MAURY USCG vessel records Sign in
← All vessels

EPOS

EPOS is a 2010 freight ship. The Coast Guard has recorded 16 inspections since 2011, most recently in April 2026, along with 8 deficiencies and 1 operational control.

Records from 2011 to 2026. Most recent: inspection, 21 April 2026.

Built
2010
Last inspected
21 April 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9557135 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
1064306
Flag
LIBERIA
—
Maury page id
psix-1064306

Inspections, by type

…with no type recorded4
Years with a record 8 calendar years (2011–2026)
The 16 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it32839 - Convention (Subpart B), Gross Ton
19559 - Convention (Subpart B), Net Ton
58020 - Dead Weight, Metric Ton
68970 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 16

21 April 2026 PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8353212
31 March 2023 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7656305
4 August 2022 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7524403
4 August 2022 Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7524579
3 August 2022 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7531848
7 April 2022 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7427706
16 August 2021 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7288709
7 August 2021 PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7275401
3 August 2021 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7276205
20 July 2018 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6484379
24 February 2016 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5821648
22 February 2016 ISPS II Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5819515
30 November 2015 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5768545
5 October 2015 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5730783
25 September 2011 Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 4153558
23 September 2011 Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 4152394

Deficiency record · 8

04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 31 March 2023 Resolved
Muster and embarkation shall be adequately illuminated by lighting supplied from the emergency source of electrical power required by regulation II01/42 oe II-1/43 as appropriate. PSCO observed multiple emergency lights out throughout the decks. Rectify deficiency to the satisfaction of class.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 April 2023
Resolution: Received class report from DNV satisfying the deficiency rectification.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 July 2018 Resolved
The machinery...associated piping systems, and fittings shall be of a design and construction adequate for the service for which they are intended. A soft patch and welding was discovered on the main cooling seawater pump piping near the central cooler. The crew stated the repair was made due to a leak after 29JUN18 and has not made any report of the repair. 74 SOLAS (14) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2018
Resolved 25 July 2018
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 20 July 2018 Resolved
The machinery boilers, associated piping and fittings...shall be installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to hot surfaces and other hazards. The turbo casing leading from the generators to the exhaust is exposed without lagging, presenting a burn hazard. Additionally, a portion of grating near the boiler operating panel has been removed, presenting a falling hazard. 74 SOLAS (14) II-1/26.1
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2018
Resolved 25 July 2018
Engineering › Bilge Water Management System › Piping
Issued 5 October 2015 Resolved
The arrangement of the bilge and ballast pumping system shall be such as to prevent the possibility of water passing from the water ballast spaces into the cargo and machinery spaces, or from one space to another. Bilge piping system had several leaks and created improper pressure on the system. 40ac (to satisfaction of Class and USCG)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 October 2015
Resolved 30 November 2015
Resolution: One leaky pipe on top of the bilge transfer pump was removed and fitted with an acceptable steel pipe. The bilge system was then retested and found satisfactory.
Engineering › Bilge Water Management System › Piping
Issued 5 October 2015 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Bilge system non return valve was found clogged. 40ac (to satisfaction of Class and USCG)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 October 2015
Resolved 30 November 2015
Resolution: The non-return valve was overhauled and cleaned and tested satisfactorily.
Engineering › Fuel Oil Service System › Heater
Issued 5 October 2015 Resolved
Every steam pipe and every fitting connected thereto through which steam may pass will be designed, constructed, and installed as to withstand the maximum working stresses to which it may be subjected. Steam lines in the fuel oil purifier room were leaking and corroded. 40ac (to satisfaction of Class and USCG)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 October 2015
Resolved 30 November 2015
Resolution: A new threaded pipe connection was fitted to replace the corroded portion of the pipe. The steam system was then tested satisfactorily to a pressure of 5 bar.
Fire Fighting › Combustible Materials › Insulation
Issued 5 October 2015 Resolved
Insulating materials shall be noncombustible. Fire protective insulation was found soaked in sludge that was above the incinerator. 40ac (to satisfaction of Class and USCG)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 October 2015
Resolved 30 November 2015
Resolution: The oil-stained insulation above the incinerator was renewed/cleaned and all sagging/hanging insulation was secured.
Construction/Loadline › Markings › Load Line Mark
Issued 23 September 2011 Resolved
The ring, lines, and letters shall be painted in white or yellow on a dark background. The color of the deck line is the same color as the hull.
Action required: 15 - Rectify deficiencies by next port
Resolved 25 September 2011
Resolution: The deck line was painted a contrasting color. Defeciency is rectified.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.