CARIBBEAN FANTASY

CARIBBEAN FANTASY is a 1989 passenger vessel (inspected). The Coast Guard has recorded 34 inspections since 2011, most recently in November 2016, along with 83 deficiencies — 4 with no resolution recorded — and 7 operational controls, 1 with no removal date recorded.

Records from 2011 to 2016. Most recent: operational control imposed, 10 November 2016.

Built
1989
Last inspected
10 November 2016
Documentation
Not in the documentation file of 10 September 2026
Controls
1 with no removal date recorded

Identity

8814263 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
1085710
Flag
PANAMA
—
Maury page id
psix-1085710

Inspections, by type

…with no type recorded6
…past their stated due date4
Years with a record 5 calendar years (2011–2016)
The 34 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 10 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Tonnage as PSIX records it10092 - Convention (Subpart B), Net Ton
16775 - Displacement, Ton
6219 - Dead Weight, Ton
28112 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 34

10 November 2016 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6039189
6 September 2016 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5993588
17 August 2016 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5977513
17 August 2016 NPV Safety Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5980256
9 August 2016 ISPS II Exam · Ballast Water Examination · COC-CVE Annual
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5963390
11 March 2016 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5831390
3 February 2016 ISPS II Exam · COC-CVE Quarterly · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5799679
23 November 2015 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5768470
19 October 2015 ISPS III Exam · COC-CVE Quarterly · Ballast Water Examination · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5746255
17 August 2015 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5220138
20 July 2015 Deficiency Check · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5190294
17 July 2015 Ballast Water Examination · COC-CVE Annual · ISPS III Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5183999
22 October 2014 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5002166
20 October 2014 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5008819
16 October 2014 ISPS III Exam · COC-CVE Quarterly · Ballast Water Examination · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5006466
22 August 2014 ISPS II Exam · PII Safety Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4962116
20 August 2014 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4958273
8 August 2014 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4945887
28 March 2014 ISPS III Exam · Ballast Water Examination · COC-CVE Quarterly
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4824222
17 March 2014 MARPOL Annex I Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4821667
26 June 2012 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4353855
20 June 2012 In-Service Inspection · Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 4349860
7 June 2012 Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4336722
1 June 2012 ISPS II Exam · Ballast Water Examination · COC-CVE Annual
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4319571
27 February 2012 COC-CVE Quarterly
Type not classified · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4251586
30 January 2012 In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4234654
12 December 2011 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4206242
6 December 2011 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4202535
2 December 2011 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4200470
23 September 2011 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4152701
31 August 2011 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4132193
29 August 2011 ISPS III Exam · COC-CVE Quarterly · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4129627
8 August 2011 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4109676
1 July 2011 Deficiency Check
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 4069700

Deficiency record · 83

Documentation › Certificates/Documents › Passenger Ship Safety Certificate
Issued 17 August 2016 No resolution recorded
Vessel experienced a fire in the engine room leading to an abandon ship. Life saving appliances, navigation equipment, firefighting equipment and fire suppression systems, are no longer in compliance with issued certificates. Administration and/or RSO should provide current validity status of all statutory certificates. 74Solas(97)I/19(b) 74Solas(97)I/11(c)
Condition: Invalid
Action required: 705 - Other - as specified
Due 26 August 2016 — due date passed with no resolution recorded
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 10 August 2016 No resolution recorded
All electrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in the normal manner. PSCO found in Cabin 31 an duplex 120 volt electrical outlet hanging by the electrical cable (not installed in an electrical box) above a crewmembers rack and a 120 volt duplex outlet improperly used for 220 volt service. 74 SOLAS (97) II-1/45.1.3 16ac
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 August 2016 — due date passed with no resolution recorded
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 9 August 2016 Resolved
Fire doors shall be self-closing and be capable of closing with an angle inclination of up to 3.5 opposing closure. A self-closing door next to #7 House Keeping Locker stays open. 74 SOLAS (97) II-2/30.4.1, 10c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 August 2016
Resolved 9 August 2016
Resolution: Cleared while onboard.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 9 August 2016 Resolved
Fire door shall be self-closing and be capable of closing with an angel of inclination of up to 3.5 opposing closured. PSCO found fire doors #610 and #612 not closing and out of sequence. 74 SOLAS (97) II-2/30.4.1, 10c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 August 2016
Resolved 9 August 2016
Resolution: Cleared prior to departing vessel.
Fire Fighting › Fixed Fire Detection System › Detector/Call Point Grouping
Issued 9 August 2016 Resolved
Any required fire detection and alarm system shall be capable of immediate operation at all times and no action by the crew shall be necessary to set it in operation. PSCO found smoke detector and sprinkler head hanging below the overhead at the outside of the SPA. 74 SOLAS (97) II-2/12.1.1, 10c
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 9 August 2016
Resolved 9 August 2016
Resolution: Cleared prior to departing vessel.
