BBC ECHO is a 2008 freight ship. The Coast Guard has recorded 21 inspections since 2017, most recently in March 2026, along with 13 deficiencies and 2 operational controls.
Records from 2017 to 2026. Most recent: inspection, 11 March 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it15393 - Displacement, Metric Ton 10340 - Dead Weight, Metric Ton 8750 - Convention (Subpart B), Gross Ton 3859 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 21
11 March 2026Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8324712
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 21 July 2025Resolved
OIL FUEL PIPES, WHICH, IF DAMAGED, WOULD ALLOW OIL TO ESCAPE FROM A STORAGE, SETTLING OR DAILY SERVICE TANK HAVING A CAPACITY OF 500L ...SHALL BE FITTED WITH A COCK OR VALVE DIRECTLY ON THE TANK CAPABLE OF BEING CLOSED FROM A SAFE POSITION OUTSIDE THE SPACE CONCERNED. PSCO OBSERVED ZIP TIE ON MAIN ENGINE THERMAL OIL CONTROL VALVE PREVENTING VALVE FROM OPERATING AS INTENDED.
74SOLAS(09) II-2 / 4.2.2.3.4
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 July 2025
Resolution: Cleared on the spot
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 July 2025Resolved
MACHINERY ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO ANY PERSONS ON BOARD. PSCO OBSERVED COOLANT LEAK ON EMERGENCY GENERATOR AT APPROXIMATELY ONE DRIP EVERY 04 SECONDS.
74SOLAS(09) II-1 / 26.1
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 August 2025
Resolved 14 August 2025
Resolution: Received documentation attesting to proper repair of emergency generator coolant leak.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 July 2025Resolved
EACH NOA MUST CONTAIN ALL OF THE INFORMATION SPECIFIED IN TABLE 160.206; OPERATIONAL CONDITION OF EQUIPMENT REQUIRED BY 33 CFR PART 164 OF THIS CHAPTER. NOA DID NOT INCLUDE NON OPERATIONAL EQUIPMENT STATUS OF THE S BAND RADAR.
33CFR 160.206(a)(6)
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 21 July 2025
Resolution: Cleared on 21JUL25
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 21 July 2025Resolved
ALL SHIPS OF 300 GT AND UPWARDS SHALL BE EQUIPED WITH A 9GHZ RADAR TO DISPLAY THE RANGE AND BEARING SURFACE CRAFT, OBSTRUCTIONS, BUOYS, SHORELINES, AND NAVIGATIONAL MARKS TO ASSIST IN NAVIGATION AND COLLISION AVOIDANCE. PSCO OBSERVED INOPERABLE S-BAND RADAR WHILE ON BOARD THE VESSEL.
74SOLAS(24) V / 19.2.3.2
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 August 2025
Resolution: Received tenchician report attesting to proper repairs.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 21 July 2025Resolved
THE COMPANY SHOULD ESTABLISH PROCEDURES, PLANS AND INSTRUCTIONS FOR KEY SHIPBOARD OPERATIONS CONCERNED WITH SAFETY OF THE PERSONNEL, SHIP, AND PROTECTION OF THE ENVIRONMENT. PSCO OBSERVED EMERGENCY GENERATOR RUNNING WHILE BOARDING THE VESSEL AND DURING EXAM AND UTILIZED AS A MEANS OF PRIMARY ELECTRICAL POWER ON BOARD WITHOUT SMS DIRECTION AND GUIDANCE OF EMERGENCY GENERATOR OPERATIONAL USE.
ISM CODE 7
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 August 2025
Resolution: Received Company Circular letter authorizing the Emergency DG while in port.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 July 2025Resolved
WHENEVER A DEFECT IS DISCOVERED EITHER OF WHICH AFFECTS THE SAFETY OF THE SHIP OR THE EFFICIENCY, THE MASTER OR OWNER OF THE SHIP SHALL REPORT IMMEDIATELY TO THE APPROPRIATE AUTHORITIES OF THE PORT STATE. PSCO WAS NOT NOTIFIED OF INOPERABLE EQUIPMENT PRIOR TO ARRIVAL INTO THE PORT OF VIRGINIA.
