← All vessels
GREEN DELTA
Freight Ship · Ro-Ro Cargo Ship class · USCG Oceania District (CGD-O) · Other hulls named GREEN DELTA
GREEN DELTA is a freight ship. The Coast Guard has recorded 23 inspections since 2012, most recently in May 2026, along with 11 deficiencies, 1 operational control and 1 casualty investigation in 2025.
Records from 2012 to 2026. Most recent: inspection, 20 May 2026.
- Built
- Not recorded
- Last inspected
- 20 May 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 11 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 2025
Identity
1351943
9498602 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WELQ
1088871
Flag
UNITED STATES
367185000
Maury page id
psix-1088871
Inspections, by type
…with no type recorded2
Years with a record
10 calendar years (2012–2026)
The 23 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Ro-Ro Cargo Ship class in Maury's sources begin in 1981.
Documentation record
Registered dimensions (L × B × D)639.0 ft × 105.8 ft × 82.9 ft
Registered tonnagegross 59,501 / net 17,850
ITC dimensions (L × B × D)639.0 ft × 105.8 ft × 82.9 ft
ITC tonnagegross 59,501 / net 17,850
BuilderSHIN KURUSHIMA TOYOHASHI SHIPBUILDING CO., LTD · TOYOHASHI-SHI, AICHI, JAPAN
Hull materialSteel
PropulsionDiesel Direct
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portMOBILE, AL
Trade endorsementsRegistry
DocumentationValid · issued 18 August 2026 · expires 30 September 2027
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it17850 - Convention (Subpart B), Net Ton
18056 - Dead Weight, Ton
35002 - Displacement, Ton
59501 - Convention (Subpart B), Gross Ton
18056 - Dead Weight, Ton
35002 - Displacement, Ton
59501 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WELQMMSI 367185000 · active · compulsorily equipped · granted 14 November 2024, expires 14 November 2034
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 23
20 May 2026
Vessel Attendance · Administrative Inspection · MSP Annual Oversight · Annual Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8380433
2 April 2026
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8341309
22 July 2025
Administrative Inspection · Deficiency Check
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8191511
15 April 2025
MSP COI Oversight · Hull Examination · Drydock Exam · Internal Structural Exam · MTSA/ISPS Verification
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8121980
20 March 2025
Administrative Inspection
Administrative · Activities Europe · Activity 8096676
25 February 2025
Administrative Inspection
Administrative · Activities Europe · Activity 8084134
24 February 2025
Administrative Inspection
Administrative · Activities Europe · Activity 8083376
20 February 2025
Type not recorded
No type recorded · Activities Europe · Activity 8202705
10 December 2024
MTSA/ISPS Verification · Initial Certification · MSP Initial Reflag
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8037354
29 April 2024
PSC B
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7899567
1 July 2021
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7241600
24 June 2021
Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7234651
10 March 2021
Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7153576
27 February 2021
PSC B
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7143936
27 October 2020
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7085129
4 February 2020
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6902652
23 October 2019
Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6840254
24 August 2019
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6788140
21 August 2018
Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6518723
13 August 2018
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6503897
16 June 2017
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6172140
2 May 2016
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5863572
20 June 2012
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4338426
Deficiency record · 11
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 December 2024
Resolved
Oil fuel pipes, which, if damaged, would allow oil to escape from a storage, settling or daily service tank having a capacity of 500 liters and above situated above the double bottom, shall be fitted with a cock or valve directly on the tank capable of being closed from a safe position outside the space concerned in the event of a fire occurring in the space in which such tanks are situated... If such an additional valve is fitted in the machinery space, it shall be operated from a position outside this space. The following quick closing valves did not close: a. #2 Diesel Oil Tank (starboard-side lower Engine Room); b. Fuel Oil 24V port-side suction valve; c. Cylinder Oil head tank; d. Waste Oil tank No. 2; e. Diesel Oil to Boiler. Proper operation of valves shall occur prior to vessel departure.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 12 December 2024
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. The Emergency Fire Pump pneumatic supply to suction valve is inoperable.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 December 2024
Resolved
Main and auxiliary machinery essential for the propulsion and safety of the ship shall be provided with effective means for its operation and control. The Fuel Oil inlet low pressure alarms are inoperable on all three generators.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 December 2024
Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. For this purpose, the following functional requirements shall be met... means shall be provided to control leaks of flammable liquid. The Emergency Generator fuel supply hose is leaking; and, there is a leaking Fuel Oil transfer pump (which has a catch pan underneath the pump).
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 December 2024
Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. Terminations and joints in all conductors shall be so made as to retain the original electrical, mechanical, flame-retarding and, where necessary, fire-resisting properties of the cable. Verify/correct the following: spliced electrical cable in overhead in EDG space, spliced wiring with twist connectors in Electrical Room, and in the lower Engine Room (starboard-side) there are two dead-end cables and several cables hanging unsupported from the overhead.