Fire Fighting › Structural - A Class Divisions › Cargo Spaces (moderate fire risk)
Issued 9 August 2016 No resolution recorded
Boundaries of bulkheads and decks of special catagory spaces shall be insulated to A-60. Frame 22, Deck B middle deck overhead insulation is missing. 74 SOLAS (97) II-2/37.1.2.1, 16ac
Condition: Improper/Lack of Maintenance
Due 23 August 2016 — due date passed with no resolution recorded
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 9 August 2016 No resolution recorded
Ventilation ducts serving RO-RO cargo spaces capable of being effectively sealed shall be separated from each cargo space. PSCO found the Aft, 017B Garage, two dampers not closing. 74 SOLAS (97) II-2/53.2.3.1., 16ac
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 August 2016 — due date passed with no resolution recorded
Fire Fighting › Automatic Sprinkler System › Sprinklers
Issued 9 August 2016 Resolved
A closed RO-RO space not capable of being sealed shall be fitted with an approved fixed pressure water spray system for manual operation which shall protect all parts of any deck and vehicle platform in such space. PSCO found a total of 21 drencher nozzles on C Deck Zone 2 and Zone 3 missing. 74 SOLAS (97) II-2/54.2.9, 10c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 August 2016
Resolved 9 August 2016
Resolution: Cleared prior to departing vessel. Vessel had new nozzles onboard.
Lifesaving › Lifeboat Equipment › Tools (engine)
Issued 3 February 2016 Resolved
Lifeboat equipment must be equipped with sufficient tools for a minor adjustments to the engine and its accessories. PSCO found all three lifeboats without having sufficient tools as required by LSA Code Chapter IV 4.4.8.27.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 February 2016
Resolved 11 March 2016
Resolution: Received class report stating "Each lifeboat has been supplied with a sealed tool box and safety officer has been instructed to check the tools in each boat during routine inspections."
Electrical › Electrical Distribution System (service) › Junction Box
Issued 3 February 2016 Resolved
Cables and wiring shall be installed and supported in such manner as to avoid chafing and other damage. PSCO found two electrical boxes hanging and unsupported on electrical room next to cabin 6002, deck 6. 74 SOLAS(04)II-1/45.5.5.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 March 2016
Resolved 11 March 2016
Resolution: Received class report stating "the electrical boxes have been properly secured."
Fire Fighting › Means of Escape › Stairways
Issued 3 February 2016 Resolved
Exposed surfaces in stairways enclosures shall have low flame-spread characteristics. PSCO found plywood installed in the overhead and bulkhead of stairwell 8 and landing between decks B and C. 74 SOLAS(97)II-2/34.3.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 February 2016
Resolved 3 February 2016
Resolution: Corrected on the spot by replacing the plywood with steel plates.
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 3 February 2016 Resolved
Fire protection systems shall be kept in good order so as to ensure their required performance if a fire occurs. PSCO sound combustible materials materials stored above the sprinkler head coverage are in portside safety stowage locker, next to rescue boat launching station. 74 SOLAS(04)II-2/14.2.1.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 17 February 2016
Resolved 11 March 2016
Resolution: Received class report stating "The combustible materials have been removed from the top shelf and a red line has been painted on the bulkhead noting not to stow items above the line."
Engineering › Freshwater System (piston cooling) › Piping
Issued 22 October 2015 Resolved
Machinery and pressure vessels, associated piping systems and fittings shall be of a design and consturction addequate for the service for which they are intended. PSCO found that the freshwater cooling line to the expansion tank which supplies the main engines and generators is wasted and ruptured upon investigation causing generators 1 & 2 to trip offline. 74SOLAS04 II-1/26 & ISM P.A 10.2.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2015
Resolution: The affected pipe has been renewed. The welding has been inspected and found in good order. The cooling system pipe is currenlty under operation with no leaks present.
Personnel › Training › Familiarization Training
Issued 22 October 2015 Resolved
MES party member shall be trained by participation in a full deployment of a similar system into water, either onboard a ship or ashore at intervals of not more than 2 yrs, but no longer than 3 yrs. The ship's crew could not provide documentation that any crew members were participating in MES deployments, and when questioned crew reported never having participated.74SOLAS14 III/19.3.3.8/ISM P.A.6
Action required: 705 - Other - as specified
Due 21 November 2015
Resolved 23 November 2015
Resolution: From RINA: "Training for MES party member has been carried out with means of audio video aids."
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 21 October 2015 Resolved
The condition of the ship and its equipment shall be maintained to the conform with the provisions of the present regulations. In the engineering spaces, PSCO found deck plates slippery and surfaces coated with an oil layer. Oil is seeping from machinery & all bilge surfaces had a 1" thick layer of oil, bilge pocket were full creating a fire hazard. 74SOLAS14 I/11A & ISM Part A 10.2.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2015
Resolution: Bilges & deck plating has been cleaned. Bilge wells drained to the bilge holding tank.
Personnel › Certificates/Documents/Licenses › License, Third Assistant Engineer
Issued 21 October 2015 Resolved
An Administration which recognizes under Reg I/10 a certificate of competency shall endorse such certificate to attest its recognition only after ensuring the autenticity and validity of the certificate. The 3rd Engineer did not have a valid certificate endorsement from the Administration. STCW I/2.7 & ISM Part A 6.2.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2015
Resolution: A valid application for endorsement has been received on board.
