Records from 2000 to 2026. Most recent: inspection, 20 May 2026.
Inspection history · 64
20 May 2026
PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8376970
7 February 2026
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8307487
16 September 2025
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8230415
2 April 2025
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8104170
1 April 2025
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8102979
7 February 2025
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8076002
7 February 2025
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 8076504
5 February 2025
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 8075411
13 January 2025
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8058813
16 May 2024
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7913321
11 April 2024
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7893630
25 January 2024
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7845961
13 January 2024
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7849030
17 April 2023
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7670125
13 April 2023
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7666573
19 October 2022
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7579494
7 April 2022
PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7426348
7 October 2021
PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7328168
24 April 2021
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7178828
28 December 2020
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7116958
23 September 2020
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7063668
18 March 2020
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6928473
11 February 2020
PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6904027
11 February 2020
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6907113
24 September 2019
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6814267
2 May 2019
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6678977
11 January 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6606133
30 October 2018
Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6572605
28 October 2018
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6575893
19 May 2018
ISPS III Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6414814
2 May 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6399247
2 August 2017
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6228222
16 December 2016
Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6057986
2 December 2016
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6051376
17 April 2016
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5853227
18 August 2015
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5219737
5 August 2015
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5200226
27 June 2012
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4358038
30 March 2010
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3705907
10 September 2008
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3321349
24 June 2008
Random ISPS/MTSA/PSC
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3246126
4 November 2007
Random ISPS/MTSA/PSC
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3092716
18 June 2007
Type not recorded
No type recorded · Station Little Creek · USCG East District (CGD-E) · Activity 2965912
10 June 2007
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2957765
24 April 2006
Type not recorded
No type recorded · Maritime Safety & Security Team New York (91106) · Activity 2632579
24 April 2006
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2633163
21 April 2006
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 2630617
20 April 2006
ISPS II Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2629040
18 April 2006
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 2627742
7 December 2005
Random ISPS/MTSA/PSC
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2547745
6 December 2005
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2547565
15 September 2005
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2493037
15 August 2005
ISPS II Exam · STCW 95 Exam · ILO-147 Exam · NPV Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 2463909
2 August 2005
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2448875
28 April 2005
ILO-147 Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2344658
15 August 2004
ISPS II Exam
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2166556
8 June 2004
MTSA/ISPS Verification
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2092601
4 June 2004
Welding Related Inspections Qualification Testing
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2088621
15 April 2004
Annual Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2044718
11 February 2004
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 2004901
2 May 2003
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1785182
30 August 2002
Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1669055
11 August 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 292796
11 August 2000
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 280917
01 - Certificates & Documentation › 011 - Ships Certificates › International Oil Pollution Prevention (IOPP)
Issued 7 February 2025
Resolved
OIL RESIDUE MAY BE DISPOSED OF DIRECTLEY FROM RESIDUE TANKS TO RECEPETION FACILITIES THROUGH THE STANDARD DISCHARGE CONNECTION REFERRED TO IN REGULATION 13, OR TO ANY OF THE APPROVED MEANS TO DISPOSE OF OI RESIDUE,... OR ACCEPATABLE MEANS CHICH SHALL BE ANNOTED IN ITEM 3.2 OF THE SUPPLEMENT TO IOPP CERTIFICATE FORM A. PSCO OBSERVED ENTERIES IN ORB FOR EVAPORTATION OF WATER FROM THE WASTE OIL EVAPORATION TANK THAT IS NOT INDICATED ON THE IOPP SUPPLEMENT AS AN APPROVED OTHER ACCEPTABLE MEANS. MARPOL73/78 Annex I/12.2
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 March 2025
Resolution: DNV do not describe 'natural' evaporation from sludge tank(s) under item 3.2.3 in IOPP
Supplement, as actually heating of sludge tanks are mandatory in MARPOL Annex I. In other words DNV do not consider such evaporation as "Other acceptable means".
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 February 2025
Resolved
THE ARRANGEMENTS FOR THE STORAGE, DISTRIBUTION AND UTILIZATION OF OIL USED IN PRESSURE LUBRICATION SYSTEMS SHALL BE SUCH AS TO ENSURE THE SAFETY OF THE SHIP AND PERSONS ON BOARD. PSCO OBSERVED LEAKING FROM THE M/E L/O HEAT EXCHANGER.
