Records from 2016 to 2026. Most recent: inspection, 23 June 2026.
Inspection history · 38
23 June 2026
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8410470
12 August 2023
PSC A
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7765667
8 August 2023
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7762519
11 February 2023
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7640708
3 January 2023
PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7614864
21 December 2022
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7611752
6 June 2022
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7470129
3 January 2022
Ballast Water Examination · PSC B · MARPOL Annex VI Survey
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7373624
24 December 2021
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7372153
21 December 2021
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7370971
13 July 2021
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7254563
26 May 2021
Ballast Water Examination · MARPOL Annex VI Survey · PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7207276
15 April 2021
PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7175191
18 August 2020
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7036097
23 June 2020
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6984803
27 April 2020
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6944566
22 November 2019
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6860680
7 October 2019
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6829482
27 September 2018
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6550164
19 August 2018
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6516218
22 March 2018
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6376724
22 January 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6341479
10 October 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6285156
6 October 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6282501
7 August 2017
Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6233286
5 August 2017
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6230981
2 August 2017
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6227602
23 May 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6153088
23 May 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6154557
19 May 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6150090
21 March 2017
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6109408
20 March 2017
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6108249
18 March 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6106967
13 March 2017
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6103982
13 March 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6104040
19 May 2016
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5881143
12 May 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5874974
8 May 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5871559
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 8 August 2023
Resolved
The company and the ship shall comply with the requirements of the ISM Code. The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations. The company should ensure: appropriate corrective action is taken. PSCO observed, during an expanded exam, the following: Failure of the company and ship to properly manage failing E/R equipment, to include: A/E fuel delivery, A/E cooling water, oil mist detectors on A/E, steam pipes, fuel oil booster pumps, piping for OWS, piping for BWMS, E/R ventilation,F/O leak alarm on A/E. External ISM audit required prior to being released from detention. 74SOLAS(20) IX/3.1 ISM code 10 30ABC
Action required: 30 - Ship detained
Due 8 August 2023
Resolved 10 August 2023
Resolution: Additional ISM audit was carried out and four Non-conformities were identified
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 8 August 2023
Resolved
Internal combustion engines of 2250 KW and above or having
cylinders of more than 300mm bore shall be provided with crankcase oil must detectors or engine bearing temperature monitors of equivalent devices. PSCO observed active alarm on the A/E #3 oil mist detectors. 74SOLAS(04)II-1/47.2 10C
Action required: 10 - Deficiency Rectified
Due 8 August 2023
Resolved 8 August 2023
Resolution: Crew clean/replaced filters due to dirty oil. Alarm resolved.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 8 August 2023
Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chafing and other damage. PSCO observed intermittently malfunctioning oil level leak alarm on A/E #03 due to faulty electrical wiring. 74SOLAS(04) II-1/45.5.5 17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 8 August 2023
Resolved 10 August 2023
Resolution: A/E # 03 fuel oil leak alarm defect due to wiring fault repaired operation tested. Found satisfactory.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 August 2023
Resolved
Means shall be provided to control leaks of flammable liquids. PSCO observed leaking F/O booster pump in purifier space. 74SOLAS(09) II-2/4.1.1 30AC
Action required: 30 - Ship detained
Due 8 August 2023
Resolved 10 August 2023
Resolution: Diesel Generator engine Fuel oil boost pump no# 01 mechanical seal replaced and leak
repaired. Both diesel fuel oil boost pumps operation tested and found satisfactory with out any leaks.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 8 August 2023
Resolved
The machinery, boilers and other pressure vessels associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO observed cooling water leak on A/E #03. 74SOLAS(04) II-1/26.1 17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 8 August 2023
Resolved 10 August 2023
Resolution: A/E # 03 Jacket cooling water leak from JCW pipe repaired and operation function
tested and found satisfactorily repaired.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 8 August 2023
Resolved
Oil filtering equipment shall be of a design approved by the
administration. PSCO observed two leaks on the OWS piping. MARPOL I/14.6 16AC
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 August 2023
Resolved 20 August 2023
Resolution: Two (2) leaks on the OWS piping repaired and OCM 3 way valve
