MAURY USCG vessel records
← All vessels

JOHN BLANCHE

JOHN BLANCHE is a 2010 tank barge. The Coast Guard has recorded 32 inspections since 2010, most recently in June 2025, along with 41 deficiencies and 5 casualty investigations between 2013 and 2022.

Records from 2010 to 2025. Most recent: inspection, 11 June 2025.

Built
2010
Last inspected
11 June 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

1087513
Flag
UNITED STATES
Maury page id
psix-1087513

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspections, by type

…with no type recorded6
Years with a record 15 calendar years (2010–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Registered dimensions (L × B × D)195.0 ft × 38.0 ft × 15.0 ft
Registered tonnagegross 933 / net 933
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC PLANT 38 · MADISONVILLE, LA, UNITED STATES · built 2010
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeBox
Hull configurationMonohull
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 21 April 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it933 - Simplified, Net Ton
933 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

What it gives that this page does not: the whole record in one dated, citable document — every line with its Coast Guard activity id, the retrieval date on the cover, built to print to PDF with its page breaks — that a surveyor can attach and a lender can file. The same facts as this page, complete and in one file.

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

A request, not a checkout: leave an email and Maury replies once, with the dated document for this hull and a Stripe invoice for $299. Nothing is charged before the document is in your hands.

Inspected as a tow unit · 3

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

STEPHEN B Towing Vessel · MISLE 217559 · 26 April 2022 · activity 7438433DIANE B Towing Vessel · MISLE 191381 · 2 December 2020 · activity 7117721DIANE B Towing Vessel · MISLE 191381 · 19 February 2019 · activity 6635081DIANE B Towing Vessel · MISLE 363326 · 16 October 2015 · activity 5751617DIANE B Towing Vessel · MISLE 191381 · 26 November 2011 · activity 4196688

Inspection history · 32

11 June 2025 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8157144
7 January 2025 MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8059248
3 May 2024 In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7906202
8 January 2024 Deficiency Check · Periodic Inspection · Administrative Inspection · MTSA Verification · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7846736
27 September 2023 Bulk Liquid Transfer Monitor
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 7799334
12 December 2022 Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7607835
26 April 2022 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7438433
17 November 2021 Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7352652
2 December 2020 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7117721
28 September 2020 COI Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7066654
19 August 2020 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7035154
5 March 2020 Bulk Liquid Transfer Monitor
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6921777
4 February 2020 Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6908555
20 November 2019 MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6858973
19 February 2019 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6635081
15 December 2018 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6601430
4 December 2018 Periodic Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6591635
28 September 2018 Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6550479
16 May 2018 Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6416239
27 November 2017 Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6313067
6 October 2016 Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6016903
11 March 2016 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5831578
16 October 2015 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5751617
28 September 2015 COI Inspection · Drydock Exam · Internal Structural Exam · Cargo Tank Internal · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5735427
14 October 2014 Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5004639
29 January 2014 Periodic Inspection · MTSA Verification · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4791095
26 October 2012 Administrative Inspection · Annual Inspection · MTSA Verification · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4472702
5 December 2011 Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4201589
26 November 2011 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4196688
10 November 2010 Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3923888
3 November 2010 Construction Oversight
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3884162
14 September 2010 Load Line/Change of Employment · MTSA Verification · Internal Structural Exam · Construction Oversight · Deadweight Survey · COI Inspection · Administrative Inspection · Cargo Tank Internal
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3849404