74 SOLAS(01) II-2/15.3
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 March 2025
Resolution: Re-tightening of the cooler's assembly bolts, declared as carried-out by the on-board crew-member
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 7 February 2025
Resolved
AFTER ANY SURVEY OF THE SHIP UNDER PARAGRAPH 1 OF THIS REGULATION HAS BEEN COMPLETED, NO CHANGE SHALL BE MADE IN THE STRUCTURE,EQUIPMENT SYSTEMS, FITTINGS, ARRANGEMENTS, OR MATERIAL COVERED BY THE SURVEY, WITHOUT SANCTION OF THE ADMINISTRATION, EXCEPT THE DIRECT REPLACEMENT OF SUCH EQUIPMENT AND FITTINGS. PSCO OBSERVED A PINHOLE LEAK IN PIPING FROM BILGE HOLDING TANK TO OWS. CREW CONDUCTED TEMP REAPAIRS. MARPOL73/78 ANNEX I/6.4.2
MARPOL I/6.4.2
40ac
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 31 March 2025
Resolution: Renewal of the piholed pipe-section, declared as completed by the on-board crew-members, is recorded as the permanent rectification of defective arrangements
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 7 April 2022
Resolved
11112 - Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. PSCO observed hydraulic power pack unit piping for the lifeboat leaking at the gauge fittings.
74SOLAS(20)III/20.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 7 April 2022
Resolution: Vessel personnel replaced leaking gauge and tightened all fittings. PSCO observed no further leaks upon repair.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 24 April 2021
Resolved
IW A SHIP IN WHICH FUEL OIL IS USED, ARRANGEMENTS FOR THE DISTRIBUTION OF THE FUEL OIL SHALL BE SUCH TO ENSURE THE SAFETY OF THE SHIP AND PERSONS ON BOARD. PSCO WITNESSED OIL SOAKED RAGS UNDER LEAKS AND WET OIL SPOTS ON MULTIPLE AUX. ENGINES AND M/E CYLYNDER #1.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 April 2021
Resolved 24 April 2021
Resolution: Recieved report from classification society
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 24 September 2019
Resolved
MARPOL 73/78 I/6.4.1 - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present convention to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. Three pinhole leaks were discovered on the OWS system; one on the inlet pipe for the OWS bilge water heater and one each on two of the three OWS cylinders.
(40ac)
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 12 October 2019
Resolution: Vessel provided [name withheld] attesting to the repairs of the pinhole leaks on the OWS system. See documnets.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 30 October 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provision fot eh present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel involved in collision during transit/turning within the Savannah River. Provide evidence that affected hull and welds are structurally sound.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 1 November 2018
Resolved 30 October 2018
Resolution: Received class report attesting to structural integrity of affected portion of hull.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 2 May 2018
Resolved
The means of control of any fixed gas fire-extinguishing system shall be readily accessible and simple to operate and shall be grouped together in an few locations as possible at positions not likely to be cut off by fire in a protected space. At each location there shall be clear instructions relating to the operation of the system having reard to the safety of personnel. The manual isolation valve for the low pressure CO2 system was found in the closed position. Crew would not by able to engage CO2 for protected spaces from the remote location. The wrench to open the manual isolation valve was not present in the local space and took approximately one minute to retrieve. Each location did not have clear instructions that included the opening of the manual isolation valve.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 2 May 2018
Resolved 3 May 2018
Resolution: Vessel provided satisfactory Class reports attesting to the operational status of the isolation valve.
Engineering › Steering Gear System › Rudder
Issued 2 May 2018
Resolved
The main steering gear shall be capable of putting the rudder over from 35degrees on one side to 35 degrees on the other side with the ship at its deepest seagoing draught and running ahead at maximum ahead service speed and, under the same conditions from 35 on either side to 30 degrees on the other side in not more than 28 seconds. Emergency steering unit does not put rudder over to 35 degrees port (vessel does not have full range of motion on port side)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 2 May 2018
Resolved 3 May 2018
Resolution: Vessel provided satisfactory Class reports attesting to the operational status of the steering gear rudder.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 2 May 2018
Resolved
Every oil fuel pipe which, if damaged would allow oil to escape from a storage, settling or daily service tank situated above the double bottom shall be fitted with a cock or valve directly on the tank capable of being closed from a safe position outside the space concerned in the event of a fire occuring in the space in which such tanks are situated. Oil Fuel tank valve for the emergency generator is inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 2 May 2018
Resolved 3 May 2018
Resolution: Vessel provided satisfactory Class reports attesting to the operational status of the quick closing valve for the emergency generator.