Personnel › Certificates/Documents/Licenses › License, Second Assistant Engineer
Issued 21 October 2015 Resolved
Administration shall hold companies responsible for the assignment of seafearers for service on their ships and shall require every company to ensure that its ships are manned in compliance with the applicable safe manning requirements. The 2nd Engineer was only certified on ships other than Ro-Ro passenger ships and had been standing watch onboard for 2 months. STCW I/14.1.2 & ISM Part A 10.2.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2015
Resolution: The 2nd engineer has been disembarked and replaced with a new crew member with valid endorsement and license as Chief Engineer.
Construction/Loadline › Hull › Strut/Cross Tie
Issued 21 October 2015 Resolved
A ship which is designed, constructed, and maintained in compliance with the appropiate requirements of an organization. PSCO found a welded patch on port side shaft tunnel, which crew & Class were not aware of. ILLC88 R.1.2/ISM Part A 10.2. (see Form B).
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2015
Resolution: Due to proximity of the shaft bearings within the tunnel, welding could not be carried out. A temporary repair cement box was constructed between the two frames. A Class and Statutory recommendation has been issued for permanent repair next dry dock.
Deck/Cargo › Cargo Stowage › General
Issued 21 October 2015 Resolved
All securing of cargoes, cargo units, and cargo transports units in accordance with the cargo securing manual shall be completed before the ship leaves the berth. PSCO found half of the cargo secured improperly, not in accordance with the cargo securing manual. 74 SOLAS(97) II-2/30.2/ ISM Part A.10.2.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2015
Resolution: Identified cargo has been re-secured in accordance with Cargo Securing Manual. Additional instructions to all concerned parties has been made.
Stability › Freeing Ports › General
Issued 21 October 2015 Resolved
Freeing ports, open rails, and scuppers shall be fitted as necessary for rapidly clearing the weather deck of water under all weather conditions. PSCO found that the scupper on the port lifeboat deck in way of the forward bridge ladder was clogged and unable to drain water from the weather deck. 74 SOLAS (04) II-1/20.2.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 November 2015
Resolved 23 November 2015
Resolution: From RINA: "Scupper has been cleaned and unclogged."
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 21 October 2015 Resolved
Machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCO found that the shaft seals seals flex lines hose clamps were wasted or missing. 74 SOLAS (04) II-1/26/ ISM Part A 10.2.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 November 2015
Resolved 22 October 2015
Resolution: The shaft seals flex lines hose clamps were replaced/
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 21 October 2015 Resolved
The machinery, boilers and other pressure vessels, associated pipping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be installed and protected to reduce to minimum danger to persons on board and other hazards. The bearings for the port and starboard propulsion shafts are leaking oil excessively. 74SOLAS04 II-1/ISM P.A.10.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 November 2015
Resolved 23 November 2015
Resolution: From RINA: At completion of overhauling has been verified that no leaks are present from the intermediate shaft bearings PS and SB side.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 21 October 2015 Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. PSCO identified a junction box on deck 2 forward of the port lifeboat where electricaljunction box had detached from its corroded mount. 74SOLAS (04) II-1/45.5.5 & ISM Part A 10.2.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 November 2015
Resolved 23 November 2015
Resolution: From RINA: "The junction box mounting has been repaired."
Electrical › Electrical Distribution System (service) › Switch
Issued 21 October 2015 Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. The mounting plate associated with ballast valve # 129 had failed and the limit switches are hanging by their cables. 74 SOLAS (04) II-1/45.5.5 & ISM Part A.10.2.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 November 2015
Resolved 23 November 2015
Resolution: From RINA: "Mounting plate has been renewed , but valve need to be replaced , verified that the valve can be operate by the local command, a Class recommendation has been imposed within next 21 december in order to replace the valve."
Electrical › Electric Generation Source (emergency) › Generator
Issued 21 October 2015 Resolved
While on board, #2 generator overheated and shut down. The load transferred to other Generator online, causing it to shut down due to insufficient load shedding. Automatic load shedding capability must be adequate to keep the additional generator online or the safe manning certificate must be re-issued to indicate vessel is not authorized to operate with a periodically unattended machinery space.
Action required: 705 - Other - as specified
Due 21 November 2015
Resolved 23 November 2015
Resolution: From RINA: "Ship is now operated with a manned engine room, new provisional minimum safe manning has been received & has been verified accordingly Crew list. DDGG tested & found working properly..."
Fire Fighting › Fire Main › Condition
Issued 21 October 2015 Resolved
Fire extinguishing appliances shall be kept in good order and be available for immediate use at all times. PSCO found a hole in the piping at fire station #15. 74SOLAS (04) II-2/20.0 & ISM Part A 10.2.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 October 2015
Resolution: A new section of pipe was cut and installed. Deficiency corrected on the spot.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 21 October 2015 Resolved
When a duct passes through a main vertical zone, a safe-fail damper shall be fitted on each side, capable of manual and automated operation. Damper did not operate as designed and required. 74SOLAS (97) II-2./32.11/16.4/16.8/ ISM Part A 10.2.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 October 2015
Resolved 22 October 2015
Resolution: Witnessed the proper operation of Damper. Deficiency Corrected on the spot 10.C.
