Records from 2016 to 2023. Most recent: inspection, 10 October 2023.
Inspection history · 27
10 October 2023
Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7805808
19 September 2023
COC-CHEM & TVE Renew · PSC B
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7791047
6 February 2023
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7632939
26 September 2022
PSC B · COC-CHEM & TVE Annual
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7566133
24 July 2022
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7514799
14 April 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7431248
11 April 2022
Deficiency Check · Administrative Inspection · In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7428559
12 October 2021
Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7330735
12 October 2021
Type not recorded
No type recorded · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7331026
31 August 2021
COC-CHEM & TVE Renew · PSC B
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7300896
23 July 2021
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7265632
21 July 2021
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7263795
2 July 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7242854
29 January 2021
COC-CHEM & TVE Annual · PSC B · COC-CHEM & TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7129822
24 January 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7129910
17 August 2019
COC-CHEM & TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6787750
15 August 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6513070
2 August 2018
ISPS III Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6488000
25 July 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6490754
3 July 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6453105
2 April 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6383582
13 March 2018
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6371312
5 March 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6366234
22 February 2018
Deficiency Check · Administrative Inspection · Ballast Water Examination · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6351765
13 April 2017
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6123936
9 April 2017
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 6121132
22 November 2016
COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6045228
08 - Alarms › N/A - No Subsystem › General alarm
Issued 19 September 2023
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board.
PSCO observed an audible/visual general annunciator indicator in engine space next to the shaft was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2023
Resolved 10 October 2023
Resolution: Received ABS Class report attesting to repairs
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 26 September 2022
Resolved
The main door to the engine control room, an A-60 door, was deteriorated and in need of replacement. Door no longer operates as intended.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 October 2022
Resolved 6 February 2023
Resolution: Class report submitted. This was initially reported to be an A-60 boundary. However, it was determined that this is a C class boundary. It was further confirmed that
the damaged door was labeled as C class. B-15 installed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 11 April 2022
Resolved
IG System shall be capable of delivering inert gas with an oxygen of not more than 5% to the cargo tanks at any flow rate. IG system was unable to deliver proper inert gas flow rate to maintain cargo operations. This resulted in a loss of pressure and shut down. PSCO observed 02 spikes in oxygen while on board.
FSS 15.2.2.1.2.5
Action required: 17 - Rectify deficiencies prior to departure
Due 11 April 2022
Resolved 12 April 2022
Resolution: Class report submitted. Deficiencies rectified.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 11 April 2022
Resolved
A water seal shall be capable of maintaining an adequate supply at all times. PSCO observed 03 low level alarms on deck water seal while on board.
FSS 15.2.2.3.1.4
Action required: 17 - Rectify deficiencies prior to departure
Due 11 April 2022
Resolved 12 April 2022
Resolution: Class report submitted. Deficiencies rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 October 2021
Resolved
The machinery shall be adequate for the service which it is intended. Vessel experienced a main engine malfunction.
74SOLAS(20)II-1/26 Action 60ac
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 12 October 2021
Resolved 13 October 2021
Resolution: Repairs were conducted, and condition of equipment have been certified by class.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 29 January 2021
Resolved
For tankers of 20,000 tons deadweight and upwards be capable of preventating dangerous accumulation of explosive mixtures. PSCO observed that ships crew installed a fixed piping connection between the N2 system and the IG main. Request clarification Certificate issuing authority. Rectify prior to cargo operations.
SOLAS 74 amend II-2 5.5 & 5.5.4
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 29 January 2021
Resolution: Received, reviewed and accepted class report from ABS attesting to the removal of the cross over sonnection from the N2 generator line to the IG line contravention to plan approval.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 29 January 2021
Resolved
For tankers 20,000 tonnes deadweight and upwards shall be designed, constructed, and tested to the satisfaction of administration. PSCO observed that there was no double block/bleed located in the hazardous zone. Prior to putting N2 system into service properly instal iaw SOLAS 74 amend II-2 5.5 & 5.5.4
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 21 July 2021
Resolution: Received ABS Class Report restricting the vessel from utilizing the N2 system, and instructing the vessel to solely utilize IGG when inerting is necessary.
Electrical › Lighting (service) › Lighting Fixture
Issued 1 March 2018
Resolved
1135 - Electrical installations shall be such as to minimize the risk of fire and explosion from flammable products.
PSCOs found 7 explosion-proof lights within hazardous area that are no longer functioning as designed - 1 tube type light with water, salt, and debris inside near starboard side forecastle, 3 globe type lights with dead bugs inside in sample locker room, and 3 globe lights with dead bugs inside cargo tank seawater heater room.
(17ac) 74 SOLAS 14 VII/10.1 REF IBC 10.1.2.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 1 March 2018
Resolved 2 March 2018
Resolution: PSC HOU received class ABS Survey Report satisfying the requirements, clearing this deficiency.