Documentation › Certificates/Documents › IOPP Certificate
Issued 2 May 2018
Resolved
After any survey of the ship has been completed, no change shall be made in the structure, equipment, systems, fittings, arrangements or materials covered by the survey. IOPP certificate certifies the separating/filtering equipment in accordance with MPEC.60 (33). Vessel has a MEPC. 107(48) system installed onboard.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 2 May 2018
Resolved 3 May 2018
Resolution: Vessel provided satisfactory Class reports attesting to issuance of Interim IOPP and verified the vessel is certificated for the correct OWS unit onboard.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 2 May 2018
Resolved
Doors fitted in boudary bulkheads of machinery spaces of Catagory A shall be reasonably gas tight and self closing. Door from engine room to port side bunkering station was not self closing.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 17 May 2018
Resolved 3 May 2018
Resolution: Vessel provided satisfactory Class reports attesting to the operational status of the self-closing door to the bunkering station.
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 2 December 2016
Resolved
(40ac) 74SOLAS (2001 cons) II-2/9.2.3.3.1- The minimum fire integrity of bulkheads and decks shall be as prescribed in tables 9.5 and 9.6- Ventilation ducting installed compromising the integrity of class 'A' Boundary.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 December 2016
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 2 December 2016
Resolved
(40ac)74SOLAS (2001 cons) II-2/9.2.3.3.1- The mimium fire integrity of bulkheads and decks shall be as prescribed in tables 9.5 and9.6- Wiring throughout the ship installed compromising the integrity of class 'A' boundries.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 December 2016
Fire Fighting › Fixed CO2 Fire Extinguishing System › Tanks
Issued 2 December 2016
Resolved
(40ac)74SOLAS (2001 cons) II-2/10.4.1.1.1 FSS CODE: 2.1.1.3- A fixed gas Fire-Estinguishing system complyi9ng with the provisions of the fire safety systems code. Means shall be provided for the crew to safely check the quanitiy of the fire-estinguishing medium in the containers. [name withheld] discovered both sight glasses for both CO2 tanks frozen in place.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 December 2016
Fire Fighting › Ventilation Systems › Ducts
Issued 2 December 2016
Resolved
(40ac)74SOLAS(2001 cons) CH1/11(a)- The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. - PSC Examiners discovered unapproved installation of dryer ducting directly connected to accomodation space vent system
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 16 December 2016
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 5 August 2015
Resolved
Fire growth potential must be limited by the means of control for flammable liquids in the space. #1, 2, 3, & 4 generator crank case and crank case doors were found to be excessively leaking. 74 SOLAS (09 Cons) Chapter II-2 / 5.1.2 To the satisfaction of Coast Guard and Class Society
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 August 2015
Resolution: USCG MSU Savannah received a class report and pictures proving deficiency has been rectified.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 27 June 2012
Resolved
2100-Oily Water Separator-Ships 10000 GT shall be fitted with oil filtering equip with alarm to indicate when level cannot be maintained. This arrangement will stop discharge of oily mixtures when effluent exceeds 15 PPM. Oily Water separator is not currently working. Current meter display was blank and system would not produce flow of effluent. Preventing operational test during PSC exam.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 June 2012
Resolved 28 June 2012
Resolution: New OWS oil content unit was changed out in entirety with spare bought from shore by attending tech. Unit tested and confirmed in good working order per class DNV.
Engineering › Lubricating Oil Service System › Flange
Issued 24 June 2008
Resolved
The inlet pipe for the lube oil cooler is leaking oil at the flange. Class to verify repairs. 74 SOLAS(04 cons.) 1-11
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 10 September 2008
Resolution: Verified the class report attesting to the fixing of the deficiency.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 24 June 2008
Resolved
The return line for the oily water separator has multiple soft patches. Class to verify repairs. 74SOLAS(04 cons.) 1-11
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 10 September 2008
Resolution: Verified the class report attesting to the fixing of the deficiency.
Construction/Loadline › Structures › Deck Plating
Issued 28 April 2005
Resolved
MOVABLE RAMP LEADING FROM DECK 2 TO DECK 1 PORT SIDE WILL NOT OPERATE AS DESINGNED DUE TO INOPERABLE/DISCONNECTED HYDRAULIC RAM. CLASS TO ATTEND AND ATTEST TO PROPER REPAIR AND OPERATION. SOLAS 74A CHAP. I/II
Action required: 705 - Other - as specified
Due 28 May 2005
Resolved 2 August 2005
Resolution: Sector LA/LB received DNV report by fax verifying proper repair and operation.