GASLOG SAVANNAH is a 2010 tank ship. The Coast Guard has recorded 10 inspections since 2017, most recently in June 2026, along with 6 deficiencies and 1 operational control.
Records from 2017 to 2026. Most recent: inspection, 17 June 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it30877 - Convention (Subpart B), Net Ton 82291 - Dead Weight, Metric Ton 112089 - Displacement, Metric Ton 97818 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 10
17 June 2026Bulk Liquid Transfer Monitor
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8406702
29 October 2025Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8260543
2 October 2025PSC B · COC-GAS Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8240233
24 September 2024Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8005178
17 September 2024Ballast Water Examination · COC-GAS Renew · PSC B · In-Service Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8004024
8 November 2019Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6852238
8 October 2019Ballast Water Examination · ISPS II Exam · COC-GAS Renew
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6822708
7 October 2019Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6827254
10 January 2018Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6335516
1 November 2017COC-GAS Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6299105
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2025Resolved
Electrical equipment, cables and wiring should not be installed in hazardous locations unless it conforms with the standards not inferior to those acceptable to the organization. PSCO observed cable connections entering sounding gauges (float level gauge) on top of cargo tank 4, 3, and 2 were not properly connected. 74 SOLAS Cons VII / 13.1 93 IGC 10.1.4 40 a.c.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 October 2025
Resolution: PSC NOLA recieved a class report from ABS satisfying the requirements.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 October 2025Resolved
Where tanks or piping are separated from the ship's structure by thermal isolation, provisions shall be made for electrically bonding both the piping and the tanks. PSCO observed multiple separated bonding straps in multiple locations on all cargo tanks tops. 74 SOLAS Cons VII / 13.1 IGC 93 5.2.1.4 40 a.c.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 29 October 2025
Resolution: PSC NOLA recieved a class report from ABS satisfying the requirements.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 8 October 2019Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons aboard. 74SOLAS(14)I/11(a)
Multiple leaks observed on steering gear equipment.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 November 2019
Resolution: Vessel made appropriate repairs; ABS surveyor witnessed operational test with no leaks observed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 October 2019Resolved
Gas detection systems provided in accordance with the requirements of 16.3.1 and 16.3.4 should comply with 13.6.2 and 13.6.4 through 13.6.8 as applicable; they should ativate the alarm at 30% of the lower flammable limit and shut down the master gas fuel valve referred to in 16.3.7 before the gas concentration reaches 60% of the lower flammable limit.
Gas detection had an LFL reading in excess of 60% and master gas valve failed to shut down. 74SOLAS(14)VII/13.1 and IGC Code 16.3.10
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 November 2019
Resolution: Service engineer attended vessel, system set according to applicable requirements; shut down found satisfactory by ABS surveyor.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 8 October 2019Resolved
Electrical equipment located in the double-wall pipe or duct specified in 16.3.1 should be of the intrensically safe type.
Port GVU room lighting fixture lenses are cracked and no longer gas safe. 74SOLAS(14)VII/13.1 and IGC code 16.2.3
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 November 2019
Resolution: Lenses replaced as appropriate and found satisfactory by attending ABS surveyor.
Deck/Cargo › Cargo Stowage › General
Issued 5 November 2017Resolved
1138: Cargo/Master [name withheld] A master gas fuel valve should be located within the cargo area. Master gas valves are installed on the stern of the vessel. IGC 16.3.7
Due 5 December 2017
Resolved 10 January 2018
Resolution: Received a valid International Certificate of Fitness with an equivalency issued IAW Section 1.4 of the 1993 IGC Code attesting to an equivalent level of safety regarding the Master Gas valves and the requirements of Section 16.3.7 and 16.3.8 of the code.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.