MAURY USCG vessel records
← All vessels

SEA LA BAMBA

SEA LA BAMBA is a 2009 tank ship. The Coast Guard has recorded 21 inspections since 2017, most recently in August 2026, along with 40 deficiencies and 8 operational controls.

Records from 2017 to 2026. Most recent: operational control imposed, 14 August 2026.

Built
2009
Last inspected
14 August 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 14 August 2026
…with no type recorded4
Operational controls None recorded without a removal date
Years with a record 8 calendar years (2017–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9470909
1064985
Flag
LIBERIA
Maury page id
psix-1064985

Documentation record

Tonnage as PSIX records it56300 - Displacement, Metric Ton
46093 - Dead Weight, Metric Ton
29130 - Convention (Subpart B), Gross Ton
12052 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 21

14 August 2026 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8464238
1 August 2026 COE-Administrative
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8452002
17 May 2026 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8375205
2 March 2026 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8318953
26 October 2025 PSC B · COC-CHEM & TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8254817
8 December 2023 COC-CHEM & TVE Renew · PSC B · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7831940
19 July 2023 PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7746068
30 December 2022 Administrative Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7614605
14 December 2022 COC-CHEM & TVE Annual · PSC A
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7605104
8 October 2022 In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7574042
7 September 2022 MARPOL Annex I Examination · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7553932
7 January 2022 Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7376793
14 October 2021 COC-CHEM & TVE Renew · PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7331139
31 May 2020 PSC B · COC-CHEM & TVE Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6963966
30 April 2020 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6946187
31 March 2020 Administrative Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6931900
19 September 2019 Administrative Inspection
Administrative · USCG Northeast District (dp) · USCG Northeast District (CGD-NE) · Activity 6815686
20 April 2019 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6666654
16 April 2019 Ballast Water Examination · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6660435
24 February 2017 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6094213
9 February 2017 COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6082315