Personnel › Training › Crisis Management/Human Behaviour
Issued 21 October 2015 Resolved
Masters, Officers and other personnel designed on muster lists to assist passengers in emergency situations shall have completed training in crowd management. The Chief Engineer and 2nd Engineer did not have valid training. STCW V/2.6 & ISM Part A 6.2.
Action required: 705 - Other - as specified
Due 21 October 2015
Resolved 22 October 2015
Resolution: Valid certificates were presented whith proper training as requested by STCW. Deficiency corrected on the spot 10.C.
Personnel › Training › Crisis Management/Human Behaviour
Issued 21 October 2015 Resolved
Masters, Officers and other personnel designed on muster lists to assist passengers in emergency situations shall have completed training in crowd management and human behavior. Chief Engineer and 2nd engineer did not have valid training. 74 STCW V/2.6 & ISM Part A 6.2.
Action required: 705 - Other - as specified
Due 21 October 2015
Resolved 22 October 2015
Resolution: valid documents were presneted that both crew members have valid training. Deficiency corrected on the spot 10.C.
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 21 October 2015 Resolved
Based upon observations while onboard as well as with general lack of upkeep & maintenance of the vessel, enough objective evidence of non-conformities have been discovered to show the vessel is not fully implementing its SMS; an external ISM audit is recommended. 74SOLAS(14) IX/3.1 & ISM Part A 10.2.
Action required: 705 - Other - as specified
Due 21 November 2015
Resolved 23 November 2015
Resolution: From RINA: "Additional SMC audit has been carried out, system has found adequate implemented. However two Non conformities have been identified, as per audit report available on board."
Lifesaving › Lifeboat › Watertight Enclosure
Issued 19 October 2015 Resolved
Access to lifeboats is provided by hatches which can be closed to make the lifeboat watertight. PSCO found that lifeboat #3 starboard side is missing two means (dogs) of closing the starboard side access hatch, and rubber gasket seal was damaged. 74SOLAS14 III/4 & ISM Part A 10.2 & LSA 4.6.2.2.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2015
Resolution: The dogs have been renewed and three rubber gaskets has been repaired. Hose test carried out in good order.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 19 October 2015 Resolved
The machinery, boliers and other pressure vessels, associated pipping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be installed and protected to reduce to minimum danger to persons on board and other hazards. The #1 Generator had 2soft patches on the piping for the exhaust cooling system. 74SOLAS(04)II-1/26 & ISM/A.10.2.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 21 November 2015
Resolved 23 November 2015
Resolution: From RINA: "FW piping for DG 1 have been renewed and checked with good result at working pressure test."
Fire Fighting › Structural - A Class Divisions › Doors
Issued 19 October 2015 Resolved
The construction of all doors and floor frames in "A" Class divisions with the means of securing them when closed shall provide resistance to fires as well to the passage of smoke and flame. PSCO found fire screen doors 6 & 12 Zone 4 C deck were not closing properly. 74SOLAS97 II-2/30.2.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 October 2015
Resolved 22 October 2015
Resolution: Identified doors were repaired and witnessed proper operation for both doors. Deficiency corrected on the spot 10.C.
Fire Fighting › Structural - Main Vertical Zones › General
Issued 17 July 2015 Resolved
PSCO found several fire screen doors through the vessel closing at a rate faster than 10s. 74 SOLAS 97 cons ed II-2 Reg 30.4.1 (10c)
Action required: 705 - Other - as specified
Resolved 17 July 2015
Resolution: Deficiency corrected on the spot.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 17 July 2015 Resolved
PSCO found during the smoke detection testing that the jewelry shop and the video room have been switched on the smoke detection panel. 74 SOLAS 97 cons ed II-2 Reg 13-1.1.7 (10c)
Action required: 705 - Other - as specified
Resolved 17 July 2015
Resolution: Deficiency corrected on the spot.
Stability › Unintentional Flooding › General
Issued 17 July 2015 Resolved
PSCO found leak detection system alarm is not installed n the engine control room, 74 SOLAS 04 cons ed II-1/23-2.2 (50ac)
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 17 August 2015
Resolution: Via class report: the leakage detection system in the engine room found with additional alarm installed. After installation the alarm in engine room regarding leakage detection system has been checked and tested satisfactory.
Stability › Unintentional Flooding › General
Issued 17 July 2015 Resolved
PSCO found ro-ro cargo spaces on port and STBD leak detection system sensors were not operational due to bilge wells being filled with mud . 74 SOLAS 04 cons ed II-1/23-2.2 (10c)
Action required: 705 - Other - as specified
Resolved 17 August 2015
Resolution: Deficiency corrected on the spot
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 17 July 2015 Resolved
PSCO found access ports on both port and STBD sewage tanks to be in a state of disrepair in regards to excessive corrosion and broken/missing nuts. 74 SOLAS 97 cons ed II-1/26.1 (50ac)
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 17 August 2015
Resolution: Via class report: The access ports on both port and stbd sewage tanks found reparied as necessary and all missing bolts rectified. After repairs of the access ports on port and stbd sewage tanks now are confirmed in good conditions.
