NO. 17

NO. 17 is a 2010 tank barge. The Coast Guard has recorded 33 inspections since 2010, most recently in December 2025, along with 39 deficiencies and 1 casualty investigation in 2021.

Records from 2010 to 2025. Most recent: inspection, 29 December 2025.

Built
2010
Last inspected
29 December 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

1066502
Flag
UNITED STATES
Maury page id
psix-1066502

Inspections, by type

…with no type recorded2
Years with a record 16 calendar years (2010–2025)
The 33 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Documentation record

Registered dimensions (L × B × D)132.0 ft × 30.0 ft × 9.0 ft
Registered tonnagegross 299 / net 299
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMETAL TRADES INC · YONGES ISLAND, SC, UNITED STATES · built 2010
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNORFOLK, VA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 4 August 2025 · expires 30 September 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it299 - Simplified, Gross Ton
299 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.

Inspection history · 33

29 December 2025 Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8286749
15 September 2025 COI Inspection · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8234880
14 January 2025 COI Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 8074757
20 March 2024 Deficiency Check · Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7881873
14 February 2023 Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7636806
2 February 2023 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7630910
6 December 2022 Administrative Inspection · Deadweight Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7604815
29 November 2022 Administrative Inspection · Load Line/Change of Employment
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7601044
13 June 2022 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7476719
19 December 2021 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7370654
18 December 2021 Damage Survey · COI Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7370154
19 August 2020 COI Inspection · Deficiency Check
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7037246
28 July 2020 Administrative Inspection · Examination of Repairs
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7018551
20 February 2020 Drydock Exam · Administrative Inspection · Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6914615
25 September 2019 MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6820397
26 March 2019 Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6649231
18 March 2019 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6644572
10 January 2019 Periodic Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6609669
13 February 2018 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6354278
20 November 2017 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6309790
24 October 2016 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6046214
17 October 2016 Annual Inspection · MTSA Verification
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6023920
30 October 2015 MTSA Verification · COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5754380
20 October 2015 Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5746667
9 September 2014 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4979635
5 September 2014 MTSA Verification · Periodic Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4967394
8 May 2014 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4853340
23 September 2013 Internal Structural Exam · Annual Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4721444
30 November 2012 Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4495203
25 August 2012 Administrative Inspection · Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4421661
24 August 2012 Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4504316
7 October 2011 MTSA Verification · Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 4165296
10 June 2010 Internal Structural Exam · Construction Oversight · Initial Certification · Drydock Exam · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3762662