Deficiency record · 40

07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 8 December 2023 Resolved
Tankers required to be fitted with inert gas systems shall comply with the following provisions where double hull spaces are not permanently connected to an IG systems, appropriate means shall be provided to allow connection to the IG main. Prior to carrying cargo requiring inerting, provide cross connection equipment for double hull spaces to IG system including spare venting equipment. 74 SOLAS (2020)/II-2/4.5.5.1.4.3
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 15 December 2023
Resolution: PSC NOLA received proper documentation from the master satisfying the requirement.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 14 December 2022 Resolved
Means shall be provided to control leaks of flammable liquids. SSDG fuel gallery drains were clogged causing LSMGO seepage to accumulate in all three generators 74 SOLAS (09) II-2/4.1.1
Condition: Design Flaw
Action required: 15 - Rectify deficiencies by next port
Resolved 31 December 2022
Resolution: Washer seals and rings replaced, monitoring of leaks and regular PMS reinforced.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 December 2022 Resolved
No electrical equipment shall be installed in any space where flammable mixtures are liable to collect. The explosion proof light in the starboard deck storage was found with a cracked lens 74 SOLAS (04) II-1/45.10
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 31 December 2022
Resolution: Light electrically isolated until full replacement available.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 December 2022 Resolved
Suitable marked decontamination showers and an eyewash shall be available on deck in convenient locations. The showers and eyewash shall be operable in all ambient conditions. PSCO observed inoperable STBD side eyewash due to clogged nozzle. 74 SOLAS (20) VII/10.2 IBC 14.3.4
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 14 December 2022
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 December 2022 Resolved
Every steam pipe and every fitting connected there to through which steam may pass shall be so designed, constructed and installed as to withstand the maximum working stresses to which it may be subjected. PSCO observed wastage throughout entire cargo steam pipe system, rendering it unusable 74 SOLAS (04) II-1/33.1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 December 2022
Resolution: Maintenance schedule created and replacement of pipe begun. No cargo which requires heating will be carried until full repairs complete.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 14 December 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the code. The #6 STBD hydraulic cargo pump pressure indicator was not reading the applied pressure 74 SOLAS (20) VII/10.1 IBC 1.5.3.1
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 December 2022
Resolution: New pressure indicator supplied.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 14 December 2022 Resolved
Stowage of cargo samples: The stowage space shall be cell divided in order to avoid shifting of the bottles at sea. The listed Annex II sample storage area was observed containing mostly Annex I products but was filled with broken glass and cargo residue, should be cleaned before carriage of Annex II cargo 74 SOLAS (20) VII/10.1 IBC 16.5
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 December 2022
Resolution: Sample stowage locker cleaned.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 14 December 2022 Resolved
Painted in a sequence of red/yellow/red and vapor connection flange must have a permanent stud protruding outward. PSCO observed vapor connection flange removed and replaced with a cargo reducer flange connected to terminal vapor line 46 CFR 39.2001 (h)(1) & (j)
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 December 2022
Resolution: New stud installed on vapor line.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 October 2022 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. The design shall have regard to materials used in construction, the purpose for which the equipment is intended, the working conditions to which it will be subjected and the environmental conditions on board. Vessel reported failure of Main Engine (ME) electronic governor. ME unable to maintain speed less than 57rpm, required for Slow and Dead slow speeds, when operating from Bridge and Engine Control Room (ECR). Ability to control ME from local control station is satisfactory. 74 SOLAS(20)II-1/26.1
Action required: 17 - Rectify deficiencies prior to departure
Due 7 November 2022
Resolved 8 October 2022
Resolution: Reviewed class report attesting to repairs and proper function of Main Engine.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 7 September 2022 Resolved
Lifeboats shall be provided with at least one drain valve fitted at the lowest point of the hull and shall automatically open to drain water when the hull of the lifeboat is not waterborne and shall close automatically to prevent the entry of water when the lifeboat is waterborne. During Port State Control exam, PSCOs observed the lifeboat's drain ball was not watertight due to the corrosion from the oil leaking into the bilge of the lifeboat from the lifeboat engine. 74SOLAS(20) CH. III REG 20.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 7 September 2022 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. During Port State Control exam, PSCOs observed the starboard lifeboat shaft seize and when further run ahead, the snap ring holding the shaft bearing in place was broken. 74SOLAS(20) CH. III REG 31.1.1.1 LSA CODE 4.4
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 7 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship pr persons on board. During Port State Control exam, PSCOs observed the self-closing fire door between the engine room and the crew change out room did not self close. 74SOLAS(20) CH. 1 Reg 11
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 7 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship pr persons on board. During Port State Control exam, PSCOs observed the self-closing fire door between the passageway and the crew change out room leading to the engine room did not self close. 74SOLAS(20) CH. 1 REG 11
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 7 September 2022 Resolved
After any survey of the ship under regulations 7, 8, 9, or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without sanction of the Administration. During Port State Control exam, PSCOs observed after-market hold-backs installed for the self-closing fire door between the steering gear room and the escape hatch. 74SOLAS(20) CH. 1 REG 11