Documentation › Certificates/Documents › International Certificate of Fitness (IBC Code)
Issued 22 February 2018
Resolved
1135 - An international Certificate of Fitness (COF) for the carriage of dangerous chemicals in bulk shall be issued to a chemical tanker engaged in international voyages. The Certificate shall be drawn up in the form corresponding to the model given in the appendix.
Vessel is currently loaded with 2,525 m³ of acetone, a Chapter 18 cargo, in tank #1. Acetone is not listed on the vessel's COF or COF addendum (Vessel does not have a separate IPPC-NLS for Chapter 18 cargoes). This constitutes transport of a substance not authorized/mentioned in the vessel's COF.
(74 SOLAS 14 VII/10.1 REF IBC 1.5.4) (30abc)
Action required: 30 - Ship detained
Due 22 February 2018
Resolved 1 March 2018
Resolution: Vessel was issued updated CoF and list of products that included acetone.
Deck/Cargo › Cargo Stowage › General
Issued 22 February 2018
Resolved
1135 - The quantity of cargo required to be carried in a type II ship shall not exceed 3,000 m³ in any one tank.
Vessel currently has 3,180 m3 of 1,3 Cyclopentadiene dimer (molten) in tank #6P. 1,3 Cyclopentadiene dimer (molten) must be carried on a ship type II per column “e” of chapter 17 of the IBC.
(74 SOLAS 14 VII/10.1 REF IBC 16.1.2) (30abc)
Action required: 30 - Ship detained
Due 22 February 2018
Resolved 14 March 2018
Resolution: Received notification from attending PSCOs at Sector New Orleans that vessel discharged enough 1,3-cyclopentadiene dimer (molten) to barge to reduce quantity in tank to <3000 m3.
Deck/Cargo › Inert Gas System › Deck Distribution System
Issued 22 February 2018
Resolved
1850 - For tankers of = 20,000 DWT, the protection of cargo tanks shall be achieved by a fixed inert gas system IAW the requirements of the FSS Code. The system shall be operated as to render and maintain the atmosphere of the cargo tanks non-flammable at all times, except when such tanks are gas free.
Vessel is 49,999 DWT. #1 -#6 port and starboard cargo tanks are >3,000m³ in size so exemption from IG requirements in SOLAS II-2/4.5.5.2.2 does not apply.
Vessel is currently loaded with acetone (1P) and benzene (2P, 2S, 3P, 3S, 4P, 4S, 5P, 5S, 6S). Both cargoes have a flashpoint <60°C (Acetone -9.4°C, Benzene -11°C). Crew stated that tanks were not inerted prior to loading. PSCOs witnessed measuring of O2 content in tanks and found multiple tanks in the flammable range (tanks 4P, 3P, 2P, and 2S at 15.3%, 15.5%, 15.0%, and 16.6% respectively).
(74 SOLAS 14 II-2/4.5.5 REF 2007 FSS 15.2.1.2)
(30abc)
Action required: 30 - Ship detained
Due 22 February 2018
Resolved 1 March 2018
Resolution: Received class report from ABS attesting to the fact that all cargo tanks have been properly inerted.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 22 February 2018
Resolved
2535- The company should establish procedures procedures, plans and instructions, including checklists as appropriate, for key shipboard operations. SMS CHP-001-7/42 Section 1.8.5(g) states that “for tanks in excess of 3,000m³ and cargo with a flashpoint of 60°c, tanks must be inerted before loading". This procedure is also incorporated in checklist CHP-FM03, item #25.
Vessel is currently loaded with acetone (1P, flashpoint -9.4°c) and benzene (2P, 2S,3P,3S,4P,4S,5P,5S,6S; flashpoint -11°c). All aforementioned tanks are >3,000m³ in size. Tanks were not inerted prior to loading and during exam PSCOs found multiple tanks to have O2 content of >15% by volume.
(74 SOLAS 14 IX/3.1 REF ISM 7) (30bc)
Action required: 30 - Ship detained
Due 22 February 2018
Resolved 2 March 2018
Resolution: Received copy of additional ISM audit report from LISCR, detailing 2 non-conformities and 3 observations.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 22 February 2018
Resolved
Each vessel vapor connection flange face must have a 1/2" diameter permanent stud projecting outward at least 1 inch long.
All 4 vapor connection flange faces lack a permanently affixed stud. PSCOs were able to unscrew and remove bolts by hand. All bolts were not projecting outward and one flange's hole was not aligned with stud.
(16c) 46 CFR 39.2001 (j)
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 March 2018
Resolved 2 March 2018
Resolution: Received pictures from vessel showing permanently affixed (welded) stud on vapor flange.