Deficiency record · 41

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 7 January 2025 Resolved
No person may use any equipment listed in paragraph (c) of this section for transfer operations unless the vessel tests and inspects the equipment. Vessel representatives presented hose test records attesting to insufficient test psi. (150spi) for both port and starboard cargo hoses and the vapor hose. Prior to transfer operations ensure all cargo hoses are tested to the required psi (1.5x MAWP) Test target based on service pressure of 200 psi. Test pressure (300psi). Provide documentation attesting to sufficient hose test.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 January 2025
Resolution: Vessel aquired new cargo/bunkering hose and provided certificate of manufacture to include pressure test.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 7 January 2025 Resolved
Each cargo tank of a tank barge must have one of the following liquid overfill protection arrangements. During testing of the tank overfill protection the visual overfill indicator light failed to display for all four (04) cargo tanks.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 January 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 January 2024 Resolved
Each pressure vessel must be subjected to a hyrdostatic test at a pressure of 1 1/4 times the maximum allowable working pressure twice within any five-year period, except that no more than three years may elapse between any test and its immediate predecessor. Provide U1-A form as a specifications reference of the newly installed pressure vessel and conduct hydrostatic test in the presence of a marine inspector. Rectify in 21 days.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 February 2024
Resolved 1 February 2024
Resolution: [name withheld]. item complete
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 January 2024 Resolved
At each inspection for certification and periodic inspection the marine inspector shall conduct such tests and inspections of the main propulsion and auxiliary machinery and of its associated as he feels necessary to check safe operation. The overspeed and low lube oil tests for the auxiliary generator could not be conducted at the time of inspection. Rectify in 21 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 February 2024
Resolved 26 February 2024
Resolution: [name withheld]. Item Complete
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 January 2024 Resolved
Each cargo vessel must carry the number of lifebuoys prescribed in table 199.271 of this section. The table prescribes that the vessel must carry 08 lifebuoys to meet regulatory compliance. Acquire proper number of lifebuoys or route for equivalency within 14 days.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 1 February 2024
Resolved 1 February 2024
Resolution: [name withheld]. item complete
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 January 2024 Resolved
Tank vessels that operate in salt water must be inspected in accordance with the intervals set forth in table 31.10-21(a). Where table 31.10-21(a) indicates a 2.5 year examination interval, it means a vessel must undergo two examination within any five year period. No more than three years may elapse between any two examinatinos. Vessel did not meet ISE due date and is restricted from conduction cargo operations until ISE is completed.
Action required: 705 - Other - as specified
Resolved 11 January 2024
Resolution: Completed ISE on periodic inspection date.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 December 2022 Resolved
Each cargo tank must be equipped with an intrinsically safe high-level alarm and a tank overfill alarm. The overfill alarm for all cargo tanks could not activate during the test. Rectify prior to utilizing the Vapor Control System and w/in 14 days. 46 CFR 39.2007(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 December 2022
Resolved 18 January 2023
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 December 2022 Resolved
The high-level alarm and tank overfill alarm must activate an alarm in the event of loss of power to the alarm system. The overfill alarm for all cargo tanks did not activate during the loss of power alarm test. 46 CFR 39.2007(b)(3)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2022
Resolved 18 January 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 December 2022 Resolved
The Vessel Security Plan must not be carried on board the vessel, but must be maintained in a secure location. The VSP was found in an unsecured cabinet, where it was normally stored on the unmanned barge. 33 CFR 104.120(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2022
Resolved 18 January 2023
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 17 November 2021 Resolved
The high-level alarm and tank overfill alarm must activate an alarm in the event of a loss of power to the alarm system. The loss of power alarm was not functioning properly while activated. Rectify within 14 days.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 December 2021
Resolved 29 November 2021
Resolution: Recieved documentation to clear 01 df for hose makrings.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 17 November 2021 Resolved
Transfer hoses must be marked with the name of each product the hose is used for or for oil products the word "Oil Service," or for hazardous material the words "Hazmat Service-See list."...the hose must also be marked with the maximum allowable working pressure. The transfer hoses were not marked with the type of service or the MAWP. Rectify within 14 days
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 December 2021
Resolved 7 December 2021
Resolution: Recieved documentation to clear 01 df for the loss of power alarm
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 September 2020 Resolved
Each pressure vessel listed on the Certificate of Inspection must be thoroughly examined externally every 5 years. Air receiver on the vessel must could not be opened up for a visual inspection by Inspectors and needs to be hydro-statically tested.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 September 2020
