← All vessels
SAMOA
Freight Ship · Bulk Carrier class · Built 2000s · USCG Northwest District (CGD-NW) · Other hulls named SAMOA
SAMOA is a 2009 freight ship. The Coast Guard has recorded 7 inspections since 2011, most recently in February 2025, along with 4 deficiencies.
Records from 2011 to 2025. Most recent: inspection, 7 February 2025.
- Built
- 2009
- Last inspected
- 7 February 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 4 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9473157 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
9HA2205
1071210
Flag
MALTA
—
Maury page id
psix-1071210
Inspections, by type
The 7 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it25325 - Convention (Subpart B), Net Ton
88536 - Displacement, Metric Ton
75505 - Dead Weight, Metric Ton
41342 - Convention (Subpart B), Gross Ton
88536 - Displacement, Metric Ton
75505 - Dead Weight, Metric Ton
41342 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 7
7 February 2025
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8071938
1 September 2020
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7047408
21 March 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6641343
13 September 2017
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6257448
22 December 2015
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5778623
4 January 2011
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3920258
3 January 2011
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3919521
Deficiency record · 4
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 13 September 2017
Resolved
Means shall be provided to control leaks of flammable liquids to prevent the ignition of combustible material. PSCO observed leakage from the fuel injection pump on the #3 MDE. In addition, leakage of fuel oil was observed from fuel pumps on the #1 and #2 auxiliary engines. (74 SOLAS (14) II-2/4).
Operations/Management › Ballast Water Managment › Ballast Retention
Issued 22 December 2015
Resolved
0940-Ballast Fuel & Other Tanks-Maintenance of the protective coating system shall be included in the overall ship's management scheme. The effectiveness of the protective coating system shall be verified during the life of a ship by an organization recognized by the Administration. Vessel converted the Aft Peak Tank into a sewage holding tank for treated sewage. SOLAS 74 (2009) II-1/3-2.4
Pollution Prevention/Response › Prevention Equipment › Sewage System Tank
Issued 22 December 2015
Resolved
0330-Sanitary Facilities-Vessel's holding tank shall be constructed to the satisfaction of the Administration. Vessel is pumping treated grey water into the aft peak tank. Vessel must obtain approval from Class authorizing procedure is in compliance with MARPOL Annex IV. MARPOL IV/9.1.2; 33CFR159
Operations/Management › Pollution › Compliance with Transfer Procedures
Issued 22 December 2015
Resolved
0150-Oil Pollution Prevention-Each transfer pipe system onboard a vessel must be tested under static liquid pressure at least 1.5 times the maximum allowable working pressure, annually. Vessel completed testing using a pneumatic medium, but not using a liquid medium. This deficiency must be rectified prior to conducting bunkering operations in US waters. 33CFR1156.170
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.