Construction/Loadline › Structures › Deck Plating
Issued 17 July 2015 Resolved
PSCO found a hole in the deck plating by the STBD sewage tank caused by excessive wastage of the deck plating. 74 SOLAS 97 cons ed I/11 (50ac)
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 17 August 2015
Resolution: Via class report: The hole in the deck plating next to the stbd sewage tank has been repaired by new insert. Now the insert in the deck plating was checked with satisfactory results.
Documentation › Logs/Records › Logbook (official)
Issued 17 July 2015 Resolved
Vessel had not conducted all of the required pre-arrival tests including the emergency generator, emergency steering and several other tests. 33 CFR 164.25 40c
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 July 2015
Resolution: Vessel submitted proof of tests via ship''s logs.
Lifesaving › Launching Appliances › Davit
Issued 17 July 2015 Resolved
The hydraulic piping brackets are missing or wasted. On the power pack , one pressure guage is missing and the other two (2) guages are not readable. Various piping hydrolic fittings are wasted and leaking. 74 SOLAS 2014 cons ed III/20.3.1 (50ac)
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 17 August 2015
Resolution: via class report: the rescue boat davit has been repaired as necessary. The missing and wasted hydraulic piping brackets have been rectified with new ones. All three (3) pressure gauages at hydraulic piping system have been replaced with new ones delive
Lifesaving › Inflatable Liferafts › Painter
Issued 16 October 2014 Resolved
0628 - Inflatable liferafts used in conjunction with MES shall comply with the requirements of section 4-2. The liferafts 4, 13, 17, 18, & 24 were found with the painter lines falling off the liferaft line storage pockets. 74 SOLAS (09) III/26.2.3.1. Code 50a.
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 17 November 2014
Resolution: Witnessed painter lines properly stowed in stowage pockets.
Stability › Watertight Integrity › General
Issued 16 October 2014 Resolved
0999 - In Ro-Ro passenger ships, penetrations at the bulkhead deck which are on the main deck (ro-ro) deck shall be capable of withstanding impact pressure due to sloshing of water on the ro-ro deck. PSCO noted that a pipe penetration from garage B to the port sideshell sewage space leaked. 74 SOLAS (04) II-1/19.5. Code 50a.
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 16 November 2015
Resolution: Witnessed repairs. Penetration from garage B no longer leaks.
Stability › Watertight Integrity › General
Issued 16 October 2014 Resolved
0999 - In Ro-Ro passenger ships, penetrations at the bulkhead deck which are on the main deck (ro-ro) deck shall be capable of withstanding impact pressure due to sloshing of water on the ro-ro deck. PSCO noted that a soft patch on garage deck B which leaked water into the engine room during a test of the deluge system. 74 SOLAS (04) II-1/19.5. Code 50a.
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 17 November 2014
Resolution: Witnessed repairs, water no longer leaking into the engine room.
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 16 October 2014 Resolved
0999 - The crew gym on deck 5 was used as a carpenter shop. Combustibles and flammables were also stored in the space. To remain as a workshop, the space needs to meet category 13. Space is currently listed as a category 8 space on the structural fire plan. 74 SOLAS (97) II-2/26.1. Code 10c.
Action required: 705 - Other - as specified
Due 17 October 2014
Resolved 17 October 2014
Resolution: Deficiency was rectified on the spot; unauthorized items were removed, allowing the space to comply with category 8 again.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Nozzles
Issued 16 October 2014 Resolved
0725 - Fire extinguishing appliances shall be kept in good order and be ready for immediate use at all times. Five drencher heads on garage deck B were blocked. 74 SOLAS (97)/II-2/21. Code 50a.
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 17 November 2014
Resolution: Received statement from class certifying that the crew removed and cleaned the drencher heads. Heads were re-installed and tested with satisfactory results.
Electrical › Electric Generation Source (service) › Generator
Issued 16 October 2014 Resolved
The condition of the ship and its equipment shall be maintained to conform with provisions of the present regulations. PSCO noted fuel oil weep on No. 3 generator IWO exhaust manifold. 74 SOLAS (09) I/11. Code 40ac.
Action required: 705 - Other - as specified
Due 16 November 2014
Resolved 17 November 2014
Resolution: Received statement from Class certifying that the cylinder cover No. 1 on No.3 Generator was removed and the gasket was renewed. Cover was secured and no longer presents a leak.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 22 August 2014 Resolved
0999 - Safety in General - When cylinders are not in use, they must be stowed in a rack in the upright position. Nitrogen and oxygen bottles were found stored without racks and/or laying flat on the deck in forward and aft areas of cargo deck C. To the satisfaction of the Coast Guard. 46 CFR 147.60(b).
Action required: 705 - Other - as specified
Due 5 September 2014
Resolved 5 September 2014
Resolution: crew moved cylinders to a bracket in aft secting or cargo hold C.
