2018
Resolved 26 January 2018
Resolution: Received report from Global F&S
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 8 December 2016Resolved
Provide information showing that the air reciever is in accordance with 46 CFR 54.
Due 8 January 2017
Resolved 12 January 2017
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 13 October 2015Resolved
Provide a Cargo Authority Attachment. Vessel to submit ABS approved VCS plans to MSC for review and issuance of valid CAA.
Condition: Invalid
Action required: 705 - Other - as specified
Due 13 January 2016
Resolved 12 February 2016
Resolution: Vessel Submitted proper documentation to MSC; MSC issued CAA for vessel.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 20 November 2014Resolved
Install vapor connection flange so that stud is located at the top of the flange, midway between bolt holes IAW 46 CFR 39.20-1(e).
Action required: 705 - Other - as specified
Due 4 December 2014
Resolved 2 December 2014
Resolution: Valve rotated so VCS stud is in the 12 oclock position
Pollution Prevention/Response › Response Equipment › Non-sparking Hand Scoops/Shovels/Buckets
Issued 20 November 2014Resolved
Provide complete oil pollution clean up kit IAW 33CFR155.210.
Action required: 705 - Other - as specified
Due 4 December 2014
Resolved 2 December 2014
Resolution: Pollution clean up kit installed on vessel
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 7 November 2013Resolved
Provide a calibration certificate for all vapor control system gauges.
Action required: 705 - Other - as specified
Due 20 December 2013
Resolved 17 January 2014
Resolution: Received report via email. Scanned to Docs.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 7 November 2013Resolved
Label all switches on circuit breakers.
Action required: 705 - Other - as specified
Due 14 November 2013
Resolved 6 December 2013
Resolution: Circuit breakers properly labeled.
Construction/Loadline › Hull › Weld
Issued 7 November 2013Resolved
Identify source of cargo fuel leak in 1P cargo tank. Crop and renew all damaged welds in way of 1P & 2P cargo tanks. Vessel is permitted a one time cargo transfer (load & unload) within the breakwater. Vessel may not make any other cargo transfers until repair is made to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 13 November 2013
Resolved 13 November 2013
Resolution: See activity 4752589
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 16 November 2012Resolved
Stencil # 1 Cargo hose with Service date.
Action required: 705 - Other - as specified
Due 14 December 2012
Resolved 14 December 2012
Resolution: Def cleared
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 16 November 2012Resolved
Stencil #3 Cargo Hose with service date.
Due 14 December 2012
Resolved 14 December 2012
Resolution: Def cleared
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 16 November 2012Resolved
Replace Fire Extinguisher on Port Side. Corrected on the spot
Action required: 705 - Other - as specified
Due 16 November 2012
Resolved 16 November 2012
Resolution: Corrected on the spot
Vsl to provide a SOPEP approval letter prior to conducting cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2010
Resolved 2 March 2011
Resolution: SOPEP letter has been viewed and verified as correct.
22 December 2016Routine · role: Involved in a Marine Casualty · activity 6061442
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.