Deficiency record · 39

14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 29 December 2025 Resolved
33 CFR 155.1060(a)(3) : Shore-based spill management team tabletop exercises, which must be conducted annually. In a triennial period, at least one of these exercises must include a worst case discharge scenario. Vsl unable to produce documentation of tabletop exercise.
Action required: 705 - Other - as specified
Resolved 7 January 2026
Resolution: Vsl provided documentation of worst case spill scenario exercise.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 29 December 2025 Resolved
33 CFR 155.1060(b): Annually, at least one of the exercises listed in § 155.1060(a) (2) and (4) must be unannounced. An unannounced exercise is one in which the personnel participating in the exercise have not been advised in advance of the exact date, time, and scenario of the exercise. Vsl unable to produce documentation of unannounced response plan exercise.
Action required: 705 - Other - as specified
Resolved 6 January 2026
Resolution: completed exercise on 2JAN26; cleared.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 29 December 2025 Resolved
33 CFR 155.1060(a)(4): Oil spill removal organization equipment deployment exercises, which must be conducted annually. Vsl unable to produce documentation of equipment deployment exercises.
Action required: 705 - Other - as specified
Resolved 6 January 2026
Resolution: Completed equipment deployment on 1JAN26. Cleared.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 29 December 2025 Resolved
33 CFR 155.1060(a)(1): Qualified individual notification exercises, which must be conducted quarterly. Vsl unable to produce documentation of quarterly QI notifications.
Action required: 705 - Other - as specified
Resolved 6 January 2026
Resolution: Completed exercise on 2JAN26; Cleared.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 29 December 2025 Resolved
33 CFR 155.1060(a)(2):Emergency procedures exercises, which must be conducted quarterly. Vsl unable to produce documentation of quarterly emergency procedure exercises.
Action required: 705 - Other - as specified
Resolved 6 January 2026
Resolution: Completed exercise on 2JAN26, Cleared.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 29 December 2025 Resolved
33 CFR 155.1055(b): A vessel owner or operator shall ensure the maintenance of records sufficient to document this training and make them available for inspection upon request by the Coast Guard. Records must be maintained for 3 years following completion of training. 3 years of response plan training records not available to USCG upon request.
Action required: 705 - Other - as specified
Resolved 6 January 2026
Resolution: Provided training records; cleared.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 December 2025 Resolved
33 CFR 104.230(b)(1): The VSO must ensure that at least one security drill is conducted at least every 3 months. Vsl unable to produce documentation of required security drills from the past 2 years.
Action required: 705 - Other - as specified
Resolved 6 January 2026
Resolution: Completed drill on 1JAN26; cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 December 2025 Resolved
46 CFR 58.10-5(a) : All installations must be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this subchapter. Exhaust manifold on cargo pump engine was heavily corroded.
Action required: 705 - Other - as specified
Resolved 8 January 2026
Resolution: Provided photos of newly installed exhaust manifold; all sat. Def cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 29 December 2025 Resolved
33 CFR 156.170(c)(2): Each transfer system relief valve must open at or below the pressure at which it is set to open. Cargo pump relief valve did not have record of annual testing.
Action required: 705 - Other - as specified
Resolved 6 January 2026
Resolution: Tested on 31DEC25, Cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 29 December 2025 Resolved
33 CFR 156.170(c)(3): Each pressure gauge must show pressure within 10 percent of the actual pressure. Transfer system pressure gauge did not have record of annual testing.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 January 2026
Resolution: purchased new gauge and tested; cleared.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 29 December 2025 Resolved
33 CFR 155.400(e): Each hose must be marked with one of the following: The name of each product for which the hose may be used; or “OIL SERVICE”. Cargo transfer hoses were not marked with service type.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 January 2026
Resolution: Added Oil Service Only marking to hoses; def cleared; all sat.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 29 December 2025 Resolved
33 CFR 155.400(f): Each hose also must be marked with the following, except that the information required by paragraphs (f)(2) and (3) of this section need not be marked on the hose if it is recorded in the hose records of the vessel or facility, and the hose is marked to identify it with that information: (1) Maximum allowable working pressure; (2) Date of manufacture; and (3) Date of the latest test required by 33 CFR 156.170. Transfer hoses were not marked IAW regulations.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 January 2026
Resolution: Hoses marked with MAWP, date of Manufacture, and last test date; def cleared; all sat.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 29 December 2025 Resolved
33 CFR 104.120(b): Each owner or operator of an unmanned vessel subject to this part must maintain the documentation described in paragraphs (a)(1), (2), or (3) of this section. The letter required by each of those paragraphs must be carried on board the vessel. No VSP approval letter was on board vessel.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 December 2025
Resolution: Verified as onboard.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 December 2025 Resolved
Each transfer pipe system must not leak under static liquid pressure at least 1 1 2 times the maximum allowable working pressure. Cargo piping system did not have record of annual testing at 1.5 x MAWP. 33 CFR 156.170(4) Prior to cargo operations.
Action required: 705 - Other - as specified
Resolved 6 January 2026
Resolution: completed testing on 2JAN26; cleared.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 29 December 2025 Resolved
Not burst, bulge, leak, or abnormally distort under static liquid pressure at least 11 2 times the maximum allowable working pressure. Transfer hoses did not have record of annual testing at 1.5 x MAWP. 33 CFR 156.170(1)(iii) Prior to cargo operations.
Action required: 705 - Other - as specified
Resolved 8 January 2026