Fire Fighting › Structural - A Class Divisions › Store-rooms
Issued 22 August 2014 Resolved
0750 - Fire Prevention - Fire integrity of bulkheads and decks shall be meeting the requirements for a Category 13 space per Table 26.1. Passenger cabin 5146 was being used to store cases of beer. Cleared on the spot. To the satisfaction of the Coast Guard. 74 SOLAS (97) II-2/26.1
Action required: 705 - Other - as specified
Resolved 22 August 2014
Fire Fighting › Structural - A Class Divisions › Doors
Issued 22 August 2014 Resolved
0999 - Safety in General - All doors shall be capable of remote and automatic release from a continuously manned central control station. Hold-back hooks not subject to control control station release are prohibited. A hold-back was found on the door at the port bunkering station. Cleared on the spot. To the satisfaction of the Coast Guard. 74 SOLAS (97) II-2/30.4.3
Action required: 705 - Other - as specified
Resolved 22 August 2014
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 20 August 2014 Resolved
0945: The transitional source of emergency power shall be so arranged to supply automatically in the event of power failure. The batteries were found to be fully discharged with the charger in the off position and unable to assume the transitional loads and lights 74 SOLAS (04ed) II-1/42.4.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 August 2014
Resolved 20 August 2014
Resolution: All nine - 12 volt batteries had been replaced. The batteries were fully charged and the transitional power system was in operation.
Fire Fighting › Automatic Sprinkler System › Pressure Tank
Issued 20 August 2014 Resolved
0725: The required automatic sprinkler system shall be capable of immediate operation at all times with no action required by the crew to set it in operation. The sprinkler pressure tank was completely full without required air head pressure that would provide the one (01) minute discharge of the system as required by 74 SOLAS (97ed) II-2/12.4.1.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 August 2014
Resolved 20 August 2014
Resolution: The sprinkler pressure tank had been drained to 1400 liters of water charge at 6 bars of pressure as required by the posted system diagram.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 20 August 2014 Resolved
0750: The fire screen doors shall be capable of closing at an angle of inclination of up to 3.5 degrees. The following double-leaf doors are closing out of sequence which prevents the doors from fully closing and catching: FSD 512, 622, 623 and 707. There was evidence the the doors were fitted with sequencing devices in the past.
Action required: 705 - Other - as specified
Due 3 September 2014
Resolved 5 September 2014
Resolution: crew proved operation of double-leaf doors 512, 622, 623, 707.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 20 August 2014 Resolved
0999: No person may operate any vessel equipped with installed toilet facilities unless it is equipped with an operable type II or type III device. The sanitation system was not operating as designed and approved; it was found to be pressed full and overflowing into the sewage compartment 33 CFR 159.7.
Action required: 705 - Other - as specified
Due 20 August 2014
Resolved 20 August 2014
Resolution: Sewage was pumped to a vacuum truck and inspection cover was properly secured.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 20 August 2014 Resolved
0750: All doors shall be capable of remote and automatic release from a continuous manned central control station. Hold back hooks not subject to central control station release are prohibit. The following doors were fitted with various improvised hold backs that were not subject to automatic release; 301, 309, 310, 313, and 527 74 SOLAS (97ed) II-2/4.3 .
Action required: 17 - Rectify deficiencies prior to departure
Due 20 August 2014
Resolved 20 August 2014
Resolution: Safety officer was notified of all hold backs and doors were immediately released and hold backs were removed.
Documentation › Safety Management System › Key Shipboard Operations Plans/Instructions
Issued 20 August 2014 Resolved
2550: The company and the ship shall comply with the requirements of the ISM Code. Objective evidence discovered during an expanded ISM exam revealed major non-conformities. Specifically there are no instructions to ensure: (1) That the transitional power battery charger in turned on after system maintenance. (2) To ensure proper water level is maintained in sprinkler tank. Rec an external audit.
Action required: 705 - Other - as specified
Due 20 September 2014
Resolved 17 October 2014
Resolution: Vessel provided evidence that RINA conducted external audit of SMS. No major non-conformities were found.
Electrical › Electric Supply System (service) › Cable
Issued 20 August 2014 Resolved
0950: Cables and wiring shall be installed and supported in such manner as to avoid chafing or other damage. Two portable fans were found temporarily rigged using extension cords to provide additional cooling to A/C compressor 74 SOLAS (97ed) II-1/45.5.5.
Action required: 705 - Other - as specified
Due 20 September 2014
Resolved 5 September 2014
Resolution: Portable fans removed by crew
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 20 August 2014 Resolved
2035: Fire Control Plans shall be kept up to date with any alterations recorded as son as possible. Fire Control Plan currently contains contradictory information; a total of 23 fire protective clothing is listed in the Fire Control Plan but adding up each fire locker gives a total of 21 fire protective clothing 74 SOLAS (09ed) II-2/15.2.4.1.
Action required: 705 - Other - as specified
Due 17 December 2014
Resolved 18 December 2014
Resolution: Pen and Ink changes made to Fire Control Plan made by Class
Fire Fighting › Firemans Outfit › Quantity
Issued 20 August 2014 Resolved
2035: The Fire Control Plan and SOLAS require the vessel to have 16 fireman's outfits which include a breathing apparatus. Currently, the vessel has 13 breathing apparatus onboard 74 SOLAS (97ed) II-2/17.1.2.2.