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 12 December 2024
Resolved
The arrangements provided shall be such as to ensure that the safety of the ship in all sailing conditions, including maneuvering, is equivalent to that of a ship having the machinery spaces manned. A personnel alarm must be provided and must annunciate on the bridge if not routinely acknowledged at the ECC or in the machinery spaces. A personnel alarm (dead man alarm) must be provided and must annunciate on the Navigation Bridge if not routinely acknowledged at the centralized control station or in the machinery space. Update Gap Analysis and provide risk mitigation plan to operate in PUMS until such an alarm is installed by next dry-dock. (NOTE: an acceptable risk assessment/mitigation plan was provided on 18DEC2024).
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 12 December 2024
Resolved
Administration shall give special consideration to... the location and centralization of the fire-extinguishing system controls... All required fire pump control locations must include the controls necessary to charge the fire main and have (1) a fire main pressure indicator or (2) a fire main low pressure alarm. The Emergency Gear Locker Control Station does not have a fire main pressure indicator. Update Gap Analysis and provide risk mitigation plan to operate in PUMS until such an indicator is installed by next dry-dock. (NOTE: an acceptable risk assessment/mitigation plan was provided on 18DEC2024).
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 December 2024
Resolved
Measures shall be taken to the satisfaction of the Administration to ensure that the equipment is functioning in a reliable manner and that satisfactory arrangements are made for regular inspections and routine tests to ensure continuous reliable operation. Tests must verify that automated vital systems are designed, constructed, and operate in accordance with all applicable requirements... The tests must be based upon the failure analysis,..., functional performance requirements, and the Periodic Safety tests. All PSTPs need to be verified, and at a minimum the following need to be updated by next dry-dock:
a. Testing of generator exhaust temperatures;
b. Steering gear alarm "high temperature" should be low level;
c. Indication of manual over-speed trip (push button) of generators (though this is not applicable);
d. Jacket water set point alarms at 85 degrees (vs. the stated 90 degrees);
e. Update procedure 6-D-2 for Emergency Generator fail alarm;
f. Procedure 6-D-7 states EDG overspeed should shut down the engine, however it currently only alarms (and does not shutdown);
g. Procedure 7-A-3 for Auxiliary Boiler high water alarm setting is listed as 220mm, however should be 110mm;
h. Update procedure 7-A-4;
i. Update procedures 7-A-7 and 7-A-8 for Auxiliary Boilers fuel oil inlet low and high;
j. Update procedure 7-A-9 (title “Alarm and Trip”);
k. For procedure 7-A-10, the vessel does not have the proper testing equipment, and update for the set point;
l. Procedure 7-A-11, salinity high alarm (review and update);
m. Update procedures 7-B-1 through 7-B-16 (for the Incinerator);
n. Update procedure 6-G-3 to list the correct sequential start equipment.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 December 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Complete the following as worklist items by completion of next drydock:
a. Verify and provide evidence that oil mist detection is not required on the three vessel generators;
b. Generators 1 and 3 have evidence of jacket water leakage, correct as necessary;
c. Obtain and calibrate all proper testing equipment for conducting PSTPs;
d. Correct broken Fuel Oil Shifter Pump Gauge;
e. Verify the material of drinking water piping onboard and provide details on acceptable usage for the PVC piping made in accordance with JIS K6742 (based on ISO 1452-1 and ISO 1452-2);
f. Correct inoperable EDG Cooling Water Temperature high alarm;
g. Insulation on Diesel Oil Tank (Port) valve shows signs of oil soakage;
h. No relief valves on the air receivers (install or verify acceptance as is);
i. Correct small leak on Fuel Oil Purifier #2.
01 - Certificates & Documentation › 012 - Crew Certificates › Endorsement by flagstate
Issued 13 August 2018
Resolved
The endorsements referred to in paragraphs 5, 6, and 7 of STCW regulation I/2 shall expire as soon as the certificate endorsed expires. Multiple Japanese endorsements issued to the ship's crew have expiration dates beyond the certificate they endorse. - '78 STCW I.2.8.4
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 August 2018
Resolved
To discharge ballast water into U.S. Waters, the Master in charge of a vessel subject to 33CFR151.2025 must ensure the water meets discharge standards in 151.2025(a), use an AMS (151.2025(a)(3)) or ballast with water from a U.S. public water system. The vessel's owners did not have a ballast water treatment system installed at its dry-docking in June 2018. The vessel's management does not plan to discharge in the U.S. and acknowledges it is not authorized to do so.
Casualty record · 1
20 February 2025Routine · role: Involved in a Marine Casualty · activity 8202705
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
ERIDANUS LEADER (2025). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.