Resolution: Provided completed annual test records; def cleared, all sat.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 March 2024 Resolved
Vent outlets from all tanks which may emit flammable or combustible vapors, such as bilge slop tanks and contaminated drain tanks, must be fitted with a single screen of corrosion-resistant wire of at least 30 by 30 mesh, or two screens of at least 20 by 20 mesh spaced not less than one-half inch (13mm) nor more than 1 1/2 inches (38mm) apart. The clear area through the mesh must not be less than the internal unobstructed area of the required pipe. 5 out of the 6 cargo tanks goose neck vents had rips/holes in the mesh of the flame screen. Vessel is require to replace the flame screen mesh to the satisfaction of the attending MI. 46 CFR 56.50-85(a)(8) 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2024
Resolved 4 April 2024
Resolution: replace with new flame screens
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 20 March 2024 Resolved
Valves for drawing fuel or draining water from fuel are not permitted in fuel oil systems except that a single valve may be permitted in the case of diesel driven machinery if suitably located within the machinery space away from any potential source of ignition. Such a valve shall be fitted with a cap or a plug to prevent leakage. Vessels fuel oil filter on the prime mover had a plastic collection bowl and plastic valve. Vessel is required to replace or fit the prime mover with the appropriate items for the fuel filter to the satisfaction of the attending MI. 46 CFR 56.50-60(f) 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2024
Resolved 25 April 2024
Resolution: Vsl installed fully enclosed fuel filter.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 March 2024 Resolved
Each cable installation must meet— (1) Sections 6, of IEEE 45.8–2016 (incorporated by reference; see § 110.10–1 of this subchapter); or (2) Cables manufactured to IEC 60092–353:2016 must be installed in accordance with IEC 60092–352:2005 (both incorporated by reference; see § 110.10–1 of this subchapter), including clause 8. Vessels battery cables on the prime mover were cracking/brittle wiring insulation. Vessel is required to replace the defective battery cables with approved battery cables to the satisfaction of the attending MI. 46 CFR 111.60-5(a) 16C
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 April 2024
Resolved 5 April 2024
Resolution: vsl replace battry cables with new cables.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 18 December 2021 Resolved
Your vessel must undergo an annual inspection within 3 months before or after each anniversary date, except as specified in paragraph (b) of this section. Vessel can provide no evidence that it underwent its first annual inspection as required. Vessel is prohibited from operating until Coast Guard Annual Inspection or COI Renewal Inspection is completed.
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Due 8 January 2022
Resolved 20 December 2021
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 18 December 2021 Resolved
Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station, conspicuously marked, and located at the midpoint of such vessel, or 100 feet from the engine, whichever is the more practical. The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine. Neither mechanical nor electric remote stops functioned at time of inspection. Prove proper operation of emergency stops to satisfaction of attending Marine Inspector
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Resolved 27 December 2021
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 18 December 2021 Resolved
The cargo handling equipment shall be maintained by the tank vessel's personnel in accordance with the regulations in this subchapter, including the following: (b) Cargo pump relief valves shall be tested at least once each year to determine that they function satisfactorily at the pressure at which they are set to open. (c) Cargo pump pressure gage shall be tested at least once a year for accuracy. (d) The cargo discharge piping of all tank vessels shall be tested at least once each year for tightness, at the maximum working pressure No evidence provided of cargo piping, cargo pump relief valve, or cargo pump gauge being tested annually. Complete cargo equipment testing to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Due 30 December 2021
Resolved 27 December 2021
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 18 December 2021 Resolved
The operator of a vessel with a capacity of 250 or more barrels of oil, hazardous material, or liquefied gas as regulated in Table 4 of 46 CFR part 154 shall provide transfer procedures that meet the requirements of this part and part 156 of this chapter for transferring - (a) To or from the vessel; and (b) From tank to tank within the vessel. No transfer procedures found on board vessel. Provide satisfactory transfer procedures to attending Marine Inspector.
Condition: Invalid
Action required: 703 - Prior to bunkering operations
Resolved 27 December 2021
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 December 2021 Resolved
All portable and semiportable extinguishers on board tank vessels shall be of an approved type. Both 40:B-C portable extinguishers require annual servicing to be of an approved type and missed annual servicing dates for 2021. Demonstrate portable extinguishers on board are of an approved type to the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Due 31 December 2021
Resolved 27 December 2021
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 18 December 2021 Resolved
A tank vessel with a capacity of 250 or more barrels that is carrying oil or hazardous material as cargo must have -A means of draining or removing discharged oil or hazardous material from each container or enclosed deck area without discharging the oil or hazardous material into the water. Vessel is missing 4 plugs for containment. Prove to attending Marine Inspector that all containment drains have plugs.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 December 2021
Resolved 30 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 December 2021 Resolved
(a) Electric installations on vessels must ensure: (1) Maintenance of services necessary for safety under normal and emergency conditions. (2) Protection of passengers, crew, other persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance with the applicable system requirements (IEEE, NEC, IEC, etc.) to which plan review has been approved. Marine Inspector deemed wiring at cargo pump to be a significant electrical hazard to vessel personnel. Prove to attending Marine Inspector safe operation of electrical equipment and that system integrity is maintained.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 December 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil and oily mixtures from machinery spaces
