Records from 2017 to 2021. Most recent: inspection, 14 May 2021.
Inspection history · 5
14 May 2021
Deficiency Check
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 7196720
12 May 2021
Administrative Inspection
Administrative · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 7195005
9 November 2020
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7092646
26 October 2020
Administrative Inspection · PSC B
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7084198
20 August 2017
ISPS II Exam · Ballast Water Examination · PII Safety Exam · COE-Offshore
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6240302
09 - Working and Living Conditions › 092 - Working Conditions › Other (mooring)
Issued 28 October 2020
Resolved
Ships Shall be provided with arrangements, equipment, and fittings of sufficient safe working load to enable the safe conduct of all... mooring operation of the ship. multiple mooring lines were damaged enough to expose the inner core of the mooring line compromising the structural integrity of the line.
74SOLAS(14)II-1/3-8.2
Condition: Damaged By Earlier Event
Action required: 15 - Rectify deficiencies by next port
Due 4 November 2020
Resolved 9 November 2020
Resolution: Received report and photographs of new mooring lines.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 October 2020
Resolved
The doors shall be self closing and be capable of closing with an angle of inclination of up to 35degree opposing closure. vessel had an A/C room with a class A door tied open
74SOLAS(14) II-2/9.4.1.1.5.1
Action required: 10 - Deficiency Rectified
Due 28 October 2020
Resolved 28 October 2020
Engineering › Diesel Engine (propulsion-reduction gear) › Seal
Issued 20 August 2017
Resolved
1499-Other (Prop & Aux Machinery)-The arrangements for the storage, distribution and utilization of oil used in pressure lubrication systems shall be such as to ensure the safety of the ship. PSCO observed tarp on port side of the MDE with evidence of oil leak from shaft. Oil was also observed on the bilge. 74 SOLAS (2014) II-2 / 4.2.3.1 17ac
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 September 2017
Resolved 14 May 2021
Resolution: Vessel provided Class Report which allows them till 21SEP17 to resolve this deficiency.
Operations/Management › Ballast Water Managment › Alternative Management Method
Issued 20 August 2017
Resolved
9900-Other (not clearly hazardous)-The Master, owner, operator, agent or PIC of a vessel equipped with ballast tanks that operates in the waters of the US must employ one of the ballast water management methods listed IAW 33 CFR 151.2025.
Action required: 705 - Other - as specified
Resolved 14 May 2021
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 20 August 2017
Resolved
9900-Other (not clearly hazardous)-Each transfer piping system on board must be tested under static liquid pressure at least 1.5 times the maximum allowable working pressure annually. Vessel could not provide records for hydrostatic testing of bunker lines. Bunker lines must be tested prior to bunkering in the United States. 33 CFR 156.170 (f) c
Action required: 703 - Prior to bunkering operations
Resolved 14 May 2021