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 7 September 2022 Resolved
After any survey of the ship under regulations 7, 8, 9, or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without sanction of the Administration. During Port State Control exam, PSCOs observed after-market hold-backs installed for the self-closing fire door between the boiler flat and the escape hatch. 74SOLAS(20) CH. 1 REG 11
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea without danger to the ship pr persons on board. During Port State Control exam, PSCOs observed that the primary bilge pump was unable to transfer oily residue from the bilge to the bilge holding tank in an effective manner, such that the bilge pump was operated for 10 minutes and nearly no residue was removed from the bilge pocket. 74SOLAS(20) CH. 1 REG 11 Action Code: 30ac
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 7 September 2022
Resolved 16 September 2022
Resolution: Observed satisfactory operation of the bilge pump from the aft bilg well to the bilge holding tank. Pump transferred approx .54 cubic meters in 8 minutes. Received satisfactory RO report.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Construction (including exempt.)
Issued 7 September 2022 Resolved
Whenever an accident occurs to a ship or a defect is discovered, either of which affects the safety of the ship or efficiency or completeness of its equipment, the master or owner of the ship shall report at the earliest opportunity to the Administration, the nominated surveyor or recognized organization responsible for issuing the relevant certificate, who shall cause investigations to be initiated to determine whether a survey, as required by regulations 7, 8, 9 or 10 is necessary. During Port State Control exam, PSCOs observed that the vessel's RO was unaware of the inoperable bilge system. 74SOLAS(20) CH. 1 REG 11
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 7 September 2022 Resolved
Each operation for the collection and disposal of oil residues (sludge) and discharge overboard or disposal otherwise of bilge water which has accumulated in machinery spaces shall be fully recorded without delay in the Oil Record Book Part 1 so that all entries in the book appropriate to that operation are completed. During Port State Control exam, PSCO's initial review of the Oil Record Book Part 1 from 30APR2022 through 07SEP22 observed over 30 cubic meters of oil residue were improperly accounted for. MARPOL ANNEX I REG 17.4
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 7 September 2022 Resolved
The company should establish procedures to ensure the ship is maintained in conformity with the provisions of the relevant rules and regulation. Overall condition of the vessel indicates that the procedures in place to maintain the ship in conformity within regulation are insufficient to maintain the ship in conformity with applicable regulations. An external ISM audit pertaining to the survey and maintenance of the proper operation of the ship's equipment to at least include piping, oily residue management, and communication with the company for maintenance needs is required. 74SOLAS(20) CH. IX REG 3 ISM CODE REG 10
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 7 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During Port State Control exam, PSCOs observed that the port gray water overboard skin valve leaked sea-water. 74SOLAS(20) CH. 1 REG 11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 7 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During Port State Control exam, PSCOs observed that the starboard gray water overboard skin valve leaked sea-water. 74SOLAS(20) CH. 1 REG 11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 7 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During Port State Control exam, PSCOs observed that the sewage holding tank isolation valve leaked sewage. 74SOLAS(20) CH. 1 REG 11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
09 - Working and Living Conditions › 091 - Living Conditions › Drainage
Issued 7 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During Port State Control exam, PSCOs observed that the port side gray water overboard line was severely clogged. 74SOLAS(20) CH. 1 REG 11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 September 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 7 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During Port State Control exam, PSCOs observed that the MDO Service Tank remove level indicator alarm showed that the tank was at "Low Level" but the analog level indicator and manual soundings indicated it was not at low level. 74SOLAS(20) CH. 1 REG 11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 October 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
09 - Working and Living Conditions › 092 - Working Conditions › Ventilation (Working spaces)
Issued 7 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During Port State Control exam, PSCOs observed that the CO2 room ventilation fan switch was inoperable and did not start the fan. 74SOLAS(20) CH. 1 REG 11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 October 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 September 2022 Resolved
Electrical installations shall be such that the safety of the crew and ship from electrical hazards will be ensured. During Port State Control exam, PSCOs observed the ballast water treatment system cabinet right side door open due to ambient temperature overheating the electrical components, and the left door was closed to maintain the safety shutdown interlock so that the system would continue to run, thereby risking accidental electrical shock to persons on board. 74SOLAS(20) CH. II-1 REG 41
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 October 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 September 2022 Resolved
After survey of the ship under regulation 7, 8, 9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without sanction of the Administration. During Port State Control exam, PSCOs observed two purifiers with the sludge discharge valve removed, hanging by electrical wire, and a spacer installed where the valve should be. Engineers explained that it was modified because the sludge valve kept clogging. 74SOLAS(20) CH. 1 REG 11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 October 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 7 September 2022 Resolved