Issued 18 December 2021 Resolved
A ship, except a ship of less than 26 feet in length, must have a placard of at least 5 by 8 inches, made of durable material fixed in a conspicuous place in each machinery space, or at the bilge and ballast pump control station, stating the oil of discharge is prohibited.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 December 2021
Resolved 30 December 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 19 August 2020 Resolved
A coaming, at least 4 inches high but not more than 8 inches high, enclosing the immediate area of the cargo hatches, loading manifolds, and transfer connections, that has a capacity, in all conditions of vessel list and trim to be encountered during the loading operation, of at least one-half barrel per hatch, manifold, and connection within the enclosed area. Missing 3 plugs in coaming
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 August 2020
Resolution: Vessel purchased and installed new plugs.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 19 August 2020 Resolved
Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station, conspicuously marked, and located at the midpoint of such vessel, or 100 feet from the engine, whichever is the more practical. The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine. shut down is not conspicuously marked.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 September 2020
Resolved 3 September 2020
Resolution: Vessel remarked emergency shut down location.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 19 August 2020 Resolved
Shutoff valves. Shutoff valves shall be installed in the fuel supply lines, one as close to each tank as practicable, and one as close to each fuel pump as practicable. Valves shall be accessible at all times.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 August 2020
Resolved 19 August 2020
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 19 August 2020 Resolved
Vent outlets from all tanks which may emit flammable or combustible vapors, such as bilge slop tanks and contaminated drain tanks, must be fitted with a single screen of corrosion-resistant wire of at least 30 by 30 mesh, or two screens of at least 20 by 20 mesh spaced not less than one-half inch (13mm) nor more than 11/2 inches (38mm) apart. The clear area through the mesh must not be less than the internal unobstructed area of the required pipe. Vent flame screen was broken on fuel tank.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 September 2020
Resolved 3 September 2020
Resolution: Vessel installed new flame screen.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 19 August 2020 Resolved
This section of the plan must contain information to assist the master in initiating action by the coastal State, local government, or other involved parties. This information must include guidance to assist the master with organizing a response to the incident, should a response not be organized by the shore authorities. Detailed information for specific areas may be included as appendices to the plan. See 33 CFR 151.26(b)(2) (Preamble) regarding a ship owner's responsibility to comply with individual state requirements for oil spill response. Per their Plan required notifcation to be located on board and was not present.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 September 2020
Resolved 3 September 2020
Resolution: VRP notification sheets were placed onboard the vessel.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 18 March 2019 Resolved
ISE not completed as required (31 Oct 2018). Make barge available for ISE upon arrival to Sector Hampton Roads zone. Cargo operations are not to be conducted until ISE is conducted and approved by Sector Hampton Roads USCG Marine Inspector.
Action required: 703 - Prior to bunkering operations
Due 18 March 2019
Resolved 26 March 2019
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 10 January 2019 Resolved
Any Tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a remote manual fuel shutdown. Manual shutdown failed while testing. repair/replace and prove proper operation.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 January 2019
Resolved 17 January 2019
Resolution: Received email video showing replacement and proper operation of the fuel shut-off remote.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 18 October 2016 Resolved
Unable to verify if the cargo pump prime mover fuel hoses meet SAE J1942. Provide documentation that the hoses meet the standard or install hoses that meet SAE J1942, not to exceed 30 inches. In addition, hose fittings must comply with SAE J1475 and must be installed following the manufacturer's recommended practice.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 November 2016
Resolved 24 October 2016
Resolution: Hoses replaced with Parker hose # 221FR with a Parker fitting # 10626-6-6b meeting SAE J1942. See photograph in activity documents.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 5 September 2014 Resolved
Cargo pump relief valve had not been annually tested. Demonstrate proper operation of relief valve.
Action required: 705 - Other - as specified
Due 5 October 2014
Resolved 9 September 2014
Resolution: Relief valves tested in place using calibrated gauge on system piping.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 5 September 2014 Resolved
Cargo system piping pressure gauge had not been tested anually. Demonstrate accuracy of pressure gauge.
Action required: 705 - Other - as specified
Due 5 October 2014
Resolved 9 September 2014
Resolution: Pessure gauge was tested and calibrated.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 23 September 2013 Resolved
Provide MAWP rating of all cargo pipelines.
Due 9 October 2013
Resolved 2 October 2013
Resolution: Cargo pipelines labeled with MAWP.
Construction/Loadline › Hull › Longitudinal Frame
Issued 23 September 2013 Resolved
Repair damaged longitudinal weld in port side void #2, bay #2, #2 longitudinal from the bottom.
Condition: Damaged By Earlier Event
Due 9 October 2013
Resolved 2 October 2013
Resolution: Damanged welds repaired.
Construction/Loadline › Hull › Weld
Issued 23 September 2013 Resolved
Prior to loading cargo, repair pin hole leak in port side cargo tank #2, void #2, bay #2, to the satisfaction of the attending Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 October 2013
Resolution: Operator provided repair proposal for leaking welds. Repairs carried out satisfactorily.

Casualty record · 1

19 December 2021Routine · role: Involved in a Marine Casualty · activity 7370654
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.