Resolved 20 October 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 September 2020 Resolved
Gears, couplings, flywheels and all machinery capable of injuring personnel shall be provided with adequate covers or guards.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 29 September 2020
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 28 September 2020 Resolved
Ground indicator's must be at the vessel's ship service generator distribution switchboard for the normal power, normal lighting, and emergency lighting systems. 03 light bulbs on the ship's man service generator panel were out and need to be replaced.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 9 October 2020
Resolution: Vessel replacd bulbs and sent over pictures. All defs cleared.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 20 November 2019 Resolved
Nonmetallic flexible hose may be used in lube oil, fuel oil and fluid power systems only where flexibility is required and in lengths not exceeding 30 inches. Fuel line on generator chaffed beyond repair.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2019
Resolved 22 November 2019
Resolution: RECEIVED PHOTOS OF INSTALLED NEW FLEX FUEL HOSE.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 November 2019 Resolved
High level and overfill alarm must activate an alarm in the event of loss of power to the alarm system. Loss of power alarm inoperable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2019
Resolved 28 January 2020
Resolution: Vessel provided video of loss of power alarm.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 November 2019 Resolved
Cargo pump relief valve shall be tested at least once each year to determine that they function satisfactorily at the pressure at which they are set to open. Cargo pump relief valve last inspected September 2018.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 December 2019
Resolved 7 February 2020
Resolution: Vessel operator provided a certificate attesting to test procedure for pressure relief test on 24November2019.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 4 December 2018 Resolved
The requirements of 58.10-05 (A) shall apply to diesel engine installations. All installations shall be of marine type engines suitable for the intended service, designed and constructed in conformance with the requirements of this sub-chapter. Cargo pump engine & generator tachometers inoperable and unable to provide operating RPM.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 18 December 2018
Resolved 6 February 2019
Resolution: Verified installation of new tach
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 4 December 2018 Resolved
At each inspection for certification and periodic inspection the marine inspector shall conduct such tests and inspections of the auxiliary machinery and of its associated equipment. Overspeed and low lube oil tests could not be conducted.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 December 2018
Resolved 6 February 2019
Resolution: Vessel demonstrated L/O shutdown and vessel has a letter for alternative way to conduct overspeed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 December 2018 Resolved
A cargo handling room must not have any electric cable or other electric equipment, except: (2) Explosion proof lighting fixtures. One light in the cargo pump room was missing containment cage.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 January 2019
Resolved 6 February 2019
Resolution: Cage was replaced on light
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 28 September 2018 Resolved
Each tank vessel must undergo Internal Structural Exams in accordance with table 31.10-21(a). Vessel shall be taken out of service until the vessel can be inspected to the satisfaction of the attending CG Marine Inspector. Vessel representative shall submit a letter to CG stating the vessel is taken out of service and will not be conducting operations until the ISE is complete.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 2 October 2018
Construction/Loadline › Hull › Side Shell
Issued 16 May 2018 Resolved
Inspectors may at any time lawfully inspect any tank vessel. Company shall make barge available for damage survey prior to any cargo operations. Gas free barge to enable marine inspectors to enter affected spaces and assess damage to barge.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 May 2018
Resolution: Inspectors conducted survey and found no structural damage
Electrical › Electric Generation Source (service) › Power Requirement
Issued 5 October 2015 Resolved
MI's were unable to conduct over speed test on the generator due design and installation of protection. The over speed mechanism will need to be replaced in kind and calibrated to the engines specs or tested by a certified technician. Due to design, over speed will on be required to be replaced in kind on 5 year intervals instead of testing.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 5 November 2015
Resolved 4 November 2015
Resolution: Vessel representive replaced over speed device in kind and calibrated to engine specs. Doc's in activity.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 5 October 2015 Resolved
Pressure gauges shall be installed at each cargo pump and is shall be located at a point visible from the control station. 46CFR32.50-5
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 November 2015
Resolved 4 November 2015
Resolution: Vessel installed port light to view gauge from control room.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Adapters
Issued 14 October 2014 Resolved
Ensure port/stbd VCS flanges have permanently attached 0.5" diameter stud at least 1" long projecting outward at the 12 o'clock position. IAW 46CFR39.20-3(e)
Due 29 October 2014
Resolved 29 October 2014
Resolution: Received pictures verifying permanent installation of studs.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 14 October 2014 Resolved
Ensure the 3 cargo hoses on board are properly marked and documented with corresponding manufacturing and servicing paperwork IAW 33 CFR 154.500, required by 33CFR155.800.
Due 29 October 2014
Resolved 3 November 2014