The equipment shall be maintained to conform with t he provisions of this Annex and no changes shall be made in the equipment, systems, fittings, arrangements or material covered by the survey, without the express approval of the Administration. During Port State Control exam, PSCOs observed that the safety proximity switch on the incinerator garbage dump chamber was tied back with a wire. 74SOLAS(20) CH. 1 45.5.5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 October 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 September 2022 Resolved
Wiring shall be installed and supported in such a manner as to avoid damage. Additionally, terminations and joints in all conductors shall be so made as to retain the original properties of the cable. During Port State Control exam, PSCOs observed numerous wires for the incinerator's automation and operation in disrepair with wires pulled from the sockets, sheathing missing, and junction boxes unsecured on top of the incinerator. 74SOLAS(20) CH. II-1 REG 45.5.5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 October 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 September 2022 Resolved
Wiring shall be installed and supported in such a manner as to avoid damage. Additionally, terminations and joints in all conductors shall be so made as to retain the original properties of the cable. During Port State Control exam, PSCOs observed a cable pulled out of a pump motor junction box. 74SOLAS(20) CH. 1 REG 45.5.5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 October 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 September 2022 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During Port State Control exam, PSCOs observed numerous valve handles missing throughout the engine room. 74SOLAS(20) CH. 1 REG 11
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 October 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 September 2022 Resolved
After survey of the ship under regulation 7, 8, 9 or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without sanction of the Administration. During Port State Control exam, PSCOs observed that a drain line leading to the bilge had a fitting for which the Chief Engineer explained was installed to blow out, with compressed air, the drain line due to corrosion. 74SOLAS(20) CH. 1 REG 11
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 October 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 7 September 2022 Resolved
Maintenance, testing, and inspections of life-saving equipment shall be carried out in a manner having due regard to ensuring the reliability of such appliances. During Port State Control exam, PSCOs observed oil leaking out of the lifeboat engine, to the amount of the lifeboat engine, to the amount that oil was dripping out of the lifeboat's hull drain valve. 74SOLAS(20) CH. III REG 20.3
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 7 October 2022
Resolved 15 September 2022
Resolution: Received satisfactory RO report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 October 2021 Resolved
The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO observed jacket water leak on #5 Cylinder. 74 SOLAS(04) II-1/26.1.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 October 2021
Resolved 18 October 2021
Resolution: Received Class report attesting to repairs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 16 April 2019 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. During abandon ship drill, port lifeboat was lowered to deck B. Port State Control Officers identified frayed and broken (16mm 19x7) wire on the forward most fall.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 18 April 2019
Resolved 27 April 2019
Resolution: Received Class Report attesting to new, suitably certified, wire ropes on the port falls.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 16 April 2019 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. After the wire rope failure on port lifeboat fall was discovered, Port State Control Officers had the starboard lifeboat lowered to deck B. Upon returning the lifeboat to cradle position, the winch-brake remote-release cable parted.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 18 April 2019
Resolved 27 April 2019
Resolution: Received Class Report attesting to new, suitably certified, wire rope on the stbd winch brake remote release cable.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 16 April 2019 Resolved
The company should identify equipment and technical systems the sudden operational failure of which may result in hazardous situations. The safety management system should provide for specific measures aimed at promoting the reliability of such equipment or systems. These measures should include the regular testing of stand-by arrangements and equipment of technical systems that are not in continuous use. Recommend recognized organization conduct external ISM audit of life-saving equipment maintenance procedures.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 May 2019
Resolved 12 May 2019
Resolution: Received ISM Audit from Lloyd's Register. ISM was found satisfactory by Class.
Deck/Cargo › Holds/Tanks › Portable Gas Measuring Equipment
Issued 9 February 2017 Resolved
1840- Instrumentation-Tankers shall be equipped with at least one portable instrument for measuring Oxygen and one for measuring flammable vapor. Annual calibration for meters has not been completed in over 15 months. SOLAS 74 (2014) II-2/4.5.7.1 c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 February 2017
Resolution: Recieved calibration certificates from Gulf Harbor Shipping, New Orleans (local Agent) confirming that all onboard meters had been calibrated and are operating correctly.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 9 February 2017 Resolved
1870- Special Requirements-The inert gas system audible and visual alarms shall be provided based on system design. Audible alarm did not work in Cargo control room. SOLAS 74 (2014) II-2/5.5.3.2 FSS Code 15.2.2.4.5.1 10c
Action required: 705 - Other - as specified
Due 23 February 2017
Resolved 9 February 2017
Resolution: Recieved calibration certificates from Gulf Harbor Shipping, New Orleans (local Agent) confirming that all onboard meters had been calibrated and are operating correctly.
Operations/Management › EPA Vessel General Permit (VGP) › 2.2.3.2-Ballast Water Management Plans
Issued 9 February 2017 Resolved
9900- Other (clearly not hazardous)-The Master, Owner or operator shall maintain a ballast water plan that specifically addresses the removal of fouling organisms from the hull. PSCO observed excessive growth on hull. 33CFR 151.2050(f) 16a
Action required: 705 - Other - as specified
Due 23 February 2017
Resolved 24 February 2017
Resolution: Recieved class report satisfying the requirements to clear the deficiency

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.