Records from 2017 to 2023. Most recent: inspection, 18 May 2023.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 18 May 2023
Resolved
One or more pressure / vacuum breaking devices shall be provided to prevent the cargo tanks from being subject to:(.1) A positive pressure. PSCO identified worn/damaged flame screen for PV breaker.
74 SOLAS (09) II-2 / 11.6.3.4
17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 May 2023
Resolution: Class report on rectified issue was received through port state duty inbox. All sat.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 30 September 2021
Resolved
06106-Cargo Transfer- Trankers For tankers of 20,000 tonnes deadweight and upwards, the protection of the cargo tanks shall be achieved by a fixed inert gas system in accordance with the requirements of the Fire Safety Systems Code. The system shall be designed to ensure that if the oxygen content exceeds 5% by volume the inert gas shall be automatically vented to atmosphere. The automatic venting valve on the main IG line was not operable in the automatic mode.74 SOLAS 09 II-2/4.5.5.1.1 FSS Code 15/ 2.2.2.4
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Due 30 September 2021
Resolved 4 October 2021
Resolution: See Documentation: Survey Statement Narrative
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 30 September 2021
Resolved
06106- Cargo Transfer- Tankers If cargo loading and ballasting or discharging of a cargo tank or cargo tank group which is isolated from a common venting system is intended, that cargo tank or cargo tank group shall be fitted with a means for over-pressure or under-pressure protection. Pressure vacuum valves on tanks 1S, 2P, 4P, 5P, 6P, port slop, starboard slop, and oil residue were not fully operable to provide vacuum relief.74 SOLAS 09 II-2/4.5.3.2.3
Condition: Improper/Lack of Maintenance
Action required: 703 - Prior to bunkering operations
Due 4 October 2021
Resolved 4 October 2021
Resolution: See Documentation: Survey Statement Narrative
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 September 2021
Resolved
13105-Auxiliary engine - Means shall be provided to control leaks of flammable liquids. PSCOs witnessed evidence of lubrication oil leaks on ship’s service diesel generators #2 and #3.74SOLAS(09)II-2/4.1.1
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 4 October 2021
Resolved 4 October 2021
Resolution: See Documentation: Survey Statement Narrative
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 September 2021
Resolved
13102 - Auxiliary Engine- The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The RPM governor for the #1 ship’s service diesel generator was temporarily secured, not as designed, with a wire to prevent the governor from hitting the deactivation limit switch.74 SOLAS(20)I/11(a)
Condition: Damaged By Earlier Event
Action required: 703 - Prior to bunkering operations
Due 4 October 2021
Resolved 4 October 2021
Resolution: See Documentation: Survey Statement Narrative
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 30 September 2021
Resolved
02101 - closing devices- watertight doors All access openings in bulkheads at ends of enclosed superstructures shall be fitted with doors of steel or other equivalent material, permanently attached to the bulkhead, and framed and stiffened and fitted so that the whole structure is of equivalent strength to the un-pierced bulkhead and weather tight when closed. The means for securing these doors weathertight shall consist of gaskets and clamping devices or other equivalent means and shall be permanently attached to the bulkhead or to the doors themselves. The knife-edge and gasket to the weathertight doors for the following spaces were significantly wasted: CO2 room, sample locker, upper deck IG room, and SOPEP stores.ILLC (88) II/12
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 2 January 2022
Resolved 13 October 2021
02 - Structural Conditions › N/A - No Subsystem › Safe access to tanker bows
Issued 30 September 2021
Resolved
02127 - save access to tanker bows- Every tanker constructed on or after 1 July 1998 shall be provided with the means to enable the crew to gain safe access to the bow even in severe weather conditions. The condition of the walkway, for the purpose of safe access to the bow, showed excessive rust and wastage.74SOLAS(04)II-1/3-3.2
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 4 October 2021
Resolved 4 October 2021
Resolution: Repaired / Rectified: The severely corroded walkway platform gratings were renewed at many places.
The bow access platform was surveyed and found in order.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 September 2021
Resolved
13199 - other (machinery) - Every steam pipe and every fitting connected thereto through which steam may pass shall
be so designed, constructed and installed as to withstand the maximum working stresses to which it may
be subjected. Steam pipe located in the overhead on the main engine space was holed and leaking.
Convention 74 SOLAS (04) II-1/33.1
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 4 October 2021
Resolved 4 October 2021
Resolution: Repaired / Rectified: The holed condensed steam pipe section was renewed, located by starboard AFT
E.R. upper platform.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 30 September 2021
Resolved
07113 - Fire pump and its pipes - A valve shall be fitted to serve each fire hydrant so that any fire hose may be removed while
the fire pumps are in operation. Isolation valve for the fire hydrant on the port bridge wing was observed
to be leaking.74 SOLAS (09) II-2/10.2.1.4.2
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 4 October 2021
Resolved 4 October 2021
Resolution: Repaired / Rectified: A new fire hydrant valve was fitted on the port bridge wing, tested, and found in
order.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 30 September 2021
Resolved
03107- Doors - Each ship shall have a scale of draught marked clearly at the bow and stern. Bow draught
marks were not clearly marked due to excessive rust and wastage.74 SOLAS (04) II-1/8.7.3
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2021
Resolved 4 October 2021
Resolution: Repaired / Rectified: The bow draught marks were found marked clearly.