Resolution: Received paperwork and pictures verifying the proper testing of the 3 cargo hoses.
Electrical › Electrical Distribution System (service) › Conductor
Issued 29 January 2014 Resolved
Generator and cargo gage are wired with non approved romex solid copper wire. 46 CFR 111.60-1(a)
Due 26 February 2014
Resolved 27 February 2014
Resolution: Romex cable was removed.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 29 January 2014 Resolved
Vessel is required to demonstrate proper operation of their 440v and 120v ground detector system. 46 CFR 111.05-25
Due 17 March 2014
Resolved 17 March 2014
Resolution: Vessel demonstrated proper operation of their 440v and 120v ground detector system.
Engineering › Compressed Air System (control) › Valve
Issued 29 January 2014 Resolved
Pressure vessel relief valve did not relieve at or below MAWP of tank. 46 CFR 54,15-10(a)
Due 26 February 2014
Resolved 27 February 2014
Resolution: Witnessed the pressure relief valve testing. Relief valve relieved at the MAWP (200)
Deck/Cargo › Cargo Stowage › General
Issued 29 January 2014 Resolved
Vessel is prohibited from carrying cargoes containing greater than 0.5% benzene until demonstrating compliance with the provisions of 46 CFR part 197, Subpart C as applied.
Action required: 705 - Other - as specified
Resolved 30 May 2014
Resolution: Vessel does not have intentions of carrying benezene containing cargoes >.05%. Amended the COI to require compliance with 46 CFR 197 subpart C prior to carrying >.05% benezene containing cargoes.
Deck/Cargo › Vapor Control Systems › Liquid Overfill Protection
Issued 29 January 2014 Resolved
Vessel is required to demonstrate proper operation of loss of power alarm for Liquid Overfill Protection system.
Due 17 March 2014
Resolved 17 March 2014
Resolution: Vessel demonstrated proper operation of loss of power alarm for Liquid Overfill Protection system.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 29 January 2014 Resolved
Vessel is required to provide a copy of documentation of satisfactory testing of cargo pump relief valve. 46 CFR 35.35-70(b)
Due 26 February 2014
Resolved 26 February 2014
Resolution: Received documentation from vessel rep for the satisfactory testing of the cargo pump relief valve.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 29 January 2014 Resolved
Vessel is required to provide copy of documentation of satisfactory testing of cargo pump pressure gages. 46 CFR 35.70(c)
Due 26 February 2014
Resolved 27 February 2014
Resolution: Vessel installed two new gages.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 29 January 2014 Resolved
Vessel is required to demonstrate proper operation of their anchor system. 46 CFR 32.15(e)
Due 26 February 2014
Resolved 27 February 2014
Resolution: Witnessed the testing of the anchor.
Communications › Alarms/Indicators › Lube Oil Low Pressure Alarm
Issued 29 January 2014 Resolved
Vessel is required to demonstrate proper operation of automatic shut down upon loss of lubricating pressure to the generator. 46 CFR 111.12-1(c)
Due 26 February 2014
Resolved 27 February 2014
Resolution: Witnessed the testing of the generator automatic shutdown upon the loss of lubricating pressure.
Construction/Loadline › Hull › Weld
Issued 29 January 2014 Resolved
Complete all work list items identified during ISE on 12FEB2014 prior to next credit dry dock (30SEP2015). See documents for work list items.
Action required: 705 - Other - as specified
Resolved 6 October 2016
Resolution: Worklist items were completed in conjunction with th credit drydock on 30 September 2015.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 29 January 2014 Resolved
Vessel is required to provide a copy of documentation of satisfactory hydrostatic testing of their vapor lines. 33 CFR 156.170
Due 17 March 2014
Resolved 17 March 2014
Resolution: Vessel provided a copy of documentation of satisfactory hydrostatic testing of their vapor lines.
Electrical › Electric Supply System (service) › Cable
Issued 26 October 2012 Resolved
Tankerman house in cargo block is in hazardous zone. Window installed does not separate the house from the cargo block weather locations, and equipment inside house (computers, portable heaters, etc.) are not Class I, Div I certified. Vessel must create appropriate enclosure to divide house from weather location.
Action required: 705 - Other - as specified
Due 11 January 2013
Resolved 4 March 2013
Resolution: Windows have been permanently closed and sealed to ensure an area appropriate for Class I, Div I.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 26 October 2012 Resolved
Vessel must install proper overspeed trips on generator.
Action required: 705 - Other - as specified
Due 11 January 2013
Resolved 4 March 2013
Resolution: Reviewed calibration certification that was supplied. Overspeed was recently calibrated and governor is sealed. Unable to test at this time but certification meets intent.
Construction/Loadline › Hull › Bottom Plating
Issued 26 October 2012 Resolved
"Vessel must repair, to the satisfaction of the attending Coast Guard Marine Inspector, all void spaces which suffered internal structure damage. Vessel may shift locally, only after prior notification to and authorization by local OCMI."
Action required: 705 - Other - as specified
Resolved 6 June 2013
Resolution: All repairs have been made satisfactory, vessel is fit for intended service. See activity # 4472702 for repair details.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 30 September 2010 Resolved
Provide a copy of the Vessel Response Plan Approval letter IAW 33 CFR 155.1015 & 33 CFR 155.1040.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 November 2010
Resolved 10 November 2010
Resolution: Interim ops letter provided.

Casualty record · 5

16 March 2013Routine · role: Involved in a Marine Casualty · activity 4574285
16 October 2015Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 5751617
19 February 2019Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 6635081
2 December 2020Routine · role: Involved in a Marine Casualty · activity 7117721
26 April 2022Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 7438433
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.