Action required: 705 - Other - as specified
Due 3 September 2014
Resolved 5 September 2014
Resolution: crew opbatined 03 new firemans outfits
Fire Fighting › Automatic Sprinkler System › Pump
Issued 28 March 2014 Resolved
Any required automatic sprinkler system shall be capable of immediate operation at all times and no action by the crew shall be necessary to set it in operations. The sprinkler hydrphor tank was found to be empty. SOLAS 1997 ed II-2 Reg 12.1.1 & SOLAS 2009 ed II-2 Reg 14.1.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2014
Resolved 29 March 2014
Resolution: Class conducted an external inspection of the pump and found it to be satisfactory. See attached Class Report.
Electrical › Electrical Distribution System (emergency) › Switchboard
Issued 28 March 2014 Resolved
Where the emergency source of power is a generator a transitional source of power shall be provided. The accumulator batteries and associated transforming equipment were render inoperable. due to the fire. SOLAS 1997 ed II-I Reg 42
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 28 March 2014
Resolved 29 March 2014
Resolution: Flag issued a Dispensation Letter. See attach document.
Electrical › Electrical Distribution System (emergency) › Switchboard
Issued 28 March 2014 Resolved
No accumulator battery fitted in accordance with this regulation shall be install in the same space as the emergency switch board, the accumulator batteries for the transitional source power and the emergency switch board are currently installed in the same space. SOLAS 1997 ed II-I Reg 42.5.3
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 March 2014
Resolved 29 March 2014
Resolution: Class issued a condition of class to repaired by next dry dock and completed by June 5, 2014. See attach document.
Construction/Loadline › Structures › Machinery Space Opening
Issued 28 March 2014 Resolved
The space containing the transitional source of power shall not be contiguous to the boundaries of machinery space of Category A. The transitional power is contiguous to the machinery/space class A. SOLAS 1997 ed II-I Reg 42.1.3
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 March 2014
Resolved 29 March 2014
Resolution: Class issued a condition of class to repaired by next dry dock and completed by June 5, 2014. See attach document.
Electrical › Lighting (emergency) › Lighting Feeder
Issued 28 March 2014 Resolved
The arrangements of emergency electric lighting shall be such that a fire or other casualty in spaces containing the emergency source of electrical power does not render the main electrical lighting required by this regulation in-operative. The main lighting in staircase 7,8 between deck 5 and 6 is inoperable. SOLAS 1997 ed II-! Reg 41.2.3 & 41.2.1
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 28 March 2014
Resolved 29 March 2014
Resolution: Class attested to the satisfactory repairs to the lighting prior to departure. See attach document.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Distributor (fuel injection)
Issued 28 March 2014 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in respects remains fit to proceed to sea without danger to the ship or persons on board. The aft cylinder on the port side generator had two fuel oil leaks in two high pressure fuel lines. SOLAS 2009 ed Ch I Reg 11-1(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2014
Resolved 29 March 2014
Resolution: Rectified to the satisfaction to the attending Marine Inspector.
Construction/Loadline › Structures › Door
Issued 28 March 2014 Resolved
Fire doors shall be self-closing. The fire door on deck 6 port aft outer staircase will not close. SOLAS 1997 ed II-2 Reg 30.4.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 March 2014
Resolved 29 March 2014
Resolution: Repaired to the satisfaction of the attending class surveyor. See attach document.
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 20 June 2012 Resolved
Each emergency electrical generating set shall be provided with a second source of energy for an additional 3 starts within 30 minutes. During operational test of vessel's emergency generator, the secondary starting source (battery bank) was determined to be INOP. Proper operation of secondary means of starting required to be verified by CG marine inspectors prior to departure.
Action required: 705 - Other - as specified
Due 20 June 2012
Resolved 20 June 2012
Resolution: Starting of emergency generator via 2 independent means verified by attending CG PSCOs.
Construction/Loadline › Structures › Ventilators
Issued 1 June 2012 Resolved
74SOLAS (CONS 01) II-2/32 Exhaust ducts from a machinery space shall be fitted with fire dampers. PSCO found fire damper on aft port stack not closing completely.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 July 2012
Resolved 20 June 2012
Resolution: Inspected by RIO Ponce PSCOs - full damper closure verified. Class (BV) to attend during week of 25JUN2012, to provide full report as per original deficiency requirement. Deficiency considered cleared for the purposes of CG casework.
Fire Fighting › Firemans Outfit › Helmet
Issued 1 June 2012 Resolved
74SOLAS (CONS 01) II-2/17.1.1.1 Vessel is required to have a fireman's outfit comprised of protective material and protect skin from heat, burns, and scalding. Three fire fighting helmets did not protect skin by leaving neck and ears exposed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 June 2012
Resolved 12 June 2012
Resolution: Received Class report attesting to the replacement of the fireman’s outfits to satisfy the requirement.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 1 June 2012 Resolved
74 SOLAS (CONS 09) I/II The condition of the ship and equipment shall be maintained. PSCO found button to unknown equipment no longer mount to bulkhead and inoperable on deck 6 port side of structure aft of pool.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 July 2012
Resolved 20 June 2012
Resolution: Inspected by RIO Ponce PSCOs - electrical equipment was actually an electrical outlet. Properly mounted. Class (BV) to attend during week of 25JUN2012, to provide full report as per original def requirement. Def considered cleared for the purposes of CG.
