MAURY USCG vessel records Sign in
← All vessels

BIG FOOT TLP

BIG FOOT TLP is a 2015 industrial vessel. The Coast Guard has recorded 32 inspections since 2011, most recently in May 2026, along with 10 deficiencies.

Records from 2011 to 2026. Most recent: inspection, 12 May 2026.

Built
2015
Last inspected
12 May 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WQQF643
1087818
Flag
UNITED STATES
—
Maury page id
psix-1087818

Inspections, by type

…with no type recorded8
Years with a record 12 calendar years (2011–2026)
The 32 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records itNot recorded
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 32

12 May 2026 Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8371706
11 December 2025 Administrative Inspection · Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8282020
1 October 2025 Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8247133
4 September 2025 Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8276127
5 June 2024 MTSA Verification · Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7929322
23 May 2023 Annual Inspection · MTSA Verification
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7700303
11 May 2022 Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7448651
27 April 2022 Annual Inspection · MTSA Verification
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7438477
18 April 2022 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7482848
10 January 2022 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7391780
21 April 2021 Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7180571
3 September 2020 MTSA Verification · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7048954
31 July 2020 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7020681
21 July 2020 COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7012206
10 September 2019 COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6807786
3 September 2019 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6808329
22 July 2019 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6758304
26 June 2019 Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6726361
15 June 2019 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6743340
10 June 2019 Security Plan Review - VSP
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 6709855
13 May 2019 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6691306
30 March 2019 Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6652644
12 March 2019 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6640980
1 February 2019 Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 6650395
25 October 2018 Construction Oversight · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6568337
28 June 2018 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6464136
13 June 2018 Administrative Inspection · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6436120
20 September 2017 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6280241
9 May 2017 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6143656
27 October 2014 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5012965
26 September 2011 Construction Oversight
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4155282
14 July 2011 Construction Oversight · COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4081152

Deficiency record · 10

11 - Life Saving Appliances › N/A - No Subsystem › Fast Rescue Boats
Issued 10 September 2019 Resolved
According to the agreement between Chevron and the D08 OCMI of 33 CFR 146.125 EEP launching requirements, you shall launch FRB every 90 days. You are in excess of that agreement. Launch FRB within 14 days. (Serial OCS-19011) Feb. 21, 2019. 33 CFR 146.125
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 September 2019
Resolved 25 November 2019
Resolution: Spoke with company and all exemptions will expire on 15DEC2019 and regular launching cycles will be commenced.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 10 September 2019 Resolved
...If a survival craft is recovered by means of power... safety devices must be provided which automatically cut off power before the davit arms or falls reach the stops... 4 ea. lifeboats had limit switches which malfunctioned in some manner as presented. 46 CFR 108.555(j)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 October 2019
Resolved 10 October 2019
Resolution: Received information from rep stating adjustment of limit switches.
09 - Working and Living Conditions › 092 - Working Conditions › Loading and unloading equipment
Issued 10 September 2019 Resolved
Deformed, cracked, or corroded members in the crane structure and boom were found during a pre-use check that were not previously identified by crew or third party. Evaluate and provide a repair proposal/repair as new. West Crane 46 CFR 108.601 API RP 2C 3.1.3.a.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 October 2019
Resolved 10 October 2019
Resolution: Received reports showing completion of crane inspection and Seatrax report. PPP and UT showed no futher issues.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Pressure
Issued 5 March 2015 Resolved
#3 GTG is not to be operated until water mist fixed fire suppression is placed is proper service.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 13 November 2018
Resolution: Cleared by attending MI.
Fire Fighting › Means of Escape › Doorways
Issued 17 February 2015 Resolved
All pnuematically operted doors living quarters and buildings are to be free of pressure, air supply valve is to be locked out , and doors shall be operated manually. Currently any single failure of the pnematic opening system fails with the doors becoming unoperable in the closed position due to pressure on the system. All of the doors are designated egress routes.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 13 November 2018
Resolution: Cleared by attending CG MI.
Fire Fighting › Fire Hydrants › Condition
Issued 17 February 2015 Resolved
Prove operation of AFFF to flight deck fire monitors (<10 seconds, >100 psi); prior to conducting any aviation fueling operations.
Action required: 705 - Other - as specified
Resolved 30 March 2015
Resolution: Received email with the ABS surveyor report and photographs demonstrating the proper operation of the heli-deck fire water foam system.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 17 February 2015 Resolved
Install flame screen on aviation fuel storage tank relief valve piping; updated 26FEB15
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 13 November 2018
Resolution: Cleared by attending CG MI.
Lifesaving › Lifeboat › Hull
Issued 14 July 2011 Resolved
Electrical receptacles on all lifeboats shall be replaced with pull free type.
Condition: Design Flaw
Due 17 April 2015
Resolved 26 February 2015
Resolution: Pull free devices installed
Engineering › Fuel Oil Storage/Transfer System › Pump
Issued 14 July 2011 Resolved
Prove shut down of aviation fuel pump by disconnection of static grounding device; prior to conducting any aviation fueling operations.
Action required: 705 - Other - as specified
Resolved 26 February 2015
Resolution: Installed tested, both pumps shutdown upon disconnect
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Pressure
Issued 14 July 2011 Resolved
#1 and #3 gas turbine generators are not to operated until water mist systems are fully commissioned and placed in active service.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 5 March 2015
Resolution: #1 GTG watermist commissioned and staisfactory

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.