replaced by ships crew.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 August 2023
Resolved
Every steam pipe and every fitting connected thereto shall be so constructed as to withstand the maximum working stresses to which it may be subjected. PSCO observed steam leak from fuel oil heater piping in purifier space. 74SOLAS(04) II-1/33.1 17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 8 August 2023
Resolved 10 August 2023
Resolution: Purifier space leaking water from Purifier operating water supply piping identified and
permanently repaired and tested with satisfactory results.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 August 2023
Resolved
The master, owner, or operator must properly maintain the BWMS in accordance with all manufacturers specifications. PSCO observed soft-patches on piping associated with the BWMS. 33CFR151.2025(a)(1) 16AC
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 August 2023
Resolved 20 August 2023
Resolution: BWTS base catch tray holed drain pipe and CIP supply pump priming fresh water supply pipe hole has been permanently repaired.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 8 August 2023
Resolved
Ventilation ducts shall be of non-combustible material. PSCO
observed two plywood ventilation covers in E/R bottom, port side. 74SOLAS(09) II-2/9.7.1.1 16AC
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 August 2023
Resolved 10 August 2023
Resolution: Engine room bottom platform port side temporary modification and deflection with
Plywood permanently removed and repaired.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 August 2023
Resolved
Means shall be provided to control leaks of flammable liquids. PSCO observed A/E #04 leaking fuel and lube oil from cylinder tops. 74SOLAS(09) II-2/4.1.1 30AC
Action required: 30 - Ship detained
Due 8 August 2023
Resolved 10 August 2023
Resolution: A/E # 4 Lub oil leak from unit no 01 cylinder head rectified by replacing gasket in
between cylinder head & cylinder head mounted valve gear cover. A/E #04 running test carried outand verified leak had been repaired
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 26 May 2021
Resolved
WHERE THE SPACE IS BELOW THE BULKHEAD DECK, TWO MEANS OF ESCAPE SHALL CONSIST OF TWO SETS OF STEEL LADDERS LEADING TO DOORS IN THE UPPER SPACE, SELF CLOSING FIRE DOORS OF THE SAME FIRE INTEGRITY STANDARDS SHALL BE FITTED IN THE ENCLOSURE. SELF CLOSING DOOR ON EMERGENCY ESCAPE CLOSEST TO SHAFT SEAL DID NOT FULLY LATCH WHEN AUTOMATICALLY CLOSING.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 May 2021
Resolved 27 May 2021
Resolution: CREW FIXED LATCH WHILE CG CREW ON BOARD, ALLOWING DOOR TO CLOSE PROPERLY.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 15 April 2021
Resolved
Means of control for flammable liquids in the space shall be provided. PSCO observed active leaks along main engine coming from multiple cylinders. Additionally observed pooling of oil along main engine.
74SOLAS(14)II-2/5.1.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 April 2021
Resolved 16 April 2021
Resolution: Received class report attesting to repair.
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 15 April 2021
Resolved
External fuel lines shall be protected with a jacketed piping system, forming a permanent assembly. PSCO observed fuel lines disconnected and not forming a permanent assembly.
74SOLAS(14)II-2/4.2.2.5.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 April 2021
Resolved 16 April 2021
Resolution: Received class report attsting to repair.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 15 April 2021
Resolved
The company should identify equipment and technical systems the sudden operational failures of which may result in hazardous situations. The safety management system should include the specific measures aimed at promoting the reliability of such equipment or systems. These measures should include the regular testing of stand-by arrangements and equipment or technical systems that are not in continuous use. PSCO observed 05 pistons overdue for maintenance in accordance with maintenance schedule. Coast Guard is requiring an internal safety audit and corrective action taken within 03 months.
74SOLAS(14)IX/3
ISM Code(18)10.3
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 July 2021
Resolved 13 July 2021
Resolution: The vessel performed an internal safety audit to satisfaction of the CG within the designated time frame.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 15 April 2021
Resolved
Fixed fire detection shall be designed to detect rapidly the onset of fire. PSCO observed a bag covering a smoke alarm.
74SOLAS(14)II-2/2.4.2
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 15 April 2021
Resolved 15 April 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 15 April 2021
Resolved
The opening below the lowest course of the guard rails shall not exceed 230mm. PSCO observed lowest guard rail starboard side, bay 35, exceeding 230mm due to damage.
ICLL(88prot) Reg 25.3
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 15 April 2021
Resolved 15 April 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 October 2019
Resolved
Provision shall be made to facilitate cleaning, inspection and maintenance of main propulsion and auxiliary machinery including boilers and pressure vessels. The main engine fuel oil auto filter change over mechanism was found to be substantially leaking from top side of unit, casuing an excessive amount of fuel oil accumulation.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 November 2019
Resolved 22 November 2019
Resolution: RCV'D CLASS REPORT. ALL SAT
Electrical › Electric Generation Source (emergency) › Number of Sources
Issued 2 August 2017
Resolved
Each emergency generating set to be automatically started shall be equipped with starting devices approved by the administration with a stored energy capable of at least three consecutive starts. Automatic start inoperable due to a dead battery.
Ref: 74 SOLAS (2004), 11-1/44.2
Action required: 15 - Rectify deficiencies by next port
Due 2 August 2017
Resolved 7 August 2017
Resolution: Attend vessel and conducted operational test. Vessel had to replace starter. Class also attended and conducted operational test.