Lifesaving › Lifeboat › Propulsion Engine
Issued 1 June 2012 Resolved
74 SOLAS (Cons 01) III/26.3.2 RO-RO Passenger ships shall have one fast rescue boat port fast rescue boat not fully operational.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 June 2012
Resolved 1 June 2012
Resolution: Fast rescue boat repaired.
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 1 June 2012 Resolved
74 SOLAS (CONS 01) II/-2/41-2.4.1 Vessel is required to have fire screen doors that close properly, self closing fire screen door in way of Scala #5, aft of port seating area unable to shut completely and stay latched when shut.
Action required: 705 - Other - as specified
Due 1 June 2012
Resolved 1 June 2012
Resolution: Fire screen doors repaired to close completely.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 27 February 2012 Resolved
0660-A life jacket shall be provided for every person onboard the ship and should be readily accessible. PSCO found lifejacket lockers on Deck 6 missing a storage keys crew was unable to access lifejackets.-74SOLAS (97cons) III 7.2- 10c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 February 2012
Resolved 27 February 2012
Resolution: Corrected on the spot, the keys was recovered and properly place in lock boxes the port and starboard side on Deck 6.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 27 February 2012 Resolved
0715- Passenger ships shall be equipped with a fire detection system in all service spaces. PSCO found smoke detectors in dining room buffet line and passenger cabin 6141 not operable-71SOLAS (97cons) II-2.36.2-10c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 February 2012
Resolved 27 February 2012
Resolution: Vessel crew replaced both smoke detectors.
Lifesaving › Lifeboat › Windows/Translucent Panels
Issued 27 February 2012 Resolved
0610-All lifeboats shall be properly constructed and be of such form to have ample stability in a seaway. PSCO found aft doors on lifeboat #3 with cracks on Plexiglass. 74SOLAS (97cons) III 41.1.1-50a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 April 2012
Resolved 28 April 2012
Resolution: Vessel replaced the plexiglass doors on lifeboat #3.
Electrical › Electric Supply System (service) › Cable
Issued 27 February 2012 Resolved
0950-Cables and wiring shall be installed in such manner as to avoid chafing or other damage. PSCO found light switch in Deck 5 housekeeping locker hanging from bulkhead unsecured.-74SOLAS(97cons)II-1-45.5.5- 50c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 March 2012
Resolved 2 April 2012
Resolution: Light switch remounted.
Fire Fighting › Miscellaneous Items › Waste Receptacles
Issued 27 February 2012 Resolved
0710- All waste receptacles shall be constructed of non-combustible material with no openings in the sides or bottom; found numerous waste receptacles made of plastic or metal with holes in passenger cabin heads and in crew cabins #54 and 58.-74SOLAS(97cons)II-2.18.5 -50c
Action required: 705 - Other - as specified
Due 29 March 2012
Resolved 2 April 2012
Resolution: Items removed.
Fire Fighting › Structural - A Class Divisions › Aux Spaces (little/no fire risk)
Issued 27 February 2012 Resolved
0710- CAT. 10 spaces shall not be used for storage, found excess storage in a/c space on decks-74SOLAS(97cons)II-2.03.2.2(10)-50c
Action required: 705 - Other - as specified
Due 29 March 2012
Resolved 2 April 2012
Resolution: All items removed.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 27 February 2012 Resolved
0730- Doors in A class divisions are prohibited to have hold backs not subjects to central control station release, buffet line to main galley port door #517 was wedged open due to inoperable release mechanism. 74SOLAS (97cons)II-2.30.4.3- 10c
Action required: 705 - Other - as specified
Due 27 February 2012
Resolved 27 February 2012
Resolution: Items were removed; corrected on the spot.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device Recorder
Issued 29 August 2011 Resolved
An echo depth sounding device. A device that can continuously record the depth readings. No echo depth sounding paper. 33 CFR 164.35 (h) 16
Action required: 705 - Other - as specified
Due 13 September 2011
Resolved 23 September 2011
Resolution: Paper on board and installed in echo depth sounder; recording properly.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 29 August 2011 Resolved
Provide outer deck rails that are 42 inches in height, deck 6 aft. per 46 USC 3507 (a)(1)(a).
Action required: 705 - Other - as specified
Due 27 January 2012
Resolved 27 January 2012
Resolution: It has been determined that the CVSSA does not apply to the vessel since there are not ovenight accomidations for every passenger.
Documentation › Certificates/Documents › Passenger Ship Safety Certificate
Issued 29 August 2011 Resolved
Provide sexual assault access to information and communication per 46 USC 3597 (d)(5).
Action required: 705 - Other - as specified
Due 13 September 2011
Resolved 23 September 2011
Resolution: Contact information onboard for american consulate in the DR and PR/DR police departments. Master and Staff Captain to have posted on back of doors for all passenger cabins.
Navigation › Collision/Grounding Avoidance › Danger Messages
Issued 29 August 2011 Resolved
Every ship shall be provided with a receiver capable of receiving international NAVTEX service broadcasts. Vessel did not have the proper paper onboard for the operation of the NAVTEX. 74/78 SOLAS 2009 ch IV reg 7.1.4
Action required: 705 - Other - as specified
Due 13 September 2011
Resolved 23 September 2011
Resolution: Paper on board and installed in NAVTEX; NAVTEX printing properly.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.