74SOLAS(24) I / 11(c)
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 21 July 2025
Resolution: Master made notification of inoperable equipment during exam
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 16 June 2025Resolved
The machinery shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being moving parts and other hazards. PSCO observed a hole in the fly wheel grate for emergency generator. 74solas(04)ll-1/26.1 40ac
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 June 2025
Resolved 18 June 2025
Resolution: class attended and verified satisfactory repairs were made.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 June 2025Resolved
Pipping systems and fittingts shall be of design and construction adequate for service which is intended to protect as to reduce a minimum danger to persons on boardsa. PSCO observed fuel supply and discharged valve for main diesel fuel cooler zipped tied in the open position. When zip tie was removed valves would shut with very little pressure. With one finger you could stop fuel to main and lose propulsion. Chief engineer tried 2x to tighten the packing gland with no result. 74solas(04)II-1/26.1 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 17 June 2025
Resolved 18 June 2025
Resolution: class attended and verified satisfactory repairs were made.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 23 August 2024Resolved
THE MACHINERY, BOILERS, AND OTHER PRESSURE VESSELS AND ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF SOUND AND RELIABLE CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE, AT A MINIMUM,ANY DANGER TO PERSONS ON BOARD, DUE REGARD BEING GIVEN TO MOVING PARTS, HOT SURFACES, AND OTHER HAZARDS. HOUSTON PILOTS REPORTED VESSEL EXPERIENCED REDUCTIONIN PROPULSION WHILE TRANSITTING OUTBOUND FROM HOUSTON. VESSEL IDTENTIFIED A CRACK IN THE MAIN ENGONE NUMBER 4 CYLINDER HEAD AND AIR IN THE JACKET WATER.. PSCO OBSERVED SOFT PATCHE AND CRACKS ON S/W COOLING LINE AND PUMPS EXHIBIT SIGNS OF RUNNING DRY/OVERHEATING. ADDITIONALLY, PSCO OBSERVED BROKEN VALVES ON S/W COOLING LINE. 74SOLAS(04) II-1/26
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 23 August 2024
Resolved 2 September 2024
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 23 August 2024Resolved
THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF COMBUSTABLE MATERIALS OR FLAMMABLE LIQUIDS. FOR THIS PURPOSE, THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET: MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS. PSCO OBSERVED OIL ACCUMULATION AROUND A/E 1 AND 2, MGO TANK IN GENERATOR ROOM, M/E CYLINDER HEADS, STEERING GEAR STORAGE TANK, SEPARATED OIL RESIDUE ON LUBE OIL COOLER, AND LITERS OF ACCUMULATED OILY WATER IN THE BILGE UNDER MAIN ENGINE, COOLING WATER PUMPS, AND S/W COOLERS. 74SOLAS(04)II-2/40101
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 23 August 2024
Resolved 2 September 2024
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 23 August 2024Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ONBOARD. PSCO OBSERVED POOLING OIL GOING TO A JERRY CAN ON STACK BREATHER VENT. ADDITIONALLY PSCO OBSERVED DAMAGED FLAME SCREEN ON STACK BREATHER VENT. 74SOLAS(20)I/11
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 August 2024
Resolved 2 September 2024
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 23 August 2024Resolved
DOORS FITTED IN BOUNDRY BULKHEADS OF MACHINERY SPACES OF CATAGORY A SHALL BE REASONABLY GASTIGHT AND SELF CLOSING. PSCO OBSERVED DOOR TO STEERING GEAR ROOM TO BE NON-SELF CLOSING WITH SELF-CLOSING DEVICE INSTALLED. 74SOLAS(04)II-2/9.4.2.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 August 2024
Resolved 2 September 2024
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ONBOARD. PSCO OBSERVED 03 HOLES IN EMERGENCY GENERATOR CO2 LOCKER. 74SOLAS(20)I/11
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 August 2024
Resolved 2 September 2024
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.